ML20031F133

From kanterella
Jump to navigation Jump to search
Responds to 770413 Request for Review of Proposed Position to Sections of Section Xi,Winter 1975 Addenda.Position Is Acceptable,Providing NRC Does Not Endorse Steam Generator Tube Requirements Specified in Code
ML20031F133
Person / Time
Issue date: 04/27/1977
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Kehnemuyi M
NRC OFFICE OF STANDARDS DEVELOPMENT
Shared Package
ML13319A640 List: ... further results
References
FOIA-81-313 NUDOCS 8110190231
Download: ML20031F133 (1)


Text

M UNITED STATES j

NUCLEAR REGULATORY COMMISSION

't p-WASHINGTON, 0. C. 20555 g

., g o

%,..... +/

APR 2 71977 g.Se MEMORANDUM FOR: M Kehnemuyi, Assistant Director for General Engineering Standards, OSD D. Eisenhut, Assistant Director for Operational FROM:

Technology DDR WINTER 1975 ADDENDA, SECTION XI ASME CODE ' INSERVICE

SUBJECT:

INSPECTION OF NUCLEAR POWER PLANT COMPONENTS In response to your requ'est (Memo from W. F. Anderson to B. H. Grier, 13, 1977), the Engineering D. Eisenhut, and J. P. Knight, dated April Branch, Division of Operati.ng Reactors, has reviewed the proposed position to Sections of Section XI, Winter 1975 Addenda and finds that it will be acceptable if the NRC would also not endorra the steam The generator tube inspection requirements specified in the Code.

bases of this recommendation are that:

The additional examinations requirements specified in the code 1.

are less stringent than those.of Regulatory Guide 1.83. Rev.1 and also those of technical specifications.

Regulatory Guide 1.83, Rev. I will be revised shortlyi The code 2.

adoption of S.G. tube inspection requirements should wait until the revision to the Reg. Guide is complete.

Premature endorsement of the code S.G. tube ISI requirements will 3.

create unnecessary workload of granting relief to each PWR plant's ISI program because of the recent changes to 10 CFR 50.55a(g),

" Inservice Inspection Requirements".

l k

[

.fi g

(AMM i

l

.lisenhut, t;sistant Director l

for Operatir. Technology Division of Operating Reactors

Contact:

C. Y. Che.ng 28060 cc:

V. Stello S. Pawlicki l

R. Heineman U. Potapovs B. Grier J. Knight i

W. Anderson W. Hazelton R. Stuart EB Members gg o g 31 slosa7 UDEA1A1-212 angs