ML20032B633
| ML20032B633 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 08/24/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20032B622 | List: |
| References | |
| NUDOCS 8111050736 | |
| Download: ML20032B633 (2) | |
See also: IR 05000369/1981022
Text
-
. --
_ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ .
__-
'
'
Miov
,
,-
AUG e 4 Jggy
Duke Power Company
ATTN: Mr. W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
I
Gentlemen:
Subject: Report No. 50-369/81-22
This refers to the routine safety inspection conducted by Ms. H. J. Graham of
this office on June 15 - July 17,1981, of activities authorized by NRC Operating
License No. NPF-9 for the McGuire 1 facility. Our preliminary findings were -
discussed with Mr. H. D. McIntosh, Plant Manager, at the conclusion of the
inspection.
e
Areas exhmind during the inspection and our findings are discussed in the
enclosed ins'eection report. Within these areas, the inspection consisted of
l
,
selective examinations of procedures and representative records, interviews with
'
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Apperidix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Docun.ent Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
ko[t g K 05000369
I
36 811016
G
_ - _ _ _ _ _ - _ - -
- _
" , .
,.
406 2 4 1981
Duke Power Company
2
part of the affidavit.
.!f we do not hear from you in this regard within .thei
-
specified period; noted above. the report will be placed in the- Public Document
-
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
bfc7Yb
Paul J. Kellogg, Chief
Project Branch 2, Division of
Resident and Reactor Project
Inspection
Enclosures:
1.
Appendix A,' Notice of Violation
2.
Inspection Report No. 50-369/81-22
cc w/ encl:
M. D.11cIntosh, Plant flanager
bec w/ encl:
NRC Resident Inspector =
Document Management Branch
State of North Carolina
l
RII
RII
RII
'[8////81
h
- dr
nt
g
8g/81
8%/81