Forwards IE Insp Rept 50-369/81-22 on 810615-0717 & Notice of Violation
ML20032B633
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/24/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20032B622 List:
References
NUDOCS 8111050736
Download: ML20032B633 (2)


See also: IR 05000369/1981022

Text

-

. --

_ - - _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ .

__-

'

'

Miov

,

,-

AUG e 4 Jggy

Duke Power Company

ATTN: Mr. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

I

Gentlemen:

Subject: Report No. 50-369/81-22

This refers to the routine safety inspection conducted by Ms. H. J. Graham of

this office on June 15 - July 17,1981, of activities authorized by NRC Operating

License No. NPF-9 for the McGuire 1 facility. Our preliminary findings were -

discussed with Mr. H. D. McIntosh, Plant Manager, at the conclusion of the

inspection.

e

Areas exhmind during the inspection and our findings are discussed in the

enclosed ins'eection report. Within these areas, the inspection consisted of

l

,

selective examinations of procedures and representative records, interviews with

'

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Apperidix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Docun.ent Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4). The information

sought to be withheld shall be incorporated as far as possible into a separate

ko[t g K 05000369

I

36 811016

G

PDR

_ - _ _ _ _ _ - _ - -

- _

" , .

,.

406 2 4 1981

Duke Power Company

2

part of the affidavit.

.!f we do not hear from you in this regard within .thei

-

specified period; noted above. the report will be placed in the- Public Document

-

Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

bfc7Yb

Paul J. Kellogg, Chief

Project Branch 2, Division of

Resident and Reactor Project

Inspection

Enclosures:

1.

Appendix A,' Notice of Violation

2.

Inspection Report No. 50-369/81-22

cc w/ encl:

M. D.11cIntosh, Plant flanager

bec w/ encl:

NRC Resident Inspector =

Document Management Branch

State of North Carolina

l

RII

RII

RII

'[8////81

h

dr

nt

g

8g/81

8%/81