ML20034B314
| ML20034B314 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/12/1990 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20034B313 | List: |
| References | |
| NUDOCS 9004260388 | |
| Download: ML20034B314 (2) | |
Text
l' l
1 i
1 ATTACHMENT I PROPOSED CHANGES.TO THE TECHNICAL SPECIFICATIONS I
f L
l J
i Y
'9004260388 900412 _,
PDR fiDOCK0500g,o P
e
kbl-t *ewW q
3 3,..; >
a f E=
~
DESIGN FEATURES
-u t
{j-DESIGN PRESSURE AND TEMPERATURE
} f m, 5.2.2-The reactor containment vessel is designed and shall be maintained for a maximum internal pressure of 15 psig and a temoerature of 328 F.
m Ol 5.3 REACTOR CORE FUEL ASSEMBLIES
'l h{7 5.3.1~ The core shall'contain'193 fuel assemblies with each fuel assembly l) nominally containing 264 fuel rods clad with Zircaloy-4, excent that substitu-
{ tions of fuel rods by filler rods consisting of Zircaloy-4 or stainless steel, T,$ v or by vacancies, may be made Lin fuel assemblies if justified by cycle-specific-5 reload analyses using NRC-approved methodology.
Should more-than 30 rods in
@ Q the core, or 10 rods in any. assembly, be replaced per refueling, a special g report describing.the number of rods replaced ~will be submi.tted to the commis--
gd sion pursuant to Specification 6.9.2 within 30 days after cycle startup.
Each Q fuel rod shall have a nominal active fuel length of 144 inches.
Reload fuel o
k go shall be similar in physical design to the initial core loading and shall have 5my a maximum enrichment of 4.0 weight percent U-235 with a maximt.:a enrichment J1H tolerance of.
0.05 weight percent U-235.
(D CONTROL R0D ASSEMBLIES y
U k$ 5. 3. 2 The core shall contain 53 full-length control rod assemblies.
The full-
=0J length control rod assemblies shall contain a nominal 142 inches of absorber 0.p w material of which 102 inches shall be 100% boron carbide and remaining 40-inch 46 tip shall be 80% silver, 15% indium, and 5% cadmium.
l N"
Y lt -1, "l umTro l r shrai:be %u iurate'-iess stac1 t " g.
$w 8
2 7 "3 r Un
, all co 01 rods, e t for the rol rods i Rod Clus r o
E Con As RCC sh be c stain s
tubing.
r nin.
t, ms4er C
. J Assc 21, conm :1 rods i., con ^.
-g as'h ct 5.4 REACTOR COOLANT SYSTEM
~ >
1 4,_-
DESIGN PRESSURE AND TEMPERATURE k$
5.4.1 The Reactor Coolant System is designed and shall be maintained:
1 9 4 5
a.
In accordance with the Code requirements specified in Section 5.2 os d-
- O of the FSAR, with allowance for normal degradation pursuant to the applicable Surveillance Requirements, b.
For a pressure a 2485 psig, and c.
For a temperature of 650 F, except for the pressurizer which-is 680 F.
VOLUME 5.4.2 The total water and steam volume of the Reactor Coolant System is
' i 12,040 100 cubic feet at a nominal T f 525 F.
avg 5.5 METEOROLOGICAL TOWER LOCATION 5.5.1 The meteorological tower shall be located as shown in Figure 5.1-1.
(
CATAWBA - UNITS 1 & 2 5-6 Amendment No. 64 (Unit 1) l Amendment No. 58 (Unit 2) 4t/