MONTHYEARML20217B1791999-10-0404 October 1999 Revised TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation, Reflecting Agreements Reached in 990909 & 16 Discussions ML20209B8161999-06-30030 June 1999 Proposed Tech Specs Chapters 3.4,3.5,3.6,3.7,4.0 & 5.0, Converting to ITS ML20196J8731999-06-30030 June 1999 Proposed Tech Specs Correcting Errors,Per 990222 TS Amend Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation ML20207D6421999-05-31031 May 1999 Proposed Conversion to ITSs for Chapter 3.3 ML20206H0001999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI on Conversion to ITS ML20206F4421999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI Re Conversion to Its,Chapter 3.8 ML20206B4721999-04-21021 April 1999 Corrected Proposed TS Pages 5.5-6,5.5-7,5.5-8 & 5.5-9, Replacing Current W Model 51 SGs with W Model 54F ML20205G8571999-04-0202 April 1999 Proposed Ts,Increasing Dei Limit from 0.15 to Uci/Gram IAW 10CFR50.90 ML20205A2401999-03-19019 March 1999 Proposed Tech Specs Table 3.3-6,re Cr,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation ML20207C2451999-02-22022 February 1999 Proposed TS Amends to Clarify SR Refs to ANSI N510 Sections 10,12 & 13 to ASME N510-1989,with Errata Dtd Jan 1991 & to Add Footnote Which Refs FNP FSAR for Relevant Testing of Details ML20203A7711999-02-0303 February 1999 Proposed Tech Specs Pages Re Conversion to Its,Chapter 3.4 ML20196B6241998-11-20020 November 1998 Proposed Tech Specs Pages Re Conversion to Improved TS, Chapters 3.6.& 5.0 ML20155J4561998-11-0606 November 1998 Proposed Tech Specs Re Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2521998-10-12012 October 1998 Proposed Tech Specs Section 6,providing Recognition of Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20237D4111998-08-20020 August 1998 Proposed Tech Specs Reflecting Conversion to Improved TS Re Discussion of Changes & Significant Hazards Evaluations ML20217N4801998-05-0101 May 1998 Proposed Tech Specs Bases Pages Re Safety Limits,Reactivity Control Systems & Afs ML20217Q7261998-03-20020 March 1998 Proposed Tech Specs Re Power Update Implementation,Replacing Page 6-19a ML20202G1311998-02-12012 February 1998 Proposed Tech Specs Re Pressure Temp Limits Rept ML20202F1121998-02-12012 February 1998 Revised Proposed Changes to TS Page 6-19a for Power Uprate ML20198H3661998-01-0707 January 1998 Proposed Tech Specs Pages,Adding Note to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisfied ML20198E6621997-12-31031 December 1997 Proposed Tech Specs Changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value ML20198E3141997-12-30030 December 1997 Proposed Tech Specs Re Auxiliary Bldg & Svc Water Bldg Battery Surveillances ML20197B6691997-12-18018 December 1997 Proposed Tech Specs Pages Re 970723 TS Amend Request Associated W/Pressure Temperature Limits Rept ML20211P5861997-10-16016 October 1997 Proposed Tech Specs Pages,Revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211J1501997-09-30030 September 1997 Proposed Tech Specs,Correcting Page 20 of 970723 TS Amend Request to Relocate RCS Pressure & Temperature Limits from TS to Pressure & Temperature Limit Rept ML20217C0341997-09-25025 September 1997 Revised Proposed Ts,Providing Addl Info Re 970630 Submittal, Titled, Jfnp TS Change Request - Credit for B for Spent Fuel Storage ML20211A6891997-09-17017 September 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20216D0031997-09-0303 September 1997 Proposed Tech Specs Re Moveable Incore Detector Sys ML20149K1001997-07-23023 July 1997 Proposed Tech Specs,Relocating RCS P/T Limits from TS to Proposed P/T Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Sys Limits ML20148R7521997-06-30030 June 1997 Proposed Tech Specs,Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20148Q1041997-06-30030 June 1997 Proposed Tech Specs,Revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys,Required Number of Radiation Monitoring Instrumentation Channels & Deleting Containment Purge Exhaust Filter Spec ML20148K7501997-06-13013 June 1997 Proposed Tech Specs Changing TS 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3931997-05-28028 May 1997 Proposed Tech Specs,Clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5921997-05-27027 May 1997 Proposed Tech Specs Pages Revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Charging Pump Suction Valves ML20148F2381997-05-27027 May 1997 Corrected TS Bases Page B 3/4 1-3 That Incorporates Changes from COLR & Elimination of Containment Spary