- _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ - _ _ -.
VIP.GINIA ELECTRIC AND POWER COMPANY NORTH ANNA F0WER STATION MONTHLY OPERATING REPORT MONTH Aucust YEAR 1981 (Revised 11-05-81)
APPROVED:
///
STATION MANAGER v
8111190723 811113 PDR ADOCK 05000338 R
OPERATING DATA REPORT DOCKET NO.
50-338 DATE 09-03-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.
Unit Name:
North Anna 1
- Corrects reevaluation 2.
Reporting Period:
August 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consumption.
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross NWe): *918 7.
Maximum Dependable Capacity (Net MWe):
865 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report,'Give Reasons; N/A 9.
Power Level To Which Restricted, If Any (Net NWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Montt Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 5,831 28,392 12.
Number of Hours Reactor Was Critical 734.4 3,523.8 21,496.9 13.
Reactor Reserve Shutdown Hours 9
13.8 226.9 14.
Hours Generator On-Line 723.4 3,404.8 21,052.9 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 1,908,468 8,967,673~
54,136,376 17.
Gross Electrical Energy Generated (HWH) 609,624 2,920,204 17,255,116 18.
Net Electrical Energy Generated (MWH) 574,494 2,755,209 16,240,212 19.
Unit Service Factor 97.2 58.4 74.2 20.
Unit Availability Factor 97.2 58.4 74.2 21.
Unit Capacity Factor (Using HDC Net) 89.3 54.6 66.1 22.
Unit Capacity Factor (Using DER Net) 85.1 52.1 63.1 23.
Unit Forced Outage Rate 2.8 1.6 5.3 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance 02-81 thru 10-16-81 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
OPERATING DATA REPORT DOCEET NO.
50-339 DATE 09-03-81 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 OPERATING STATUS Notes 1.
Unit Name:
North Anna 2
- Corrects reevaluation 2.
Reporting Period:
August 1981 (Revised 11-05-81) of auxiliary load 3.
Licensed Thermal Power (MWt):
2775 consumption.
4.
Nameplate Rating (Gross MWe):
947 5.
Design Electrical Rating (Net MWe):
907 6.
Maximum Dependable Capacity (Gross MWe): *939 7.
Maximum Dependable Capacity (Net MWe):
890 8.
If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 6,263 11.
Hours In Reporting Period 744 5,831 _
4,549.8 12.
Number of Hours Reactor Was Critical 341.7 4,120.9 13.
Reactor Ressrve Shutdown Hours 286.6 1,341.4 1,621.4 14.
Hours Generator On-Line 291 3,983 4,395.7 15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated (MWH) 560,891 10,101,103 11,188,100 17.
Gross Electrical Energy Generated (MWH) 185,616 3,401,739 3,770,170 18.
Net Electrical Energy Generated (MWH) 173,315 3,214,796 3,564,440 19.
Unit Service Factor 41.6 68.6 70.5 20.
Unit Availability Factor 41.6 68.6 70.5 21.
Unit Capacity Factor (Using MDC Net) 26.2 61.9 63.9 22.
Unit Capacity Factor (Using DER Net)
'5.7 60.8 62.)
2 23.
Unit Forced Outage Rate 58.4 27.9 26.2 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Fall Maintenance 16-81 thru 10-30-81 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):