VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH septemberYEAR 1981 (Revised 11-05-B1)
APPROVED:
6 STATION MANAGER
(/
8111190727 811113 PDR ADOCK 05000338 R
}
OPERATING DATA REPORT DOCKET NO.
50-338 DATE 10-05-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes
- Corrects reevaluation 1.
Unit Name:
North Anna 1 2.
Reporting Period: September 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consamption.
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net NWe):
907 6.
Maximum Dependable Capacity (Gross MWe): *918 7.
Maximum Dependable Capacity (Net MWe):
865 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 6,551 29,112 12.
Number of Hours Reactor Was Critical 720 4,243.8 22,216.9
- 13. Reactor Reserve Shutdown Hours 0
13.8 226.9
- 14. Hours Generator On-Line 720 4,124.8 21,772.9
- 15. Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,929,551 10,897,224 56,065,927 17.
Gross Electrical Energy Generated (MWH) 620,516 3,540,720 17,875,632 18.
Net Electrical Energy Generated (MWH) 586,022 3,341,231 16,826,234
- 19. Unit Service Factor 100 62.9 74.8 20.
Unit Availability Factor 100 62.9 74.8
- 22. Unit Capacity Faciv- (Using DER Net) 89.7
_ 58.9 66.8
- 21. Unit Capacity Fari?r (Using MDC Net) 94.1 56.2 63.7 5.1
- 23. Unit Forced Outage Rate O_
1.3 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Eachj; Fall Maintenance 05-81 thru 10-23-81 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
~
INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATING DATA REPORT DOCKET NO.
50-339 DATE 10-05-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes
- Corrects reevaluation 1
1.
Unit Name:
North Anna 2 2.
Reporting Period: September 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consumption.
4.
Nameplate Rating (Gross NWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe): __,9 39
- 7.. Maximum Dependable Capacity (Net MWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 6,551 6,983 12.
Number of Hours Reactor Was Critical 670.2 4,791.1 5,220
- 13. Reactor Reserve Shutdown Hours 0
1,341.4 1,621.4
- 14. Hours Generator On-Line 666.1 4,649.1 5,061.8 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,802,899 11,904,002 12,990,999 17.
Gross Electrical Energy Generated (MWH) 608,189 4,009,928 4,378,359 18.
Net Electrical Energy Generated (NWH) 576,864 3,791,660 4,141,304 19.
Unit Service Factor 92.5 70.9 72.5 20.
Unit Availability Factor 92.5 70.9 72.5 66.6 21.
Unit Capacity Factor (Using MDC Net) 90.0 65.0 65.4 22.
Unit Capacity Factor (Using DER Net) 88.3 63.8 24.2 23.
Unit Forced Outage Rate 7.5 25.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage 05-82 thru 05-14-82 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION