Proposed Tech Specs,Reflecting Elimination of 10CFR50,App J, Type C Test Requirements for Lines Penetrating Containment Which Terminate Below Torus Water Level
ML20029C892
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/25/1994
From:
Public Service Enterprise Group
To:
Shared Package
ML20029C890 List:
References
NUDOCS 9405020292
Download: ML20029C892 (10)


Text

L 4

ATTACHMENT 2 LICENSE AMENDMENT APPLICATION ELIMINATION OF 10CFR50 APPENDIX J, TYPE C TEST j

REQUIREMENTS FOR LINES PENETRATING CONTAINMENT WHICH TERMINATE BELOW THE TORUS WATER LEVEL i

HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES 1

The following Technical Specification pages for-Facility Operating License No. NPF-57 are affected by this License Amendment Request:

Technical Specification Paces Table 3.6.3-1 3/4 6-20 3/4 6-21 3/4 6-29 3/4 6-30 3/4 6-31 3/4'6-35 3/4 6-36 3/4 6-42 Page 1 of 1 9405020292 940425 PDR ADOCK 05000354 p

-PDR

TABLE 3.6.3-1 (Continued)

Ei

??

PRIMARY CONTAINMENT ISOLATION VALVES' hk MAXIMUM PENETRATION ISOLATION TIME 92

. VALVE FUNCTION AMD NUMBER NUMBER (Seconds)

NOTE (S)

P&ID.

(c)' MSIV Sealing System Isolation Valves M-72-1 l

Outside:

Line A HV-5834A (KP-V010)

PIA 45 1

Line.B HV-5835A (KP-V009)

PIB 45 1

Line C HV-5836A (KP-V008)

PIC 45 l'

Line D HV-5837A (KP-V007).

PID 45 1

2.

Group 2 - Reactor Recirculation Water Sample System (a) Reactor Recirculation Water Sample Line Isolation Valves M-43-1 e,

3s Inside:

BB-SV-4310 P17 15 3

y,

/,

Outside:

BB-SV-4311 P17 15 3

O 3.

. Group 3 - Residual Heat Removal (RHR) System (a) RHR Suppression Pool Cooling Water & System Test

. Isolation Valves M-51-1 Outside:

Loop A: HV-F024A- (BC-V124).

P2128 180 11,4' HV-F010A (BC-V125)

P2128 180 l i s(

Outside:

Loop B:

HV-F024B (BC-V028)

P212A-180 11 sr HV-F0108- (BC-V027)

P212A 180 l i s(

(b) RHR to Suppression Chamber Spray Header Isolation Valves M-51-1 Outside:

Loop A:

HV-F027A (BC-V112)

P2148

'75 3

Loop B:

HV-F0278 - (BC-V015)

P214A' 75-3

~.

TABLE 3.6.3-1 (Continued) x jS PRIMARY CONTAINMENT ISOLATION VALVES MAXIMUM c)

EE PENETRATION ISOLATION TIME E

VALVE FUNCTION At4D NUMBER NUMBER (Seconds)

NOTE (S)

P&TD

.(c) RHR Shutdown Cooling Suction Isolation Valves M-51-1 Inside:

HV-F009 (BC-V071)

P3 45 3

Outside:

HV-F008 (BC-V164)

P3 45 3

(d) RHR Head Spray Isolation Valves M-51-1 Inside:

HV-F022 (BC-V021)

P10 60 3

Outside:

HV-F023 (BC-V020)

P10 60 3

(e) RHR Shutdown Cooling Return Isolation Valves M-51-1.

Outside:

Loop A: 'HV-F015A (BC-V110)

P4B 45 3

Loop B:

HV-F0158 (BC-V013)

P4A 45 3

[

4.

Group 4 - Core Spray' System Outside:

(a) Core Spray Test to Suppression Pool Isolation Valves M-52. Loop A:

HV-F015A (BE-V025)

P2178 80 11)(

Loop B:

HV-F015B (BE-V026)

P217A 80 J J j(

5.

Group 5 - High Pressure Coolant Infection (HPCI) System M-55-1 (a)' HPCI Turbine Steam Supply Isolation Valves Inside:

HV-F002 (FD-V001)

P7 NA 3

HV-F100 (FD-V051)

P7 NA 3

Outside: HV-F003 (FD-V002)

P7 NA 3

M-55 '

(b) -HPCI Pump Suction Isolation Valve

~0utside:

HV-F0421 (BJ-V009)

P202 NA j j jf

TABLE 3.6.3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES MAXIMUM PENETRATION ISOLATION TIME is VALVE FUNCTION-AND NUMBER NUMBER (Seconds)

NOTE (S)

P&IO 7n (b) DLD-RMS Return Isolation Valves M-25-1 e,

h!

Outside:

HV-4957 (SK-V008)

J5A 45 3

x HV-4981 (SK-V009)

J5A 45 3

B.

Remote Manual Isolatior Valves 1.