Additive Sys TS Amends ML20138B9251997-04-23023 April 1997 Proposed Tech Specs,Revising TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6091997-03-25025 March 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20136F8231997-03-0707 March 1997 Proposed Tech Specs 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6731997-02-24024 February 1997 Proposed Tech Specs Re Surveillance Requirements of Control Room,Penetration Room & Containment Purge Filtration Systems ML20135C4941997-02-24024 February 1997 Proposed Tech Specs Re SG Tube Laser Welded Sleeves.Voltage Based Alternate Repair Criteria Is Approved Prior to Laser Welded Sleeve Amend ML20135C8641997-02-14014 February 1997 Proposed Tech Specs Revising Specified Max Power Level & Definition of Rated Thermal Power ML20134J4051997-02-0606 February 1997 Proposed Tech Specs,Providing Addl Info Re voltage-based Repair Criteria for SG Tubing ML20133G5801997-01-10010 January 1997 Proposed Tech Specs Re Generic Laser Weld Sleeving & Deleting One Cycle Implementation of L* Which Expired at Last Unit 2 Outage ML20138G9581996-12-26026 December 1996 Proposed Tech Specs Reflecting Guidance Contained in GL 95-05, SG Tube Support Plate Voltage-Based Repair Criteria, Using Revised Accident Leakage Limit of 20 Gpm & Using Probability of Detection That Is Voltage Dependent ML20134N9211996-11-18018 November 1996 Proposed Tech Specs Bases B 3/4 2-5 Re RCS Total Flow Rate Surveillance ML20134K5551996-11-15015 November 1996 Proposed Tech Specs 3.6.2.2 Re Spray Additive Sys ML20134G9601996-11-11011 November 1996 Proposed Tech Specs Amending License NPF-8 to Replace Farley Specific Laser Welded Sleeve Requirements Currently in TS W/Generic Laser Welded Sleeve Process ML20149L8991996-11-0606 November 1996 Revised Technical Specification Pages for Plant Units 1 & 2 ML20128M4821996-10-0808 October 1996 Proposed Tech Specs Reflecting Deletion of Cycle Specific L* Repair Criteria Which Expires at Start of Next Unit 2 Refueling Outage ML20128F8821996-09-30030 September 1996 Proposed Tech Specs Change Request Relocating cycle-specific Core Operating Parameter Limits to Colr.Proposed Changes Based on Guidance Found in NRC GL 88-16,WOG-90-016, NUREG-1431 & COLR Approved by NRC 1999-06-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217B1791999-10-0404 October 1999 Revised TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation, Reflecting Agreements Reached in 990909 & 16 Discussions ML20209B8161999-06-30030 June 1999 Proposed Tech Specs Chapters 3.4,3.5,3.6,3.7,4.0 & 5.0, Converting to ITS ML20196J8731999-06-30030 June 1999 Proposed Tech Specs Correcting Errors,Per 990222 TS Amend Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation ML20207D6421999-05-31031 May 1999 Proposed Conversion to ITSs for Chapter 3.3 ML20206H0001999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI on Conversion to ITS ML20206F4421999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI Re Conversion to Its,Chapter 3.8 ML20206B4721999-04-21021 April 1999 Corrected Proposed TS Pages 5.5-6,5.5-7,5.5-8 & 5.5-9, Replacing Current W Model 51 SGs with W Model 54F L-99-170, Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with1999-04-20020 April 1999 Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with ML20205S9641999-04-20020 April 1999 Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with ML20205G8571999-04-0202 April 1999 Proposed Ts,Increasing Dei Limit from 0.15 to Uci/Gram IAW 10CFR50.90 ML20205A2401999-03-19019 March 1999 Proposed Tech Specs Table 3.3-6,re Cr,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation ML20205A3101999-02-28028 February 1999 Analysis of Capsule Z from Alabama Power Co Jm Farley Unit 2 Reactor Vessel Radiation Surveillance Program ML20207C2451999-02-22022 February 1999 Proposed TS Amends to Clarify SR Refs to ANSI N510 Sections 10,12 & 13 to ASME N510-1989,with Errata Dtd Jan 1991 & to Add Footnote Which Refs FNP FSAR for Relevant Testing of Details ML20203A7711999-02-0303 February 1999 Proposed Tech Specs Pages Re Conversion to Its,Chapter 3.4 ML20205T0011998-12-23023 December 1998 Rev 17 to FNP-0-M-011, Odcm ML20205T0081998-12-23023 December 1998 Rev 18 to FNP-0-M-011, Odcm ML20196B6241998-11-20020 November 1998 Proposed Tech Specs Pages Re Conversion to Improved TS, Chapters 3.6.