Forwards Safety Evaluation Accepting Rev 3 to First 10-yr Interval Inservice Insp Program
ML20034A005
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/03/1990
From: Hebdon F
Office of Nuclear Reactor Regulation
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20034A006 List:
References
TAC-69352, NUDOCS 9004190144
Download: ML20034A005 (4)


Text

e April 3. 1990 Docket No. 50 458 Gulf States Utilities Company ATTN: Mr. James C. Deddens SeniorVicePresident(RENG)

Post Office Box 220 St. Francisv111e, Louisiana 70775

Dear Mr. Deddens:

SUBJECT:

REVISION 3 TO THE FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM - RIVER BEND STATION, UNIT NO. 1 (TAC NO. 69352)

By letter dated September 2,1988, as supplemented August 29, 1989 and revised January 25, 1990, Gulf States Utilities submitted Revision 3 to the First Ten. Year Interval Inservice Inspection Program Plan for the River Bend Station, Unit No. 1.

Revision 2 was previously reviewed and evaluated by the NRC staff.

as-documented in letters dated October 20, 1987 and August 1, 1988. The NRC staff, with technical assistance from the Idaho National Engineering Laboratory, reviewed and evaluated the changes to the program contained in Revision 3.

A copy of the staff's safety Evaluation is enclosed.

First Ten-Year Interval The staff concludes that the River Bend Station, Unit 1,ith the information Inservice Inspection Program Plan, through Revision 3, w provided and the specific written relief, constitutes the basis for conipliance with 10 CFR 50.55a(g) and the Technical Specifications and is therefore acceptable.

Table 1 of the enclosed Safety Evaluation presents a summary of the reliefs requested and the status of the requests as determined by the staff.

Sincerely,

/s/

Frederick J. Hebdon, Director Project Directorate IV Division of Reactor Projects - III, IV, Y and Special Frojects Office of Nuclear Reactor Regulation

Enclosure:

j As stated cc w/ enclosure:

See next page DISTRIBUTION

    • Docket FlTe7 NRC PDR Local PDR PD4 Reading

-G. Holahan MS 13E4 F. Hebdon P. Noonan W. Paulson OGC.Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P-315 PD4 Plant File PbT/W O

OtC
TV4

~

OFC :PD4/LA.

L.:....4yK....:............:....

HAME:PNoon{

I a

WPaulson:bj : [h F6
FHeb DATE :03/ h......

/90

03/g/90
03/LI/90
05'/ 3 /90

'4~

. OF F1CI AL RECORD 7DTY DocumentTie: RB L7R~/0352~~~~~

~]T'T~~

9 9004190144 900403 PDR ADOCK 05000458

}\\

Q PDC

t l

0

  • y_

s April 3, 1990 I

~

'

  • Docket No. 50-458 Gulf States Utilities Company ATTN: Mr. James C. Deddens

~

SeniorVicePresident(RBNG)

Post Office Box 220 St. Francisville, Louisiana 70775

Dear Mr. Deddens:

SUBJECT:

REVISION 3 TO THE FIRST TEN. YEAR INTERVAL INSERVICE INSPECTION i

PROGRAM - RIVER BEND STATION, UNIT NO. 1 (TAC NO. 69352)

By letter Cated September 2,1988, as supplemented August 29, 1989 and revised January 25, 1990, Gulf States Utilities submitted Revision 3 to the First Ten. Year Interval Inservice Inspection Program Plan for the River Bend Station, Unit No. 1.

Revision 2 was previously reviewed and evaluated by the NRC staff as documented in letters dated.0ctober 20, 1987 and August 1, 1988. The NRC staff, with technical assistance from the Idaho National Engineering Laboratory, reviewed and evaluated the changes to the program contained in Revision 3.

A copy of the staff's Safety Evaluation is enclosed.

The staff concludes that the River Bend Station Unit 1, First Ten-Year Interval Inservice Inspection Program Plan, through Revision 3, with the information provided and the specific written relief, constitutes the basis for conipliance with 10 CFR 50.55a(g) and the Technical Specifications and is therefore acceptable.

Table I of the enclosed Safety Evaluation presents a summary of the reliefs requested and the status of the requests as determined by the staff.

Sincerely,

/s/

Frederick J. Hebdon, Director Project Directorate IV Division of Reactor-Projects. III.

IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated l

l cc w/ enclosure, l

See next page DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 F. Hebdon P. Noonan W. Paulson-OGC-Rockville E. Jordan MS MNBB 3701 ACRS (10) MS P-315 PD4 Plant File OFC :PD4/LK

PDT/P e :MC

~lM4/

e.... :..... /.

3....:............:....

@AME :PNoona

WPaulson:bj : [h f^6
FHeb 6.... :...h....... :............ :............ :............ :............ :

@ ATE 203/ /90

03/Jf/90
03/u /90
95/ 3 /90 9

~

OFFICIAL REDRD7DPY DbTuirie nYYaiiie':T'ik f6M57' " ~~

~ ~ ~ " ~ ~ ~ " " -

i 1

, w

/

~ ~%,

UNITE 3 8TATES NUCLEAR REGULATORY COMMISSION

'I

.f wAssiwoTow, o, c. 20sss April 3, 1990 Docket No. 50-458 Gulf States Utilities Company ATTN: Mr. James C. Deddens SeniorVicePresident(R3NG) i Post Office Box 220 St. Francisv111e, Louisiana 70775

Dear Mr. Deddens:

SUBJECT:

REVISION 3 TO:THE FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION

~

PROGRAM - RIVER BEND STATION, UNIT NO. 1 (TAC NO. 69352)

By letter dated September 2, 1988 as supplemented August 29, 1989 and revised January 25, 1990 GulfStatesUtilitiessubmittedRevision3totheFirst i

Ten-Year Interval Inservice Inspection,Progr-2m Plan for the River Bend Sutton, j

Unit No. 1.

Revision 2 was previously reviewed and evaluated by the NRC steft as documented in letters dated October'20, 1987 and August 1, 1988. The NRC l

staff, with technical assistance from the Idaho National Engineering Laboratory, reviewed and evaluated the. changes to the program contained in Revision 3.

1 A copy of-the staff's Safety Evaluation is enclosed.

The staff concludes that the River Bend Station, Unit 1. First Ten-Year Interval Inservice Inspection Program Plan, through Revision 3 -with the information provided and the specific written relief, constitutes the basis for compliance with10CFR50.55a(g)andtheTechnicalSpecificationsandistherefereacceptable.

Table 1 of the enclosed Safety Evaluation presents a sumary of _the reliefs-requested and the status of the requests as determined-by the staff.

Sincerely, 1

Lug. /JsA Frederick J. He don, Director -

Project Directorate IV' Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See ncxt page q

j

Mr. James C. I,edder.s Gulf States Utilities Company River Bend Nuclear Plant cc:.

Troy B. Conner, Jr., Esq.

Mr. J. E. Booker Conner and Wetterhahn Manager-Nuclear Industry Relations 1747 Pennsylvania Avenue, NW P. O. Box 2951 Washington, D.C.

20006 Beaumont, TX 7770a Mr. Les England Mr. William H. Spell, Administrator Director - Nuclear Licensing Nuclear Energy Division Gulf States Utilities Company Office of Environmental Affairs.

P. O. Box 220 P. O. Box 14690 St. Francisville, LA 70775 Baton Rouge, Louisiana 70898 Richard M. Tioy, Jr., Esq.

Assistent Attorney General in Charge Mr. J. David McNeill, III State of Lcuisiana Department of Justice William G. Davis, Esq.

234 Loyola Avenue Department of Justice New Orleans, Louisiana 70112 Attorney General's Office P. O. Box 94095 Pesident Inspector.

Baton Rouge, Louisiana 70804-9095 P. O. Box 1051 St. Francisv111e, Louisiana 70775 H. Anne Plettinger 3456 Villa Rose Drive President of West Feliciana Baton Rouge, Louisiana 70806 Police Jury P. O. Box 1921 St. Francisville, Louisiana 70775 Philip G. Harris Cajun Electric Power Coop. Inc.

Regieral Ahrinistrator, Pegion IV 10719 Airline Highway U.S. Nucleer Regulatory Commission P. 0.-Box 15540 Office of Executive Director Daton Rouge, LA 70895 j

for Operatinns q

C11 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 i

l 2

4