Text
..,, -
~
l+ !bw conim usTmm ca : i Wirw Gm ' on De;>e:w w she Pnwient O % con:m!Le:t (m:3;h313205 Offa e WxXbGi
!F33631-3M lh
.: A y2n DtJKE POWER l
l May 12,1993 U.S. Nuclear Regula'ory Commission ATIN: Document Contml Desk Washington, D.C. 20555 l
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Proposed Changes to Technical Specifications 3/4.3.1 and 3/4.3.2 l
Increased Surveillance Test Intervals and Allowed Outage Times for Reactor Trip l
System (RTS) and Engineered Safety Features Actuation System (ESFAS) l Instrumentation l
l
References:
- 1. Ixtter from M.S. Tuckman to NRC, dated January 25,1993 l
- 2. Letter from Charles E. Rossi to Roger A. Newton, dated February 22,1989 Gentlemen:
l l
l Durine a recent conversation between R.E. Martin (NRC) and L.J. Rudy (DPCo), it was noted l
that in Reference 1, the proposed Action 14a of Table 3.3-3 (Engineered Safety Features l
Actuation System Instrumentation, Containment Sump Recirculation Functional Unit 9a, Automatic Actuation Logic and Actuation Relays) contained an eight-hour requirement to be in N
hot standby when the conditions of the action statement aie not met. In Reference 2, a twelve-hour requirement to be in hot standby had been previously approved by the NRC for this functional unit. Therefore, the proposed Action 14a is actually more conservative than what was previously appmved by the NRC. Also, the proposed Action 14a contains a two-hour allowance for bypass of a channel for surveillance testing, whereas Reference 2 previously approved a four-hour allowance.
By this letter, Catawba is modifying the technical specification amendment request submitted in Reference I to request the full amount of relief previously approved by the NRC for this functional unit. The marked-up technical specification pages which reflect this request are attached. (Note that Functional Unit 9a will now refer to Action 14 of the Reference I submittal; Action 14a of Reference I will be deleted; and Action 14b of Reference I will be renumbered as the new Action 14a.) The conclusions of the original safety analysis and No Significant Hazards Consideration Analysis continue to remain valid as a result of this additional r
93051eo159 930512 DR ADOCK 0500 3
'gj
_,,e
Document Control Desk May 12,1993 Page 2 request.
If you have any questions concerning this material, please call L.J. Rudy at (803) 831-3084.
Very truly yours, s
hbfl 2/tu---
M.S. Tuckman IJR/s Attachinent xc (W/ Attachment):
S D. Ebneter. Regional Administrator Region II W.T. Orders. Senior Resident I: spector R.E. Martin ONRR Ileyward Shealy, Chief Ilureau of Radiological Health, SC American Nuclear Insurers M&M Nuclear Consultants INP() Records Center
j I
t j
'I Document Control Desk l
May 12,1993 i
Page 3 l
I M.S. Tuckman, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the pan of said Company to sign and file with the Nuclear Regulatory I
Commission this revision to the Catawba Nuclear Station License Nos. NPF-35 and NPF-52 and
-l that all statements and matters set fonh therein are true and correct to the best cf *1is knowledge.
I i
I
(
\\
\\ LT n
M.S. Tuckman, Vice President t
I i
Subscribed and sworn to before me this 12th day of May,1993.
l l
1
'0 CLl U (0LQ nuy U tE!LY l
Notary Public l
My commission expires:
Notary hbbc, South Carolms state at Large My Comnha Wares Aug_5,1993 4