FACILITY OPERATING LICENSE NO.
DPR-73 00CKET NO.
50-320 Replace the following pages of Appendix "A" Proposed Technical Specifications with the enclosed pages as indicated.
The revised pages contain vertical lines indicating the area of change.
Pages i
3.9-1 3.9-2 (added) i l
f I
l 8210260552 820924 PDR ADDCK 05000320 PDR P
[
c-
--n-,-.,,
' ~ ' '*Tw y-
LIMITING CONDITIONS FOR OPERATION 3.9 RADIOACTIVE WASTE STORAGE FUEL HANDLING BUILDING / AUXILIARY BUILDING AIR CLEANUP SYSTEMS 3.9.12.1 The Fuel Handling Building Air Cleanup Exhaust System shall be OPERABLE with exhaust ventilation flow through the HEPA filters during system operation.
The Fuel Handling Building Air Cleanup Exhaust System is OPERABLE when two of the four system air cleanup exhaust fans are OPERABLE.
APPLICABILITY:
At all times.
ACTION:
a.
With the Fuel Handling Building Air Cleanup Exhaust System inoperable due to flow requirements, return the flow to within acceptable limits within four (4) hours or; b.
With the Fuel Handling Building Air Cleanup Exhaust System inoperable (other than as allowed in paragraph 3.9.12.1 a above), suspend all opera-tions involving movement of liquid and gaseous radioactive wastes in the Fuel Handling Building (other than sampling evolutions required by the Technical Specifications or Recovery Operations Plans) until the system is restored to OPERABLE status.
3.9.12.2 The Auxiliary Building Air Cleanup Exhaust System shall be OPERABLE with exhaust ventilation flow through the HEPA filters during system operation.
The Auxiliary Building Air Cleanup Exhaust System is OPERABLE when two of the four system air cleanup exhaust fans are OPERABLE.
APPLICABILITY:
At all times.
ACTION:
a.
With the Auxiliary Building Air Cleanup Exhaust System inoperable due to flow requirements, return the flow to within acceptable limits within four (4) hours or; b.
With the Auxiliary Building Air Cleanup Exhaust System inoperable (other than as allowed in paragraph 3.9.12.2 a above), suspend all operations involving movement of liquid and gaseous radioactive wastes in the Auxiliary Building (other than sampling evolutions required by the Technical Specifications or Recovery Operations Plan) until the system is restored to OPERABLE status.
THREE MILE ISLAND - UNIT 2 3.9-1 September 24, 1982
LIMITING CONDITIONS FOR OPERATION EPICOR II PROCESSED WATER 3.9.13 Discharge of water processed by the EPICOR II system shall be pro-hibited until approved by the NRC.
Water processed by the EPICOR II system shall be discharged in accordance with procedures approved pursuant to Specification 6.8.2.
APPLICABILITY:
At all times.
ACTION:
None except as provided in Specification 3.0.3.
REACTOR BUILDING SUMP WATER 3.9.14 Processing and discharge of water in the Reactor Building sump and Reactor Coolant System shall be prohibited until approved by the NRC.
Water in the Reactor Building samp and Reactor Coolant System shall be processed and discharged in accordance with procedures approved pursuant to Specification
6.8.2. APPLICABILITY
At all times.
ACTION:
None except as provided in Specification 3.0.3.
THREE MIL'E ISLAND - UNIT 2 3.9-2 September 24, 1982