Responds to NRC Re Violations Noted in IE Insp Repts 50-424/81-07 & 50-425/81-07.Corrective Actions: Equipment Maint/Storage Program Is Being Revised to Be Less Complicated
ML20030D345
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/11/1981
From: Dutton D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20030D340 List:
References
GN-142, NUDOCS 8109010209
Download: ML20030D345 (3)


Text

f t WlJ I

Georgia F v er Company Post Office Box 4545 L

Atlanta, Georgia 30302 e Pmjut Telephone 404 522 6060 Southern ( ompany Services, Inc.

,.Is

[= h*O Post Offn e an 2625 Berrr.. T.am, Alabama 35202 Telephone 205 870-6011 August 11, 1981 United States Nuclear Regulatory Commission

Reference:

Cffice of Inspection and Enforcement ID:

II: RWW Regior II - Suite 3100 50-424/81-07 101 Marietta Street 50-425/81-07 Atlanta, Georgia 30303 Attention: Mr. R. C. Lewis File: X7BC10 Log:

GN-142 Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violations discussed in your inspection reports 50-424/

81-07 and 50-425/81-07.

We concur with the finding identified concerning maintenance / storage inspections. We agree that there is no documented evidence of this inspec-tion for the Unit 2 reactor vessel (tag #2 1201V6-001) for September, 1980.

The inspection frequency was changed to bi-monthly for the Unit 2 boric acid transfer pump (tag #2120PP6-006) in February,1979, therefore deleting the requirement for this inspection in March, 1979. The inspection was performed in April, meeting the new inspection requirement.

We feel that the system presently in use for notification and documen-tation of maintenance / storage inspections is too complicated and does not have sufficient checks. We are in the process of revising our equipment maintenance / storage program to help eliminate future problems. The new program will be a less complicated manual system.

We feel that the missing inspection documentation identified is iso-lated and does not indicate a program breakdown. The month's inspection (October,1980 for Unit 2 Reactor Vessel) following the month in question did not identify any problem areas with the equipment.

l We expect to have our new prooram operational by October 1, 1981.

We concur with the f uiding identified concerning food and drink con-sumption in the warehouse storage area. The reason for the finding was lack of training and improper posting.

l

" Designated eating areas" signs have been posted throughout the ware-house. Warehouse supervisory personnel will continue to monitor craftsmen's activities.

Contractors have been notified that all warehouse regulations 8109010209 810820 PDR ADOCK 05000424 G

ppy

r Mr. R. C. Lcwis 50-424/81-07, 50-425/81-07 August 11, 1981 page two will be enforced.

Craftsmen have been shown the designated eating areas and have been informed that they must comply with all Warehouse regulations.

' Gang Box" Safety Meetings will be used to continue to educate all craftsmen who are required to work in the warehouse regarding regulations concerning eating on or near plant equipment.

Full compliance was achieved on June 29, 1981.

Neither the inspection report nor this reply contains any proprietary information and may be placed in the NRC's Public Document

Room, r tr rs, w-} "

A fg n Doug Dutto Project General Manager CWH: sew Doug Dutu,n states that he is Project General Manager of Georgia Power Company's Vogtle Project and is authorized to execute this oath on behalf of Georgia Power Company and that to the best of his knowledge and belief the facts set forth in this letter are true.

GPC:

b ~

DhgDutton Sworn to and subscribed before me this _// aday of August, 1981.

Y-CCh Netsty Pub 5c. Georgte. C'. ate at Larste My Commission Espires March 21.1985 I

r-Mr. R. C. Lewis 50-424/81-07, 50-425/81-07 August 11, 1981 page three xc:

U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, 9. C.

20555 J. H. Miller, J..

R. J. Kelly R. E. Conway G. F. Head D. E. Dutton R. H. Pinson C. F. Whitmer D. L. McCrary R. A. Thomas J. A. Bailey

0. Batum D. O. Foster K. M. Gillespie E. D. Groover L. T. Gucwa B. L. Lex C. R. Miles, Jr.

H. C. Nix R. W. Staffa J. L. Vota 1