ML20027B217

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/82-21 & 50-401/82-21 on 820520-0620 & Notice of Violation
ML20027B217
Person / Time
Site: Harris  
Issue date: 07/07/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20027B197 List:
References
NUDOCS 8209160541
Download: ML20027B217 (2)


See also: IR 05000400/1982021

Text

hf?,0

'

$

-

-

.,

.,

JUL 0 71982

y.

.

Carolina Power and Light Company

ATTN: Mr. J. A. Jones, Senior Executive

3

-

Vice President and Chief

,x

Operating Officer

'l

411 Fayetteville Street

i

Raleigh, NC 27602

h

Gentlemen:

Subject:

Report Nos k A00/8 k and 50-401/8h-21

'

This refers to the routine safety inspection conducted by Mr. G. F. Maxwell of

this office on May 20 - June 20, 1982, of' activities' authorized by NRC

Construction Permit Nos. CPPR-158 and CPPR-159 for the Spearon Harris facility.

Our preliminary findings were discussed with Mr. R. M. Parsons, Project General

Manager, at the conclusion of the inspection.

1

p

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within tnese areas, the 'nspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the_ inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will oe examined during subsequent inspections.

s

,

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placeddin the NRC's Public Document Room unless you notify this office, by

telephor.e, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

,

x

of this' letter.

Such application must be consistent with the requirements of

2.790(b)(1).

,

,

The responsesidf rected by tilis letter and the enclosures are not subject to the

1

clearance procidures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

'

,

8209160541 820903

,

DR ADOCK 05000400

PDR

c

s

.

.

-

.,

.,

Carolina Power & Light Company

2

JUL 0 71982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

fS

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

I:ispection Report Nos. 50-400/82-21

and 50-401/82-21

cc w/ encl:

R. M. Parsons, Project General Manager

bcc w/ encl:

NRC Resident Inspector

T. E. Conlon

W. P. Kleinsorge

Document Management Branch

State of North Carolina

!

l

l

RII{fgc

RLI;,['f

RI

RII

dhif,awell:drtbyp%Ilardin

CBurger

FLong

j

41

v~

i

-

,

6

/82

6/J3/82

y/[g/82

p / /82

/

./

'

i,

-