Text
.
AUG 1 i $81
.
Docket No. 50-293
g
Bosten Eduon Cor.pany M/C Nuclear
N
ATT;i: Mr. A. V. Morisi
-
,
D
"r ,, , 2 4 @ h @I
huclear Operations Support Ibnager
"
M W"** == ^
.
893 boylston Street
h.
""
( J ,
Boston, Hassachusetts 02199
b
Gentlenen:
4
p
-
Subject:
Inspection 50-293/81-13
This refers to the routine safety inspection conducted by Mr. J. Johnson of this
office on June 1-19, 29-30, 1931, at the Pilgrim huclear Power Station, Plynouth,
Massachusetts, of activities authorized by NRC License No. DPR-35 and to the
discussions of our findings held by Mr. Johnson with it. R. Nachon and other
members of your staff periodically during the inspection.
Areas exanined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews h1th personnel, and observations by thc
inspector.
Our inspector also verified the steps you have taken to correct the itens of
noncogliance brou9 t to your attention in the enclosures to our letters dated
h
l
July 8,1978 (Iten c.) and January 11, 1980. We have no further questions re-
garding your action at this tiae.
Based on the results of this inspection, it appears that certain of your activi-
ties were not conducted in full compliance with NRC requirements as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
These items of noncon-
pliance have been categorized into the levels described in the Federal Register
hotice (45 FR 66754) dated October 7,1930. You are required to respond to this
letter and in preparing your response, you should follow the instructions in
Appendix A.
In addition to the need for corrective action regarding these
specific items of noncocpliance, we are concerned about the i@lementation of
your management control systens that permitted them to occur. Consequently, in
your reply, you should describe in particular, those actions taken or planned to
inprove the effectiveness of your management control systems.
In accordance with 10 CFR 2.790 of the Cocriission's regulations, a copy of this
letter and the enclosures will be placed in the NRC's Public Docurent Room.
If
this report contains any information that you (or your contractors) believe to
8108250226 610811
i
PDR ADOCK 05000293
Q,p/
,
f(
ap
- 73
Jop K
k
RI:TIB
RI:bRPI
I
U:fl
r/7/n
Srfnner
,
i
eo
/cle
El
pr
Joyner
,-
_
AUG 11 1981
Boston Edison Company M/C Nuclear
2
be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)
notify this office by telephone within ten (10) days from the date of this
letter of your intention to ft:e a request for withholding; and (b) submit
within 25 days from the date of this letter a written application to this office
to withhold such information; Consistent with section 2.790(b)(1), any such
application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons on the ba' sis'which'it is claimed
that the information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
~
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room. The telephone notification
of your intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor, Files,
Mail and Records, USNRC Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
Eldo/ E J. D.c w e
is
n J. Brunner, Chief, Projects
Branch #1, Division of Resident
and Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Of fice of Inspection and Enforcement Inspection
Report Number 50-293/81-13
cc w/encls:
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Docunent Room (PDR)
!
'
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Comonwealth of Massachusetts (2)
bec w/encls:
Region I Docket Room (with concurrences)
NRC Resident Inspector
Chief, Operational Support Section (w/o encls)
!
-m
... .. . ......
...
... ..
....
..
..
.
.
.
.
.
.
.
.
-
- "'""' I ......... . .. .
. .... .... .
. ..... . ..
..
..
.
..
. ..
,,,
....,
,
j
DaTEk
..... .. . .....
.........
... .... . .. .. .
. .... .., .
. . , , , , , ,
. .. ,, ,
.
,,, ,
,,
OFFICIAL RECORD COPY
"'
P"* ' "" 'l * " {* {""C"
,
_