Text
.
A_Pjf.NDIXA NOTICE OF VIOLATION Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on June 1-19, 29-30, 1981, and in accord-ance with the Interin Enforcement Policy, 45 FR 66754 (October 7,1980), the following violations were identified:
A.
Technical Specification 6.8.A states that " Written procedures and admini-strative policies shall be established, implemented and maintained that j
meet or exceed the requirements and recouraendations of Section 5.1 and 5.c i
of ANSI N18.7-1972..." Section 5.1 of ANSI N18.7-1972 requires that written administrative policies shall be provided to control the issuance of docu-i ments, including changes, that prescribe activities affecting safety-related structures, systems, or components...".
Station Procedure No.1.5.3, " Maintenance Requests", Revision 13, requires that "... plant modifications shall be implemented with the requirements of the ' Approved for Implenentation' Plant Design Change Request (Procedure
- 1. 3.13 )".
Procedure No.1.3.13. " Plant Design Changes", Appendix B, states that "the nroper method of handling... field revisions is discussed in Procedure 1.3.27".
Procedure No.1.3.27, " Field Revision Notice", Revision
- 5.Section VI, states that "upon receipt of art approved FRN, the iglement-ing group may then implement the change in accordance with the previously approved PDCR Package."
Centrary to the above, between July 23, 1980 and July 24, 1980, an un-approved modification was implemented under Maintenance Request No.80-468 which resulted in cutting out check valves fros'two one-inch nitrogen supply lines and welding caps on the lines. The approved modificaticn (FRN 80-21-21, dated July 21,1980) specified the removal of these two check valves and the replacement of the appropriate piping sections to maintain system continuity and integrity.
l This is a Severity Level IV Violation (Supplement I).
B.
Technical Specification, Sections 3.8. A.4.b through 3.8. A.4.d. require that, during release of radioactive wastes, the following conditions shall be met: the gross activity monitor and recorder on the radwaste effluent line shall be operable; the effluent control monitor shall be set to alam and automatically close the waste discharge valve prior to exceeding the limits specified in 3.8. A.1 above; and the liquid waste activity and flow rate shall be continuously monitored and recorded during release.
i f"^"'>... 8108250229 elos11 PDR ADOCK 05000293 oan).....9...........,.........
P DR,......................................
OFFICIAL RECORD COPY I "R* '
\\
3
Appendix A 2
Contrary to the above, on June 9,1981, a radioactive liquid discharge of the Waste Neutralizing Sump was nede (licensee's permit ib. 81-07) to the discharge canal without passing through the radwaste discharge line and therefore without being continuously monitored and controlled by the gross activity monitor, recorder, automatic closing valves, and without the flow rate being continuously recorded.
This is a Severity Level V Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Boston Edison Company is here' required to submit to this office within thirty days of the date of this letice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full cogliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act l
of 1954, as amended, this response shall be submitted under oath or affirmation.
Where good cause is shown, consideration will be given to extending your response time.
The responses directed by the Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980 PL 96-511.
Dated l
Eldon J. Brunner, Chief, Projects Branch fl. Divison of Resident and Project Inspection t
l l
l 1
t l
i 1
b-+
DQTE h 5""'""~**""C" OFFICIAL RECORD COPY
,