05000368/LER-1982-043, Forwards LER 82-043/03L-0

From kanterella
(Redirected from ML20028C803)
Jump to navigation Jump to search
Forwards LER 82-043/03L-0
ML20028C803
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/04/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20028C804 List:
References
2CAN018302, 2CAN18302, NUDOCS 8301140149
Download: ML20028C803 (2)


LER-1982-043, Forwards LER 82-043/03L-0
Event date:
Report date:
3681982043R00 - NRC Website

text

p r'

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4000

_ January 4, 1983 h

ll>,

l JAN l 01983

'dCAN018302 Ll M.

Mr. W. C. Seidle, Chief.

Reactor Project Branch #E U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 82-043/03L-0 Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.b, attached is the subject report concerning the receiving of a Power Operating Limit (POL) alarm during performance of the Reactivity Coefficients at Power test procedure.

Very truly yours, John R. Marshall Manager, Licensing JRM:CHT: s1 N

.f W Attachment cc:

Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555.

0301140149 830104 PDR ADOCK 05000360 S

PDR MEMDER MOOLE SOUTH UTsuTuES SYSTEM

A*

Form 301 F 1 Revised 2-15-79 Regulatory Report Review Plant:

f//d2ftSCL5 V L[64tf

  1. ff.

Unit:

Report Title:

E ICf XSCE-b\\/ N NeAdfb Report Number: yo -3C, f)

RA-ok3 /sJ1 o

Report Type:

Routine:

() Non-Routine: M Special:

() Reportable Occurrence:

14 day ( ) 30 day p(,

Prepared By:

A f'f'ICIC-

  1. MS Date:

/2 3Q v

Reviewed By:

1-O b ~ E '!

O

/1 2

A Date:

General Manager or Cognizant Manager / Supervisor (Signature, reference or NA)

Reviewed By:

Aj Date:

/W M

Cognizant Licensing Reviewer ' sg Peviewed and j[

Approved By:

o

. //

Date:

/

87 M-ag5r, Licensing

//

Review Required:

PSC YES ( ).

NO SRC YES () NO

. Reviewed By:

k

[

Date:

Plant Safety Committee f

(Signature or reference)

Reviewed By:

Date:

Safety Review Committec