Text
MKU$
. 4>9 MC f
k UNITED STATES
], *y[ *.-
NUCLEAR REGULATORY COMMISSION 7
- g WASHINGTON, D. C. 20555 J
~*'e' C
1
'+
June 26,1981 MEMORANDUM FOR:
Frank G. Pagano, Chief Emergency Preparedness Licensing Bra Office of Inspection & Enforceme Falk Kantor FROM:
Emergency Preparedness Licensing Branch Office of Inspection & Enforcement
SUBJECT:
POPULATION DATA FOR.ILGRIM-2 6
A comparability check has been made of the 0-10 mile populatien data used in the alternative site study and in the evacuation study for the Pilgrim-2 case, The results are shown in Table 1.
The alternative site study population was reported in the Final Supplement to the Final Environmental Statement (FS FES) dated May 1979. The population numbers in the study were based on data in the PSAR 'and ER and on data de-veloped independently by the staff.
The population reported in the FS FES was updated by the staff in testimony on the alternative site issue ir. August 1979 to account for revised population data (primarily *evised data on seasonal residents) reported in a study done by ERT, Inc., which was made available by the applicant just prior to the hearing.
In amendment 41 to the PSAR dated March 1981, the applicant has presented pop-ulation data for the plume eyosure EPZ which was utilized in determining evac-The population data in Amendment 41 were based on data uation time estimates.
from the PSAR, che ERT study, and on newer, updated population estimates de-veloped by HMM Associates (a consulting firm which has evidently replaced ERT).
i The comparison in Table 1 shows that differences exist in the population values l
used by the staff in the alternative site hearing and those currently being used As the staff's popu-by the staff for determining evacuation time estimates.
lation data and methodology in the alternative site hearing are being challenged l
by the Commonwealth of Massachusetts and a hearing is upcoming on the evacuation issue in which the Commonwealth is a party, it behooves tSe staff to understand why there are differences in the population data and to correct any deficiencies l
before the emergency preparedness hearing.
l The population information in Table 1 does indicate that both the permanent ar.d seasonal resident population (at least out to 10 miles from the site) used by the rtaff in the alternative site study were conservative; i.e., high, in com-It is parison to the more current population data reported in Amendment 41.
also noted that the permanent resident population reported in the evacuation This study in Supplement No. 5 to the SER differs from that in Amendment 41.
appears to be because the data in the SSER were taken from a draft report which was subsequently revised in Amendment 41.
l l
$ %gg 75 810827 SHOTWEL81-283 PDR
l The following steps are recommended:
h 1.
A meeting between the Siting Analysis Branch and EPLB to adopt a unified M
course of action (such a meeting has been arranged by Tom McKenna EPLB).
ph Request the applicant to provide evacuation time estimates based on T
population projected over plant lifetime in addition to the 1980 estimates %ckw J
/ d in Amendment 41 (Tom McKenna has informally requested the applicant to do y to f
this; a formal request will be transmitted following the meeting with SAB).
t
?
Request the applicant to amend the population data in Chapter 2 of the wh PSAR to be consistent with the population data in Chapter 13.
(SAB)
MhM N
4.
Request the applicant to update the population data in the Pilgrim 2 docket a
based on 1980 Census data as soon as this information becomes available.
j
_ (SAB) 5.
Correct the evacuation study in Supplement No. 5 to the SER and, further, include evacuation time estimates based on projected population data when it becomes available from the applicant.
(EPLB) p OLM4 1
Falk Kantor Emergency Preparedness Licensing Branch Office of Inspection & Enforcement l
l l
1 i
I
s TABLE 1 POPULATION FIGURES FOR THE PILGRIM-2 SITE 0-10 MILE POPULATION,1980 SEASONAL PERMANENT (UNWEIGHTED)
SHORT TERM RESIDENTS RESIDENTS TRAliSIENTS 1.
FS FES Study 60,696 28,532 849,000 (Annual Total On Alt Sites 2.
Staff Testimony 60,696 32,527 B49,000 (Annual Total On Alt Sites (ERT DATA) 3.
Evacuation Study 54,248 24,002 44,329(PeakSummer[
In Amdt 41 4.
Evacu: tion Study 46,754 24,007 44,334(PoakSummer[
SER SUP NO. 5 Case 3 and 4 data are for an irregularly shaped _EPZ which includes some areas Note:
beyond 10 miles.