& 5.0 ML20155J4561998-11-0606 November 1998 Proposed Tech Specs Re Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2521998-10-12012 October 1998 Proposed Tech Specs Section 6,providing Recognition of Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20151V6991998-09-11011 September 1998 Snoc Jm Farley Nuclear Plant Startup Test Rept Unit 2 Cycle 13. with ML20237D4111998-08-20020 August 1998 Proposed Tech Specs Reflecting Conversion to Improved TS Re Discussion of Changes & Significant Hazards Evaluations ML20217N4801998-05-0101 May 1998 Proposed Tech Specs Bases Pages Re Safety Limits,Reactivity Control Systems & Afs ML20205S9971998-04-19019 April 1998 Rev 16 to FNP-0-M-011, Odcm ML20217Q7261998-03-20020 March 1998 Proposed Tech Specs Re Power Update Implementation,Replacing Page 6-19a ML20202G1311998-02-12012 February 1998 Proposed Tech Specs Re Pressure Temp Limits Rept ML20202F1121998-02-12012 February 1998 Revised Proposed Changes to TS Page 6-19a for Power Uprate ML20198H3661998-01-0707 January 1998 Proposed Tech Specs Pages,Adding Note to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisfied ML20198E6621997-12-31031 December 1997 Proposed Tech Specs Changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value ML20198E3141997-12-30030 December 1997 Proposed Tech Specs Re Auxiliary Bldg & Svc Water Bldg Battery Surveillances ML20197B6691997-12-18018 December 1997 Proposed Tech Specs Pages Re 970723 TS Amend Request Associated W/Pressure Temperature Limits Rept ML20212B1791997-10-31031 October 1997 1 SG ARC Analyses in Support of Full Cycle Operation ML20211P5861997-10-16016 October 1997 Proposed Tech Specs Pages,Revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211J1501997-09-30030 September 1997 Proposed Tech Specs,Correcting Page 20 of 970723 TS Amend Request to Relocate RCS Pressure & Temperature Limits from TS to Pressure & Temperature Limit Rept ML20217C0341997-09-25025 September 1997 Revised Proposed Ts,Providing Addl Info Re 970630 Submittal, Titled, Jfnp TS Change Request - Credit for B for Spent Fuel Storage ML20211A6891997-09-17017 September 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20216D0031997-09-0303 September 1997 Proposed Tech Specs Re Moveable Incore Detector Sys ML20149K1001997-07-23023 July 1997 Proposed Tech Specs,Relocating RCS P/T Limits from TS to Proposed P/T Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Sys Limits ML20148Q1041997-06-30030 June 1997 Proposed Tech Specs,Revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys,Required Number of Radiation Monitoring Instrumentation Channels & Deleting Containment Purge Exhaust Filter Spec ML20148R7521997-06-30030 June 1997 Proposed Tech Specs,Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20148K7501997-06-13013 June 1997 Proposed Tech Specs Changing TS 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3931997-05-28028 May 1997 Proposed Tech Specs,Clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148F2381997-05-27027 May 1997 Corrected TS Bases Page B 3/4 1-3 That Incorporates Changes from COLR & Elimination of Containment Spary Additive Sys TS Amends ML20148E5921997-05-27027 May 1997 Proposed Tech Specs Pages Revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Charging Pump Suction Valves ML20138B9251997-04-23023 April 1997 Proposed Tech Specs,Revising TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20198T4921997-03-31031 March 1997 Small Bobbin Probe (0.640) Qualification Test Rept ML20137H6091997-03-25025 March 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20136F8231997-03-0707 March 1997 Proposed Tech Specs 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C4941997-02-24024 February 1997 Proposed Tech Specs Re SG Tube Laser Welded Sleeves.Voltage Based Alternate Repair Criteria Is Approved Prior to Laser Welded Sleeve Amend ML20135C6731997-02-24024 February 1997 Proposed Tech Specs Re Surveillance Requirements of Control Room,Penetration Room & Containment Purge Filtration Systems ML20135C8641997-02-14014 February 1997 Proposed Tech Specs Revising Specified Max Power Level & Definition of Rated Thermal Power 1999-06-30
[Table view] |
Text
REACTOR COOLANT SYSTEM OPERATIONAL LEAKAGE LIMITIN5 CONDITION FOR OPERATION I
3.4.7.2 Reactor Coolant System leakage shall b'e limited to:
- a. No PRESSURE BOUNDARY LEAKAGE, I
- b. 1 GPM UNIDENTIFIED LEAKAGE,
- c. 1 GPM total primary-to-secondary leakage through all steam generators and 500 gallons per day through any one steam generator,
- d. 10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System, and
- e. 31 GPM CONTROLLED LEAKAGE at a Reactor Coolant System pressure of 2235 + 20 psig.
