ML20031E375

From kanterella
Jump to navigation Jump to search
Tech Spec Page 15.4.2-1c Allowing Operation W/Steam Generator Tubes Sleeved Rather than Plugged
ML20031E375
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/12/1981
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20031E372 List:
References
NUDOCS 8110150438
Download: ML20031E375 (1)


Text

    • -~'.:

r

.m Defeet te' as imperfiction ef cach severity 'that it escoede the =8mf== acceptable tube wall thickness of SOL A tube y

containing a defect le defectiva.

Flerrian Limit is the imperfection depth beyond which the-tube mast be removed free service.becease the taba may.

become defective pring to the-aert acheduled inspection..

The.pluggieg limit is 40% of the ma=fmal tube unti. thickness.

'3. / orrective M6&aares, C

' All' tabes. th5t leak er have.degradaties exceeding'the plugging:

)

1 Limit shall be plugged' prier.to retara to power from a-refueling, or inservice inspection condition.*'

~

C.

Reports e

1.

After each inservice examination, the number of tubes plagged la each steam generator shall be reported to the Cosmissies as soon es practicable.

, 4

. i.

2.

h complete results of the steam generator tube inservice-inspection shall be included la the Operating Report for the period'im which the inspection.was nugpleted. In addities.,

411 resulte'la. Category C-3 of Table.15.4.2-1 shairbe reportedito the Commissica prior?te resnaption of/ plant operattocn-c 3;. Esports shall include V p

(a); Number and'~ extent istitubes.inspeci.ed (b)' Eocatioo a:nd' percent' d all thickness' penetration for i'

[,

each Inditatima s

', ~

(c) Identifics' ties of tabes p1'ugged 4.

Reports required by Table 15.4.2 Steen Generator Tube Inspection shall provide the information requited.by Specifi-cetion 15.4.2.C.2 and a description of investigations goaducted te determine' come of 'the tabe~ degradation and corrective

  • ~'

measmres.tahe to prevent recurrence.-

Q,..

..~BL. T&-serviite Inspection of' Reactor Coolant System components other Than

~

'. )...

Steam Generator Tubes

~

W,"M.

w N 'in-service inspect 1~on progra,m is genere11p has~ed on the recessendations-of'AstE Boiler sad presente Vessel Code, section II, smener.1971 aAAmada as practitel for a plant whose design and construction preceded' issaemoe '

K of the reca==*aAmtions.

The coendtsents hereia are made assuming that t-the necessary inspectica

. " ' # Point Beach Naclear Plaat Iksit I may be operated at, power with up to sia

)

  • ~.

~ tubes la one steam generator havias degradation areeeding the. plugging ifmit '

provided these tabes.have been repaired by inserttoa of sleeves into the-

'i i

tubes-to bridge the degradedter defelctive portion ' f the taba.

o p.

~

8T10359 fft

^ ~.,....

  • 1s.t.s-Ic t

. = =

.