Group 21 - Feedwater System (a) Feedwater Isolation Valves M-41-1 Outside Check Valves HV-F0328 (AE-V001)

P2A NA 2

HV-F032A (AE-V005)

P2B NA 2

(b) Reactor Water Cleanup System Return Outside:

Ri HV-F039 (AE-V021)

P2A&B NA 2

M-44-1 l

2.

Group 22 - High Pressure Coolant Injection (HPCI) System

[g (a) Core Spray Discharge Valve Outside:

HV-F006 (BJ-V001)

P58 NA 3

M-55-1 (b) Turbine Exhaust Valve Outside:

HV-F071 -(FD-V006)

P201 NA 4

M-55-1 (c) HPCI Minimum Return Line Valve Outside:

HV-F012 (BJ-V016)

P203 NA-jl)(

M-55-l' (d) Feedwater Line Discharge Valve

'Outside:

HV-8278 (BJ-V059)-

P2B NA 2

M-55 3.

Group 23 - Reactor Core' Isolation Cooling (RCIC) System (a)' RCIC Turbine Exhaust Valve Outside:

HV-F059 '(FC-V005)

P207 NA 4

M-49-1

TABLE 3.6.3-1 (Continu:d)-

z k

PRIMARY CONTAINMENT ISOLATION VALVES k

MAXIMUM

~

p-PENETRATION ISOLATION TIME VALVE FUNCTION AND NUMBER NUMBER (Seconds)

NOTE (S)

P&ID Outside:

(b).RCIC Pump Suction Isolation Valve HV-F031 (BD-V003)

P208 NA lj f M-49-1 Outside:

(c) RCIC Minimum Return Line Isolation Valve SV-F019 P209 NA Il /

M-49-1 Outside:

(d) RCIC Vacuum Pump Discharge HV-F060 (FC-V011)

P210 NA 4

M-49-1 (e) Feedwater Line Discharge Valve Outside:

my HV-F013 (BD-V005)

P2A NA 2

M-49-1

[

4.

Group 25 - Core Spray System o

(a) Core Spray injection Valves M-52-1 Outside:

Loop A&C HV-F005A -(BE-V007)

PSB NA 3

' Loop B&D HV-F005B (BE-V003)

P5A NA 3

(b) Core Spray Suppression Pool Suction Valves M-52-1 Outside:

Loop A HV-F001A (BE-V017)

P216D NA Il g-

~ Loop B HV-F001B (BE-V019)

P216A NA II A oop C HV-F001C (BE-V018)

P216C NA 11 f Loop D HV-F001D (BE-V020)

P216B NA ij g (c) Core Spray Minimum Flow Valves M-52-1 Outside:

Loop A&C. HV-F031A (BE-V035)

P2178 NA

-1] g -

Loop B&D HV-F0318 (BE-V036)

P217A NA ll p (d) Core Spray Injection Line Bypass Valves M-52-1 Inside:

HV-F039A (BE-V071)

P5B NA 3

HV-F0398 (BE-V072)

PSA NA 3

4 1

TABLE 3.6.3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES E

MAXIMUM S

PENETRATION ISOLATION TIME VALVE FUNCTION AND NUMBER NUMBER (Seconds)

NOTE (S)

P&ID 5.

Group 26 - Residual Heat Removal System (a) Low Pressure Coolant Injection Valves M-51-1 Outside:

Loop A: HV-F017A (BC-V113)

P6C NA 3

Loop B: HV-F0178 (BC-V016)

P6B NA 3

Loop C: HV-F017C (BC-V101)

P6D NA 3

Loop D: HV-F0170 (BC-V004)

P6A NA 3

(b) RHR Containment Spray M-51-1 1

Outside:

toop A: HV-F021A (BC-V116)

P248 NA 3

w1 HV-F016A (BC-V115)

P24B NA 3

Loop B: HV-F0218 (BC-V019)

P24A NA 3

cn h

~

HV-F0168 (BC-V018)-

P24A NA 3

(c) RHR Suppression Pool Suction M-51-1 Outside:

Loop A: HV-F004A (BC-V103)

P211C NA Il/

Loop B: HV-F0048. (BC-V006)

P211B NA ll /

Loop C: HV-F004C (BC-V098)

P211D NA 1i f Loop D: HV-F004D (BC-V001)

P211A NA.

1l /

(d) RHR Minimum Flow Isolation Valves M-51-1 Outside:

Loop A:.HV-F007A (BC-V128)

P2128 NA Il /

Loop B: HV-F007B (BC-V031)

P212A NA ll /

Loop C: HV-F007C (BC-V131)

P2128 NA 11 /

Loop D: HV-F0070 (BC-V034)

P212A NA ll /

1

~

TABLE 3.6.3-1 (Continued)

PRIMARY CONTAINMENT ISOLATION VALVES m

O MAXIMUM A

PENETRATION ISOLATION TIME VALVE FUNCTION AND NUMBER NUMBER (Seconds)

NOTE (S)

'P&ID 5.

Group 35'- Breathing Air System M-15-1 Inside KG-V016 P31 NA 3

Outside KG-V034 P31

-NA 3

6.

Group 36 - TIP Purge System Inside:

Check Valve:

SE-V006 P34F NA 3

M-59 7.

Group 37 - HPCI System Outside:

.{

HPCI Turbine Exhaust:

FD-V004 P201 NA 4

M-55-1 i

8.

Group 38 - RCIC System Outside:

RCIC Turbine Exhaust:

FC-V003 P207 NA 4

M-49-1 Vacuum Pump Discharge:

FC-V010 P210 NA 4

M-49-1 1

9.

Group 39 - RHR System (a) Thermal. Relief Valves M-51-1 Outside:

3 Loop A:

BC-PSV-F025A P2128 NA 5

Loop B:

BC-PSV-F0258 P212A NA 5

l Loop C: BC-PSV-F025C P2128 NA 5

Loop D:

BC-PSV-F025D P212A NA 5

'(b): Jockey Pump Discharge Check Valves M-51-1 Outside:

Loops A & C:

(BC-V206)

P212B' NA ll/

I Loops B & D:

(BC-V260)

P212A.

NA ll g (c) RHR Heat Exchanger Thermal-Relief Valves M-51 'Outside:

BC-PSV-4431A P2138-NA 5

BC-PSV-44318 P213A NA-5

t' TABLE 3.6.3-1 (Continued) 5 PRIMARY CONTAINMENT ISOLATION VALVES MAXIMUM PENETRATION ISOLATION TIME

.O NUMBER (Seconds)

NOTE (5)

P&ID R

VALVE FUNCTION AND NUMBER n

(d) RHR Shutdown Cooling Suction Thermal Relief Valve M-51-l' Inside:

BC-PSV-4425 P3 NA 3

M-51-1 (e) LPCI Injection Line Check Valves Inside:

HV-F041A -(BC-V114)

P6C-NA 3

HV-F041B

~(BC-V017)

P6B NA 3

HV-F041C (BC-V102)

P60 NA 3

HV-F041D (BC-V005)

P6A NA 3

(f) Shutdown Cooling Return Line Check Valves M-51,

Inside:

HV-F050A (BC-V111)

P48 NA 3'

w-1 HV-F050B

.(BC-V014)

P4A NA 3

M-51-1

?

(g) RHR Suppression Pool Return Valves M

Outside:

HV-F011A (BC-V126)

P2128.

NA 11 /

HV-F0118.(BC-V026)

P212A NA l1 A

10. Group 40 - Core Spray System (a) Thermal Relief Valves M-52-1 Outside:

Loop A&C:

BE-PSV-F012A P217B NA 5

. Loop B&D:

BE-PSV-F0128 P217A NA 5

(b) Core Spray Injection Line Check Valves Inside:

M-52-1 HV-F006A (BE-V006)

PSB NA 3

HV-F006B.

(BE-V002)

PSA NA 3

M-42-1

11. Group 41_ - Drywell Pressure Instrumentation Outside:

BB-V563 J6A NA 6

BB-V564 J8D NA 6

BB-V565 J7A NA 6

BB-V566 J10D NA 6

=-

TABLE 3.6.3-1 PRIMARY CONTAINMENT ISOLATION VALVES NOTES NOTATION 1.

Main Steam Isolation Valves are sealed with a seal system that maintains a positive pressure of 5 psig above reactor pressure.

Leakagg.,is in-leakage and is not added to 0.60 La allowable leakage.*

2.

Containment Isolation Valves are sealed with a water seal from the HPCI and/or RCIC system to form the long-term seal boundary of the feedwater lines.

The valves are tested with water at 1.10 Pa, 52.9 psig, to ensure the seal boundary will prevent by pass leakage.

Seal boundary liquid leakage will be limited to 10 gpm.

3.

Containment Isolation Valve, Type C gas test at Pa, 48.1 psig.

Leakage added to 0.60La allowable leakage.

4.

ContainmentIsolationValve,TypeCwatertestat1.10Pa,52.9psigaP.l Leakage added to 10 gpm allowable leakage.

5.

Containment boundary is discharge nozzle of relief valve, leakage tested during Type A test.*

6.

Drywell and suppression chamber pressure and level instrument root valves and excess flow check valves, leakage tested during Type A.*

7.

Explosive shear valves (SE-V021 through SE-V025) not Type C tested.*

8.

Surveillances to be performed per Specification 3.6.1.8.

9.

All valve I.D. numbers are preceded by a numeral I which represents an Unit 1 valve.

10. The reactor vessel head seal leak detection line (penetration J5C) excess flow check valve (BB-XV-3649) is not subject to OPERABILITY H

testing.

This valve will not be exposed to primary system pressure except under the unlikely conditions of a seal failure where it could be partially pressurized to reactor pressure.

Any leakage path is restricted at the source; therefore, this valve need not be j

OPERABILITY tested.

i

,m/y -.

i 1.

See ath:Aed ioert.

i

%A A-

HOPE CREEK 3/4 6-42 Amendment No. 32

a INSERT T.S.

PAGE 3/4 6-42 11.

Containment Isolation Valve (s) are not Type C tested.

Containment by-pass leakage is_ prevented since the line terminates below the minimum water level in the suppression chamber and the system is a closed system outside Primary Containment.

Refer to Specification 4.0.5.

i

'l