.> w /> 0 ~
[
a jt)t.10 EU Docket flo. 50-471 MEMORAffDUM FOR:
Frank J. Miraglia, Chief Licensing Branch flo. 3 Division of Licensing,?!RR FROM:
Frank G. Pagano," Chief Emergency Preparedness Licensing Branch Division of Emergency Preparedness Office of Inspection & Enforcement Pe u~+1 *
SUBJECT:
IhFrMi<, W: EVACOATI0ff TIf4E AND POPULATI0t! ESTIt:ATES RST YEAR OF OPERATI0ff Evacuation time and population estinates for the expected first year of operation of the Pilgrim II Station are required as part of our contfriufnp review.
Please transmit the enclosed request to the Pilgrim II applicant.
In addition, please arrange for a Siting Analysis Branch review of the population data provided by tha applicant in PSAR Amendment 41 and in response to this request.
Franiv agano, Chief i
l Emergency Preparedness Licensing Branch Division of Emergency Preparedness l
Office of Inspection & Enforcecent
Enclosure:
i As Stated 1
DISTRIBUTION:
Docket File 50-471 BGrimes SRamos I & E r/f EPLB r/f g
TMcKenna g
a.
FKantor FPagano U"
. Regan, Chief SAB
,f Welch 7
l Sg SSchwartz
(
' j/f og/
E5 EPLB EPLB E-SAB
{b TMcKenna/es FKantor gano W.
' an
~
)
7/ /81 7/ /81 7// o /81
/81
w 4
/
0 RAFT In addition to the 1980 evacuation time estimate provided in Amendment 41 to Chapter 13 of the PSAR, provide evacuation time estimates, which con-form with the guidance in Appendix 4 of NUREG-0654, for the peak popula-tion projected to the first year of plant operation (e.g.' 1990).
The basis for the population projection including tabulations of seasonal residents, peak transients as well as permanent residents should be de-
~
scribed'and should incorporate 1980 census and other current data. The population distribution data described in Chapter 2 of the PSAR shculd be revised, as appropriate, to reflect this updating.
The evacuation time estimates for the first year of plant operation should be based on the road network projected to exist the first year of plant cperation if supporting data is presented; otherwise, the current road network should be used.
I l
l l
l 7
I j
l l
I l