VIRG1NIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH aune YEAR m (Revised 11-05-81)
APPROVED:
s.
l b
STATION MANAGER u'
CKOdddhhg PDR
OPERATING DATA REPORT DOCKET NO.
50-338 DATE 07-03-81 COMPLETED B7 L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.
Unit Name:
North Anna 1
- - Corrects reevaluation 2.
Reporting Period:
June 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consumption.
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe): *918 7.
Maximum Dependable Capacity (Net MWe):
865 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons.
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720 4,343 26,904 12.
Number of Hours Reactor Was Critical 718.4 2,052 20,025.1 13.
Reactor Reserve Shutdown Hours 1.6 3.8 216.9 14.
Hours Generator On-Line 709.7 1,953.3 19,601.4 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (NWH) 1,933,276 5,101,600 50,270,303 17.
Gross Electrical Energy Generated (MWH) 633,348 1,675,850 16,010,762 18.
Net Electrical Energy Generated (MWH) 598,983 1,582,079 15,067,082 19.
Unit Service Factor 98.6 45 72.9 20.
Unit Availability Factor 98.6 45 72.9 21.
Unit Capacity Factor (Using MDC Net) 96.2 42.1 64.7 22.
Unit Capacity Factor (Using DER Net) 91.7 40.2 61.7 23.
Unit Forced Outage Rate 1.4 0.9 5.5 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance 02-81 thru 10-16-81 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
l OPERATING DATA REPORT DOCKET NO.
50-339 DATE 07-03-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.
Unit Name:
North Anna 2
- Corrects reevaluation 2.
Reporting Period:
June 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consumption.
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe): *939 7.
Maximum Dependable Capacity (Net MWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720
___ 4,343 4,775 12.
Number of Hours Reactor Was Critical 444.7 3,765.1 4,194 13.
Reactor Reserve Shutdown Hours 275.3 310.8 590.8 14.
Hours Generator On-Line 441.8 3,692 4,104.7 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,205,121 9,810,364 10,932,877 17.
Gross Electrical Energy Generated (MWH) 404,242 3,216,123 3,584,554 18.
Net Electrical Energy Generated (MWH) 383,539 3,041,481 3,391,125 19.
Unit Service Factor 61.4 85 86 20.
Unit Availability Factor 61.4 85 86 21.
Unit Capacity Factor (Using MDC Net) 59.9 78.7 79.8 22.
Unit Capacity Factor (Using DER Net) 58.7 77.2 78.3 23.
Unit Forced Outage Rate 38.6 9.0 8.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance 16-81 thru 10-30-81 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
July 2, 1981
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION