ML20027C353

From kanterella
Jump to navigation Jump to search
Application for one-time Change to Tech Spec 3/4.4.7.2, Modifying Leak Test Acceptance Criteria.Change Necessary to Preclude Potential for Delay in Return to Power from Refueling Outage
Date released: 02/10/2020 Download: ML20027C353


Proposed Tech Spec Pages 3/4 4-17 & 3/4 4-19 Re RCS Operational Leakage & RCS Pressure Isolation Valves.Safety Evaluation Encl
ML20027C356
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/11/1982
From:
ALABAMA POWER CO.
To:
References
Download: ML20027C356 (6)
Application for one-time Change to Tech Spec 3/4.4.7.2, Modifying Leak Test Acceptance Criteria.Change Necessary to Preclude Potential for Delay in Return to Power from Refueling Outage
ML20027C352
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/11/1982
From: Clayton F
ALABAMA POWER CO.
To: VARGA S A
Office of Nuclear Reactor Regulation
References
Download: ML20027C352 (5)