ATTACIDIENT 4
i MARKED-UP TECIINICAL SPECIFICATION PAGES FOR CATAWBA t
i i
I 1
I I
t t
I i
(
t 9305180164 930512 PDR ADDCK 05000413 P
q 1ABLE 3.3-3 (Continued) n>
Y ENGINEERED SAFETY FEATURES AC10ATION SYSTEM INSTRUNENTATION g
g MINIMUM
_e.
TOTAL NO.
CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION 8.
Auxiliary Feedwater (Continued) m g.
Auxiliary Feedwater Suction Pressure-Low
- 1) CAPS 5220, 5221, 3/ pump 2/ pump 2/ pump 1, 2, 3 15 a -
l 5222
- 2) CAPS 5230, 5231, 5232 3/ pump 2/ pump 2/ pump 1, 2, 3 15 (N l
9.
Containment Sump q
Recirculation a.
Automatic Actuation 2
1 2
1,2,3,4 14
[
logic and Actuation Relays s
b.
Refueling Water Storage Tank Level-Low 4
2 3
1,2,3,4 16cv l
Coincident With Safety Injection See Item 1. above for all Safety Injection initiating functions and requirements.
10.
Loss of Power g=
I a.
4 kV Bus'Undervoltage-3/ Bus 2/ Bus 2/ Bus 1,2,3,4 15 ES Loss-of Voltage EE b.
4 kV Bus Undervoltage-Grid Degraded Voltage 3/ Bus 2/ Bus 2/8us 1, 2, 3, 4 15 11.
Control Room Area
.yj Ventilation Operation a.
Automatic Actuation Logic and Actuation Relays 2
1 2
All 24 me l
t
TAB'E 3.3-3 (Continued)
L 9#
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ai>
E MINIMUM Z
TOTAL NO.
CHANNELS CHANNELS APPLICABLE
]
FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION 11.
Control Room Area Ventilation Operation (Continued) b.
Loss-of-Offsite Power 3
2 2
1,2,3 15 cv c.
Safety Injection See Item 1. above for all Safety Injections initiating functions and requirements.
12.
Containment Air Return and Hydrogen Skimmer Operation w1 w
a.
Manual Initiation 2
1 2
1,2,3,4 18 4
N b.
Automatic Actuation Logic and Actuation Relays 2
1 2
1,2,3,4 14 cv l
c.
Containment Pressure-High-High 4
2 3
1,2,3 16 FF 13, Annulus Ventilation Operation E$
a.
Manual Initiation 2
1 2
1,2,3,4 18 b.
Automatic Actuation Logic l
&,5 and Actuation Relays 2
1 2
1,2,3,4 14 m c.
Safety Injection See Item 1. above for all Safety Injection initiating functions and requirements.
gg aa
- 0 3 14.
Nuclear Service Water Operation m-a.
Manual Initiation 2
1 2
1,2,3,4 18 b.
Automatic Actuation Logic and Actuation Relays 2
1 2
1,2,3,4 21 cu l
l t
THESE ADDITIONAL ACBON STATEh!ENTS TO BE INSERTED FOLLOWING THE l
RESPECTIVELY-NUhiBERED ACTION STATEhiENTS OF TABLE 3.3-3:
j ACTION 14a -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; l
however. one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1, pmvided the other channel is OPERABLE.
l ACTION 15a -
With the number of OPERABLE channels one less than the Total Number of Channels, operation may pmceed until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within I hour.
j ACTION 16a -
With the number of OPERABLE channels one less than the Total Number
)
of Channels, operation may proceed provided the inoperable channel is i
placed in the bypassed condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per SpeciGeation 4.3.2.1.
ACTION 16b -
With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisGed:
i The inoperable channel is placed in the tripped condition within 1 a.
hour,and b.
The Minimum Channels OPERABLE requirement is met; l
however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per SpeciGcation 4.3.2.1.
ACTION 21a -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance
[
testing per SpeciGeation 4.3.2.1 provided the other channel is OPERABLE.
f r
6 f
.I
s -
11
[
~
~
[Mke ibuer Company am Carauha %uclear Generutwn Department i....re.udent NIO Concord Road (W13)h313205 0ffu e krk. SC 29745 Mulial3426 In DUKE POWER May 12,1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Proposed Changes to Technical Specifications 3/4.3.1 and 3/4.3.2 Increased Surveillance Test Intervals and Allowed Outage Times for Reactor Trip System (RTS) and Engineered Safety Features Actuation System (ESF/.S)
Instrumentation
References:
- 1. Letter from M.S. Tuckman to NRC, dated January 25, 1993
- 2. Letter from Charles E. Rossi to Roger A. Newton, dated February 22,1989 Gentlemen:
During a recent conversation between R.E. Martin (NRC) and L.J. Rudy (DPCo), it was noted that in Reference 1, the proposed Action 14a of Table 3.3-3 (Engineered Safety Features Actuation System Instrumentation, Containment Sump Recirculation Functional Unit 9a, Automatic Actuation Logic and Actuation Relays) contained an eight-hour requirement to be in hot standby when the conditions of the action statement are not met. In Reference 2, a twelve-hour requirement to be in hot standby had been previously approved by the NRC for this functional unit. Therefore, the proposed Action 14a is actually more conservative than what was previously approved by the NRC. Also, the proposed Action 14a contains a two-hour allowance for bypass of a channel for surveillance testing whereas Reference 2 previously approved a four-hour allowance.
By this letter, Catawba is modifying the technical specification amendment request submitted in Reference I to request the full amount of relief previously approved by the NRC for this functional unit. The marked-up technical specification pages which reflect this request are attached. (Note that Functional Unit 9a will now refer to Action 14 of the Reference I submittal; Action 14a of Reference I will be deleted; and Action 14b of Reference I will be renumbered as the new Action 14a.) The conclusions of the original safety analysis and No i
Significant Hazards Consideration Analysis continue to remain valid as a result of tids additional 750 5 (6 O I5 9 5 ff,
-.,,n..
r Document Control Desk l
May 12,1993 Page 2 request.
l If you have any questions concerning this material, please call L.J. Rudy at (803) 831-3084.
Very truly yours, L
A*-
f M.S. Tuckman i
U R/s Attachment xc (W/ Attachment):
S.D. Ebneter, Regional Administrator Region II W.T. Orders, Senior Resident Inspector I
R.E. Martm ONRR Heyward Shealy, Chief Bureau of Radiological Health, SC American Nuclear Insurers l
M&M Nuclear Consultants INPO Records Center i
[
i i
- t i
l Document Ccntrol Desk I
May 12,1993 Page 3 M.S. Tuckman, being duly swom, states that he is Vice President of Duke Power Company; that he is authorized on the pan of said Company to sign and file with the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station License Nos. NPF-35 and NPF-52 and that all statements and matters set forth therein are true and correct to the best of his knowledge.
(
\\
,) ' \\ Ld4w~
M.S. Tuckman, Vice President 5
Subscribed and swom to before me this 12th day of May,1993.
O C fl W ll4 0 rrto; M 3
?
Notary Public l
i i
My commission expires:
Nasary Publ.c south Carolina State at Large c
- y Commeon Empses Aug. 5,1993 i
l I
?
6 I
f e
i s
f t
4 i
r e
r wi;
t i
a ATTACIDIENT t
MARKED-UP TECIINICAL SPECIFICATION PAGES FOR CATAWBA i
l e
I l'
I i
r g
r f W lb U fdSCf ' /l,
\\
~
TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION HINIMUM g
4 x
10TAL NO.
CHANNELS CHANNELS APPLICABLE d
FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION
[
8.
Auxiliary Feedwater (Continued) m g.
Auxiliary Feedwater Suction Pressure-Low
- 1) CAPS 5220, 5221, 3/ pump 2/ pump 2/ pump 1,2,3 15 cu l
5222
- 2) CAPS 5230, 5231, 5232 3/ pump 2/ pump 2/ pump 1, 2, 3 15 w l
9.
Containment Sump y
Recirculation a.
Automatic Actuation 2
1 2
1,2,3,4 14 Y
logic and Actuation U
Relays b.
Refueling Water Storage Tank Level-Low 4
2 3
1,2,3,4 16cv l
Coincident With Safety Injection See Item 1. above for all Safety Injection initiating functions and gg requirements.
10.
Loss of Power a.
4 kV Bus Undervoltage-3/ Bus 2/ Bus 2/ Bus 1, 2, 3, 4 15 f.
55 Loss of Voltage EE b.
4 kV Bus Undervoltage-Grid Degraded Voltage 3/ Bus 2/ Bus 2/ Bus 1, 2, 3, 4 15 11.
Control Room Area
{j Ventilation Operation a.
Automatic Actuation Logic gg and Actuation Relays 2
1 2
All 24
9 TABLE 3.3-3 (Continued)
ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ai E
MINIMUM 4
Z TOTAL NO.
CHANNELS CHANNELS APPLICABLE
]
FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE MODES ACTION 11.
Control Room Area Ventilation Operation (Continued) b,c Loss-of-Of fsite Power 3
2 2
1,2,3 15 cv c.
Safety Injection See Item 1. above for all Safety Injections initiating functions and requirements.
12.
Containment Air Return and Hydrogen Skimmer Operation w
A w
a.
Manual Initiation 2
1 2
1,2,3,4 18 4
b.
Automatic Actuation Logic and Actuation Relays 2
1 2
1,2,3,4 14 w l
c.
Containment Pressure-High-High 4
2 3
1,2,3 16 FF 13.
Annulus Ventilation Operation aa
@R a.
Manual Initiation 2
1 2
1,2,3,4 18 b.
Automatic Actuation Logic yy and Actuation Relays 2
1 2
1,2,3,4 14 s l
c.
Safety Injection See Item 1. above for all Safety Injection initiating functions and requirements.
oo??
14.
Nuclear Service Water Operation m,.
a.
Manual Initiation 2
1 2
1,2,3,4 18 b.
Automatic Actuation Logic and Actuation Relays 2
1 2
1,2,3,4 21 cu l
THESE ADDITIONAL ACTION STATEhfENTS TO BE INSERTED FOLLOWING THE RESPECTIVELY-NUMBERED ACTION STATEMENTS OF TABLE 3.3-3:
ACTION 14a -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; howeer, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance i
testing per SpeciGcation 4.3.2.1, provided the other channel is OPERABLE.
i ACTION 15a -
With the number of OPERABLE channels one less than the Total Number of Channels, operation may pmceed until performance of the next required ANALOG CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within I hour.
ACTION 16a -
With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypasred condition and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Speci6 cation 4.3.2.1 ACTION 16b -
With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed l
provided the following conditions are satisned:
a.
The inopemble channel is placed in the tripped condition within I hour,and b.
The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Speci0 cation 4.3.2.1.
ACTION 21a -
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.md in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 pmvided the other channel is OPERABLE.
I
- -