- f. As specified in Table 3.4-1 at a Reactor Coolant System pressure of 2235 + 20 psig, a maximum allowable leakage of 3 gpm for any Reactor Coolant System Isolation Valve of nominal diameter of 2 inches and of 5 gpm (with certain limitations) for any Reactor Coolant System Isolation Valve of nominal diameter greater than 2 inches.
APPLICABILITY: MODES 1; 2, 3 and 4 ACTION:
- a. With any PRESSURE B0UNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- b. With any Reactor Coolant System leakage greater than any one of the
. above limits, excluding PRESSURE B0UNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. -
- c. With any Reactor Coolant System Pressure Isolation Valve leakage h greater that the above limit, isolate the high pressure portion of the affected system from the low pressure portion within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 69
- use of at least two closed manual or deactiviated autom3 tic valves, or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD "
SH0TDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS .
-=
4.4.7.2.1 Reactot, Coolant System leakages shall be demonstrated to be within ,
each of the above limits by; e
- a. Monitoring the containment atmosphere particulate radioactivity monitor at least once per 12' hours. ,
.b. ' Monitoring the containment air gooler condensate level system or containmerit atmosphere gasegus radioactivity monitor at least' once 9
per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. ^ 3
^
'lNIT ? #
3/4 4-17
$ 8210150344 821011 m ,
I PDR ADOCK 05000364 a . , ',
P PDR ,a - e
TABLE 3.4-1 REACTOR COOLANT SYSTEM PRESSURE ~ ISOLATION VALVES MAX. (#) MAX. (#)
ALLOWABLE ALLOWABLE LEAKAGE LEAKAGE TPNS DESCRIPTION (GPM) TPNS DESCRIPTION (GPM)
Q2E11V001A 12" Gate 5 Q2E21V062A 2" Check 3 Q2E11V001B 12" Gate 5 Q2E21V062B 2d Check 3 Q2E11V016A 12" Gate 5 Q2E21V062C 2" Check 3 Q2E11V016B 12" Gate 5 Q2E21V066A 2" Check 3 Q2E11V021A 6" Check 5 Q2E21V066B 2" Check 3 Q2E11V021B 6" Check 5 Q2E21V066C 2" Check 3 Q2E11V021C 6" Check 5 Q2E21V076A* 6" Check 5 Q 2E11V042A 10" Check 5 Q2E21V076B* 6" Check 5 Q2E11V042B 10" Check 5 Q2E21V077A* 6" Check 5 Q2E11V051A 6" Check 5 Q2E21V077B* 6" Check 5 Q2E11V0516 6" Check 5 Q2E21V077C 6' Check 5 Q2E11V051C 6" cneck 5 Q2E21V078A 2" Check 3 Q2E21V032A* 12" Check 5 Q2E21V0788 2" Check 3 Q2E21V032B* 12" Check 5 Q2E21V078C 2" Check 3 Q2E21V032C* 12" Check 5 Q2E21V079A 2" Check 3 Q2E21V037A* 12" Check 5 Q2E21V079B 2" Check 3 Q2E21V037B* 12" Check 5 Q2E21V079C 2" Check 3 Q2E21V037C* 12" Check 5 ,
(#) A. The limitations for maximum allowable leakage of Reactor Coolant System Isolat' ion Valves with a nominal ?iameter greater than two inches is as follows:
- 1. Leakage rates less than or equal to 1.0 gpm are considered acceptable. However, for intial tests, or test (following valve repair or replacement, leakage rates less than or< equal to 5.0 gpm are considered acceptable.
- 2. Leakage rates greater than 1.0 gpm but less' than or equal,to 5.0 gpm are considered acceptable if the latest measured rate has not exceeded the rate determined by the previous test by an amount *that reduces the margin between measured leakage rate and the maximum permissible rate of35.0 gpm by 50% or greater.
- 3. Leakage rates greater than 1.0 gpm but less than or equal to 5.0 gpm are considered unacceptable if the latest measured rate ~
exceeded the rate determined by the previous test by an amount that redu'ces the margin between measured leakage rate and the maximum permissible rate of 5.0 gpm by 50% or greater.
- 4. Leakage rates greater than 5.0 gpm, are considered unacceptable.
B. The maximum allowable leakage of Reactor Coolant System Isolation '
Valves with a nominal diameter of two inches is.3 gpm.
+.
FARLEY - UNIT 2 3/4 4-19 O m 3 b
~." ~
REACTOR COOLANT SYSTEM . . _. _
l OPERATIONAL LEAKAGE . . _
LIMITING CONDITION FOR OPERATION 3.4,.7.2 Reactor Coolant System leakage shall be limited to: .
j
.a. No PRESSURE BOUNDARY LEAKAGE,
- b. 1 GPM UNIDENTIFIED LEAKAGE, .
- c. 1 GPM total primary-to-secondary leakage through all steam generators and 500 gallons per day through any one steam generator,
- d. 10 GPM IDENTIFIED LEAXAGE from the Reactor Coolant System, and
- e. 31 GPM CONTROLLED LEAKAGE at a Reactor Coolant System pressure of 2235 2 20 psig.
. f. 4/G2 eak af ma R cto Co an Sy a repfure so ti
/ Val spe fie in abl 3. 1 a ea or oolfnt st p sjde o 2235 20 si .
( g p s (, w 2,;T M 3 +-I< a h W4m APPLICABILITY: MODES 1, 2, 3 and 4 hm ehi4k u.ss120 gay m n. w ps eysm.Lluha sl dWod a-3'tf^
' Anesku.5
%<r % M<~tig,,gs w n m m[
Ac330n. M winnswuu Mya}mL LJa.
- a. With any PRESSURE SOUNDARY LEAKAGE, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />'.
- b. With any Reactor Coolant System leakage greater than any one of the above limits, excluding PRESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- c. With any Reactor Coolant System Pressure Isolation Valve leakage greater that the above limit, isolate the high pres'sure portion of
~,
the affected system from the icw pressure portion within,4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by
> - use of at least two closed manual or deactivated automat'ic valves, or Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD "
SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.-
~
SURVEILLANCE REOUIREMENTS ._
4.4.7.2.1 Reactor Coolant System leakages shall be demonstrated to be within 1
, each of the above limits by; *
-. 1
( a. Monitoring the containment atmosphere particulate radioactivity ,
monitor at Teast once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
~ ~
~
. h. Monitoring the containment air cooler condensate level system or- -
containment atmosphere gaseous radioactivity monitor at least once . '
per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. .
FARLEY-UNIT 2 .
3/4 4-17 Amen en N .13
4..':
N i
t REACTOR COOLANT SYSTEM I
a ABLE 4-1 R CTO COO NT EM RESSU IS TI VALVES -
E11VO 6A 2E11V 01A is TOb ""3 * #'F'*0
.lll1 V$!#
" d' *
-fo rcf-kcf d V .Q 11VO 1A Mcf *cas ouMbo AAnw .' 2fff051 alA%rlob kQe. Q2E1 V021 Q2E IV021
- Q211V02 C E11VO 2A /
2E11V 42 Q2E2 07 A*
- Q2E VD 7B*
- Q2 IV 76A*
- Q 21 768
- 2.
