05000316/LER-1983-058-03, /03L-0:on 830628,personnel Discovered 31-day Visual Verification of Blind Flange Over Fuel Transfer Tube CPN-1 Deleted.Caused by Mistake in 750407 Rev.Flange Visually Verified & Change Sheet Written

From kanterella
(Redirected from ML20024D513)
Jump to navigation Jump to search
/03L-0:on 830628,personnel Discovered 31-day Visual Verification of Blind Flange Over Fuel Transfer Tube CPN-1 Deleted.Caused by Mistake in 750407 Rev.Flange Visually Verified & Change Sheet Written
ML20024D513
Person / Time
Site: Cook 
Issue date: 07/28/1983
From: Stephens T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20024D508 List:
References
LER-83-058-03L-01, LER-83-58-3L-1, NUDOCS 8308050155
Download: ML20024D513 (2)


LER-1983-058, /03L-0:on 830628,personnel Discovered 31-day Visual Verification of Blind Flange Over Fuel Transfer Tube CPN-1 Deleted.Caused by Mistake in 750407 Rev.Flange Visually Verified & Change Sheet Written
Event date:
Report date:
3161983058R03 - NRC Website

text

PIRC (DRM J66 U. S. NUCLE AR REGULATORY COMMISSION (7 77).'

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

IO lil lM ll 10 IC l C l 11@l0 10 l-101010 l 0 l 0 l -l 010l@l4 l1 l1 l1111@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NuM8EH 26 26 LICENSE TYPE

.10 57 CAT $8 CON'T 10111 3s"c l L l@l0 15 10 10 10 1311 16 l@l0 16 12 18 18 13 l@l 017121 81 813 l@

1 8

60 63 DOCK ET NUMBER 68 69 EVENT DATE 74 7S REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES bio IO l2I IDURING REVIEW 0F THE CONTAINMENT PENETRATION SURVEILLANCE PROCEDURE IT WAS i o i 3, iDISCOVERED THAT THE 31 DAY VISUAL VERIFICATION OF THE BLIND FLANGE OVER THE FUEL l

io i4i ITRANSFER TUBE, CPN-1, HAD BEEN DELETED FROM ALL REVISIONS F0LLOWING THE ORIGINAL. I IO lsi lTHIS IS NON-CONSERVATIVE WITH RESPECT TO T.S. 4.6.1.la.

THE HEALTH AND SAFETY I

io is i 10F THE PUBLIC WERE NOT AFFECTED.

PREVIOUS OCCURRENCES WERE 315/75-048 AND 315/81-0fl9.

1017 I I i

10181I l

DE CODE S SC E COMPONENT CODE SUB ODE S

E l S l Di@ lD_j@ [Z j@ lP lE l N l E I T l RI@ [B_j@ lZj @

O 9

/

8 9

10 11 12 13 18 19 20 LE R EVf.NT YEAR RE ORT O DE Y

N O,aeg'RO 18 l3 l

[--J lo Is 18 l l/l I 013 l lLl l--J [0_j u

_,21 22 23 24 26 27 28 29 30 31 32 T K N ACT ON ON PL NT ME HOURS SS IT FOR B.

SUPPLI R MAN FACTURER (G_j@lZ l@

[_Z_j@

LZ_j@

101010l0l [Y_j@

IN l@

[Lj@

lX1919l9l@

JJ 34 JS 36 37 40 43 42 43 44 47 CAUSE OESCRIPTION AND CORRECTIVE ACTIONS O27 lFURTHER INVESTIGATION REVEALED THE 31 DAY VISUAL VERIFICATION OF CPN-1 HAD BEEN

, o i,;,il DELETED IN A REV. WHICH WAS ISSUED 4/7/75. THE BLIND FLANGE USED FOR CONTAINMENT i

i,,,i l INTEGRITY AT CPN-1 HAS BEEN LEAK CHECKED AT THE CONCLUSION OF THE OUTAGES IN WHICH I gi IT WAS USED DURING THE PERIOD THE VISUAL VEP,IFICATION WAS NOT DONE. THE FLANGE WASI m iVISUALLY VERIFIED IN PLACE & A CHANGE SHEET WRITTEN TO INCLUDE CPN-1 IN THE PROCFDllRE.

075 siSEOURv' ST seOweR OTHER STATUS oiSCOv ERv oESCRiPTiON [E j@ l0 l 9 l 0 l@l NA l

lBl@l PROCEDURE REVIEW l

i 3

' JnviTY CO'# TENT RELEASED OF RELEASE AMOUNTOF ACTIVITY LOCATION OF RELEASE l

li 161 LZ_j @ [Z_J@l NA l

l NA l

PERSONNEL EXPOS ES oESCRiPTiON @

NuM8ER TvPE fiTTI I o 10 I Ol@[Z_j@l NA l

l i

' PERSONNe't NauZES oESCRi,TiO~@

~uMRER l 010l Ol@l NA l

l i x

[

7 8 9 11 12 80 TvPE DESCR PT ON [Z_j@l NA l

i 9 7

8 9 10 80 ISSujE @oESCRIPTiON LN l

NA I

11 I l l l i l l i l i l; 2 o li 3 10 68 69 80 e T. R. STEPHENS M10 m ani

{

NAME OF PREPARER PsoNE:

8308050155 830728 PDR ADOCK 05000316 S

PDR

SUPPLEMENT TO LER 83-058/03Lc0 27)

FURTHER INVESTIGATION REVEALED THE 31 DAY VISUAL VFRIFICATION OF CPN-1 HAD BEEN DELETED FROM A REVISION ISSUED 4/7/75. THE BLIND FLANGE USED FOR CONTAINMENT INTEGRITY AT CPN-1 HAS BEEN LEAK CHECKED AT THE CONCLUSION OF THE OUTAGES IN WHICH IT WAS USED DURING THE PERIOD THE VISUAL VERIFICATION WAS NOT DONE. THE REASON FOR REMOVING THE VISUAL VERIFICATION OF THE BLIND FLANGE COULD NOT BE DETERMINED. THE FLANGE IS LOCATED INSIDE CONTAINMENT AT THE BOTTOM OF THE FUEL TRANSFER CANAL.

THE FLANGE WAS VISUALLY VERIFIED IN PLACE ON THE SAME DAY THE OMISSION WAS DISCOVERED. VERIFICATION OF THE CPN IN UNIT 2 WAS NOT REQUIRED IN AS MUCH AS BLIND FLANGES INSIDE CONTAINMENT ARE EXEMPTED FROM THE 31 DAY VISUAL VERIFICATION BY THE UNIT 2 TECHNICAL SPECIFICATION.

THE VISUAL VERIFICATION FOR THE BLIND FLANGE, IN UNIT 1, HAS BEEN ADDED VIA A CHANGE SHEET TO THE CONTAINMENT PENETRATION SURVEILLANCE PROCEDURE WHICH WILL SATISFY THE 31 i

DAY VISUAL VERIFICIATION REQUIREMENT IN THE FUTURE.

e I