05000313/LER-1982-005, Forwards Corrected LER 82-005/03L-0

From kanterella
Jump to navigation Jump to search
Forwards Corrected LER 82-005/03L-0
ML20050B252
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/23/1982
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20050B253 List:
References
1CAN038209, 1CAN38209, NUDOCS 8204050145
Download: ML20050B252 (1)


LER-1982-005, Forwards Corrected LER 82-005/03L-0
Event date:
Report date:
3131982005R00 - NRC Website

text

._.

L ARKANSAS POWER & tJGHT COMPANY POST OrFCE box 551 UTTLE ROCK. ARKANSAS 72203 (50113716 March 23, 1982

- @bh/

ICANO38209

,j, j i

U. S. Nuclear Regulatory Commission

' } W29@

Il

'?

Mr. W. C. Seidle, Chief i

ReactorProjectBranch#2 l:

Region IV L

J 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Subject: Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. OPR-51 Licensee Event Report No. 82-005/03L-0 (Fi1e: 0520)

Gentlemen:

In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.2(b),attachedisthesubjectreportconcerningafailureof Emergency Diesel Generator (EDG) No. 2 during a monthly surveillance test.

This is a resubmittal to correct'a typing error in the body of the LER.and should be used to supercede the submittal dated March 19, 1982.

ry ruly ours,._AD I

l hn R. Marshall Manager, Licensing JRM:GAC:s1

,[.,[1]px g

Attachment i,

.. i ; ~. : ED 1982* 7p~\\ij cc:

Mr. Richard C. DeYoung p'

OfficeofInspectionandEnforcemen)U. S. Nuclear Regulatory Comm

"** l 'i

=> : ' "'-[" ' d //

r "' '7

'.A>h, Washington, D. C.

20555

?

/ ',

Hr. Norman M. Haller, Director

.^ g... '.' /

- v Office of Management & Program Analysis - J e ' <.'.

U. S. Nuclear Regulatory Commission Washington, D. C.

20555

{

Y[f l l[l 8204050145 B20323 j

PDR ADDCK 05000313 S

PDR MEMDEA MOOLE SOUTH UTsuTiES BYSTEM