Revised Monthly Operating Repts for Jul 1981
ML20032E155
Person / Time
Site: North Anna  
Issue date: 11/05/1981
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20032E138 List:
References
NUDOCS 8111190721
Download: ML20032E155 (3)


Text

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH July YEAR __.1281 (Revised 11-05-81) 4 APPROVED:

/

"' / c. &

STATION MANAGER 8111190721 811113 DR ADOCK 05000

OPERATING DATA REPORT DOCKET NO.

50-338 DATE 08-05-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.

Unit Name:

North Anna 1

  • Corrects reevaluation 2.

Reporting Period:

July 1981 (Revised 11-05-81) of auxiliary load 3.

Licensed Thermal Power (MWt):

2775 consumption.

4.

Nameplate Rating-(Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe): *918 7.

Maximum Dependable Capacity (Net MWe):

865 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date cumulative 11.

Hours In Reporting Period 744 5,087 27,648

12. Number of Hours Reactor Was Critical 737.4 2,789.4 20,762.5 13.

Reactor Reserve Shutdown Hours 1

4.8 217.9 14.

Hours Generator On-Line 728.1 2,681.4 20,329.5 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,957,605 7,059,205 52,227,908 17.

Gross Electrical Energy Generated (MWH) 634,730 2,310,580 16,645,492 18.

Net Electrical Energy Generated (MWH) 598,636 2,180,715 15,665,718 19.

Unit Service Factor 97.9 52.7 73.5 20.

Unit Availability Factor 97.9 52.7 73.5 21.

Unit Capacity Factor (Using MDC Net) 93.0 49.6 65.5

22. Unit Capacity Factor (Using DER Net) 88.7 47.3 62.4
23. Unit Forced Outage Rate 2.1 1.2 5.4 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Fall Maintenance 02-81 thru 10-16-81 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

N/A

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

OPERATING DATA REPORT DOCKET NO.

50-339 DATE 08-05-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.

Unit Name:

North Anna 2

  • Corrects reevaluation 2.

Reporting Period:

July 1981(Revised 11-05-81) of auxiliary load 3.

Licensed Thermal Power (MWt):

2775 consumption.

4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable Capacity (Gross MWe): *939 7.

Maximum Dependable Capacity (Net MWe):

890 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 5,087 5,519 12.

Number of Hours Reactor Was Critical 14.1 3,779.2 4,208.1 13.

Reactor Reserve Shutdown Hours 744 1,054.8 1,334.8 14.

Hours Generator On-Line 0

3,692 4,104.7 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 311 9,540,212 10,627,209 17.

Gross Electrical Energy Generated (MWH) 0 3,216,123 3,584,554 18.

Net Electrical Energy Generated (MWH) 0 3,041,481 3,391,125 19.

Unit Service Factor 0

72.6 74.4 20.

Unit Availability Factor 0

72.6 74.4 21.

Unit Capacity Factor (Using MDC Net) 0 67.2 69.0 22.

Unit Capacity Factor (Using DER Net) 0 65.9 67.7 23.

Unit Forced Outage Rate 100 23.1 21.6 24.

Shutdowns Schedcled Over Next 6 Months (Type, Date, and Duration of Each):

Fall Maintenance 16-81 thru 10-30-81 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

08-10-81 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION