f ca)
.
.
.
.
.
.
.
JtJt.271981
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nos6-424/81Dnd 50-425/81-07
This refers to the routine audit conducted by Mr. R. W. Wright of this office on
June 22-26, 1981, of the quality assurance program for design, procurement, and
construction of the Vogtle facility as authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109.
Our preliminary findings were discussed with
Mr. H. H. Gregory, III, Assistant Project Construction Manager, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
The.3e items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for witnholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of thi
letter has been delayed such that less than seven days
are available for your review, please notify this office promptly du that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
tion must be accompanied by an affidavit executed by the owner of the information
-
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure. This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as f ar as
possible into a separate part of the affidavit.
If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
8109010215 810820
PDR ADOCK 05000424
0
F.
,.
.
,
.
'
- Ut 27 est
,
.
Georgia Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
,
them with you.
,
Sincerely,
R. C. Lewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosurn:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-424/81-07
and 50-425/81-07
cc w/ encl:
K. M. Gillespie, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. E. Dutton, Project General Manager
bec w/ enc 1:
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Docum at Management Branch
Sta- e of Georgia
.
.
.
RII
RIsI, /
RII'
RII
RII
R
!
mv)d
. I (/V
'
'
RWright:ht
8CUpright
h CMur hy
AFQibson
VBr wnl
R Lewis
, 7/22/81
7f/h/81
7/yY81
7/p81
7/g/81
7
31
\\
.
!
l
!
, . - . _ . - - - . . - _ . . - - _
. . . . . . -
. -
_
- . . . -
, - - - _ . - . ...