Text
_
4 "ed i
" ?,
3 o
6.7 REPORTING RMUIREMEITIS
>o co O$;j In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations 7:u following identified reports shall be submitte6 to the Director of the appropriate Regional Office
, the of Inspection and Enforcement unless otherwise noted.
i ow Do A.
Routine Reports J PJ -
i 1.
Startup Report A sumary report of plant startup and power escaistion testing shall be submitted following (1) receipt of an operating license, (2) amencment to the license involving a planned increase h,
in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuci supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance cf the plant. The report shall address each of the tests identified in the FSAR and shall in general include a description of the measured values of the operating conditions or characteristics abtained during the test program and a comparison of these values with design predictions and specifications.
Any corrective actions that were required to obtain satisfactory operation shall also be described.
additional specific details required in license conditions based on other ccanitments shall Any be included in this report.
Startup reports shall be submitted-within (1) 90 days following completion of the startup or (3) 9 months following initial criticality, whichever is earliest. test program, (2) 90 If the Startup Report does not cover all three events (i.e.
inftial criticality, completion of startup test program, and resumption or comencemen,t of commercial power operation), supplesmentary reports shall be submitted at least every three months until all three events have been completed.
211 REV g- ?%g.;e
- w
. m-w.x-mwu
-w..
[
.. g
,' y 2.
Occupational Exposure Report.~1/An annual report of occupational exposure covering the l
previous.. calendar year shall,be submitted prior to March 1 of each year.
i The report should tabulate on an annual basis the number of atation, utility and other personnel (including contractors)' receiving exposures greater than 100 mrem /yr and their associated man-rem exposure _ according to work and job functions,. e.g., reactor operations and surveillance, inservice inspection, routine maintenance, special maintenance (describe maintenance), waste processing, and refueling. The dose assignment to various duty functions may be estimates based on pocket dosimeter, TLD, or film badge measuranents.
Small exposures totalling less than 207. of the individual total dose need not be accounted i
for. In the aggregate, at least 807. of the' total whole body dose received from external sources shall be assigned to specific major work functions.
3.
Monthly Operating Report. A monthly report of operating statistics and shutdown experience l
covering the previous month shall be submitted by the 15th of the following month to the.
Office of Management Information and Program Control, U S Nuclear Regulatory Conunission, Washington, D,C.
20555 B.
Reportable Occurrences Reportabic occurrences, including corrective actions and measures to prevent recurrence, shall be reported to the NRC. Supplemental reporte may be required to fully describe final resolution of occurrence. In case of corrected or supplemental reports, a licensee event report shall be completed and reference shall be made to the original report date.
1/ This report supplements the requirements of 10CFR20, Section 20.407. If 10CFR20, Section 20.407 is revised to include such information, this Specification is unnecessary.
l 212 Next page is 214 REV
.1
,, DISTRIBUTION AFTER ISSUANC FOPERATINGLICENSh
^
. m c cu u fs'.
w.s. ~uCuaAn nsCv'Arcav ecumn g6ccaTNuwesa
' ts let
\\
/ Q.2Q
- NRC DISTRIBUTION aoM PART 50 DOCKET NATERIAL 70:
FRCM:
OA TE CP CCC:.iME N T Northern States Power Company 10/31/77 Hr. Victor Stello Minnesota, Minneapolis
- ^78 #8C'y),f 77 j
L. O. Mayer 1
CLETTg2 CNCTCMt22D PACP INPUT PORM NUMSSR CP CCPIES MECEIVSC CCG14 ANAL C yNCt,Agg4 pig g Cccer 3$g6atp tCESCZIPTICN ENCLC3Umg i
1.
License No. DPR-22 Appl for Amends tech specs proposed change concerning deletion of the requirement of an Annual Operating Report....
j notorized 10/31/77......
s t
4y PLANT NMIE: Monticello RJL 11/4/77 (2-P)
(1-P)+(4-P)
M [N(.
1 SATETv
. FOR AC9CN/INFCRMATlON i ! BRA?CH cmu.F: (7)
I dW/ 3 l
l
! 1 l
l
! l
}
l
! i l I i
t I I
i i
t i i
i i p i
fV INTERNAL OIST RIBUTICN j
i JPREGE I I i s'
I i I
,'-..r.v FDR I i 1
4 1 i !
t i I C E (2) i i i l i
I i
t ICELD I I i i 8
t i
l i EANAUER l l l l I l l
? 6 CHECK I
f I i i i t
i IM i i l 1 i i s EISENHUT I i l i
! I I
SHA0 t
i I i l 1 1
I~
BAER l i j i i l l
BUTLER I
I I I I GRIXES I
l 1 l
.I J. GOLLL'iS i
1 l
~
1 l J.
Mc Geocq
! I i 1 I
i l i
i i I
I I I
I i i
i i i 1 i t
(
l I i i I i
i j
4 l l i
l i l i I j
m i
EXTERNAL OISTRIBUTICN
/ (f0NT*401. NUM BE R I
6 LPDRt/f/1/JAn'4Aih0 k*fN I I l
/
I TIC 1
I I
/< /
Nsic l
! I s
77 t
16 CYS ACRS SENT CATELORvJ
. I
/
0024
~
Ii
/
4 i s i
i #
- -