Q2F IV06 A ,
+
- Q2 21VO 2B e
- Q E21V 2C 2E21V 66A 2E21 066B
-Q2E2 V066 "o
-Q2E V07
-Q2 IV07 A
- Q2 21VO 88 -
- Q E21 78C 2E21 79 2E2 079 Q2E2 V07 C Q2 IVO 2A* '
Q 21V 328* . " .
e h
g 3 1 %#
f ,
FARLEY-UNIT 2 V44-19
+ , .
O * '
Attachment 2 Safety Evaluation For One-Time Change of Unit 2 Technical Specification 3/4.4.7.2
. I. Back gr ound Technical Specification 3/4.4.7.2 currently specifies the performance of leak tests on all reactor coolant system pressure isolation valves. The acceptance criteria of 1 gpm contained in the Unit 2 Technical Specification has proven to be too restrictive and has resulted in unacceptable delays in the return to power.
Alabama Power Company requests a one-time change of Technical Specification 3/4.4.7.2 to modify the acceptance criteria to 3 gpm for reactor coolant isolation valves with a nominal diameter of two inches and 1 to 5 gpm (with certain limitations) for reactor coolant isolation valves with a nominal diameter greater than two inches.
II.
References:
P (1) FNP Unit 1 Technical Specification 3/4.3.7.3 (2) FNP Unit 2 Technical Specificaticn 3/4.4.7.2 III. Buses It is imperative that the acceptance criteria for reactor coolant system isolation valve leakage be established prior to shutdown in
. order that this critical path not be impacted. The initial valve testing is performed on the critical path of the unit outage in -
order to identify valves requiring subsequent repair during' the outage. Af ter valve repair and re-installation, the valves tare then retested for leakage as a part of the critical path of the return to power. If the results of leak retest do.not satisfy the stringent 1-gpm acceptance criteria of the current technial i specification, the critical path of the cutage may be further impacted due to valve rework, re-installation, retest, and the draindown of reactor coolant system required to repair several of these valves. The difference in acceptance criteria from 1 gpm to 3 or' 5 spm requires a variance in leakage configuration that is negligible; inconsequential, and beyond#that which can be 'affected by reasonable maintenance activities.
As an example, the disk of a six-inch check valve would be elevated l from its seat by approximately 0.00004 in. to produce a qleak rate of 1 gpm and by approximately 0.00020 in, to produce a Teak rate of 5 gpm. To correct small irregularities that produce leak rates
~
between 1 g'pm an~d 3 or 5 gpm, several maintenance and retesting a iterati6ns may be necessary. ~ This activity subjects plant
. personnel to greater radiation exposures, potentially requires draining the . reactor coolant system to retest the reworked valve and extends the time before the unit is returned to power.
1 9
O 4 3.- - .-. a _ --.._.~1---.___N
e
. . ., -l ' ,
Attachment 2 Page 2 The Unit I leak test acceptance criteria of 1 to 5 gpm, (under certain limitations) have been proven to be adequate in establishing the pressure retaining capability of the valves. As shown by testing experience at Farley Nuclear Plant-Unit 1, valves that did not satisfy either the acceptar.ce criteria of 1 gpm or 1 to 5 gpm were found to contain the same minor valve seating irregularities causing the valves not to seat completely under low test pressures, and no evidence of impending valve failere has been found using either acceptance criteria.
For valves with a nominal diameter of two inches, the acceptance criteria of 3 gpm is requested based on review of past leak rate data for two-inch valves. This data showed that such valves did not produce leak rates greater than 3 gpm. The 3-gpm acceptance criteria was selected for smaller valves since repair is easier, actual leakage rates are not significant, and the ability to meet and maintain lower leakage rates is facilitated. Additionally, the acceptance criteria of 3 gpm is below the 5 gpm criteria that has been proven to establish the pressure retaining capability of the valves.
This proposed.one-time change to Unit 2 Technical Specification 3/4.4.7.2 provides for a high assurance of reactor coolant system integrity through surveillance and testing requirements without unwarranted compromise to the health and safety of the public and needless jeopardizing of the timely return of the_ unit to power ~
operation.
IV. Concl usion This proposed change to the Unit 2 Technical Specifbcation-
' represents an improvement in testing required for the reactor coolant system pressure isolation valves and does not involve an unreviewed safety question as defined by 10 CFR 50.59.