05000316/LER-1992-001, :on 920122,refueling Water Storage Tank Boron Concentration Greater That Spec Limit Due to Incomplete Mixing.Operations Dept Procedures Scheduled to Be Revised Before Third Quarter
| ML17329A389 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 02/21/1992 |
| From: | Blind A, Sampson J INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| LER-92-001, LER-92-1, NUDOCS 9202260058 | |
| Download: ML17329A389 (10) | |
| Event date: | |
|---|---|
| Report date: | |
| 3161992001R00 - NRC Website | |
text
ACCELERATED DI UTION DEMONSTRATION SYSTEM S'f I
i REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) f ACCESSION NBR:9202260058 DOC.DATE: 92/02/21 NOTARIZED: NO DOCKET FACIL:50.-316 Donald-C.
Cook Nuclear'ower Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFF)ILIATION SAMPSON,J.R.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana,& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION a
'SUBJECT:
LER 92-001-00:on 920122,unit 2 refueling water storage tank boron concentration greater than specification limit due to incomplete mixing.Operations Dept procedures are scheduled to be revised befor third quater.W/920221 ltr.
DISTRIBUTION CODE:
ZE22T COPIES RECEIVED:LTR J ENCL 2 SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), incident Rpt, etc.
NOTES'.
RECIPIENT ID CODE/NAME
,PD3-1 LA STANGiJ INTERNAL: ACNW AEOD/DSP/TPAB NRR/DET/EMEB 7E NRR/DLPQ/LPEBlo NRR/DREP/PRPB11 NRR/DST/SICB8H3 NRR/DST/SRXB 8E RES/DSIR/EIB EXTERNAL EG&G BRYCE g J
COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 2
2 1
1 1
1 1
1 3
3 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DOA AEOD/ROAB/DSP NRR/DLPQ/LHFB10 NRR/DOEA/OEAB NRR/DST/SELB 8D NRR/DST/S B8Dl pREG~ZGP RGNS--I. TGE 01 L ST LOBBY WARD NSIC MURPHY,G.A NUDOCS FULL TXT COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
.1 1
1 1
1 1
1 1
.1 1
1, NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
FULL TEXT CONVERSION REQUIRED TOTAL,NUMBER OF COPIES REQUIRED:
LTTR 30
.ENCL 30 to-<
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 February 21, 1992 INQMItIA NICHIGAM POVfKR United States Nuclear Regulatory Commission Document Control Desk Rockville, Maryland 20852 Operating Licenses DPR-74 Docket No. 50-316 Document Control Manager:
In accordance with the criteria established by 10 CFR 50.59 entitled Licensee Event Re ort S stem the following report is being submitted:
92-001-00 Sincerely, k~
A. A. Blind Plant Manager
/sb Attachment co D. H. Williams, Jr.
A.
B. Davis, Region III E.
E. Fitzpatrick P.
A. Barrett B. F. Henderson R.
F. Kroeger B. Walters Ft.
Wayne NRC Resident Inspector T. Colburn - NRC J.
G. Keppler M. R. Padgett G. Charnoff, Esq.
D. Hahn INPO S. J.
Brewer/B.
P.
Lauzau B.. A. Svensson 9202260058 920221 PDR ADOCK 050003i6 5
/gk(64)9)
US, NUCLEAR REGULATORYCOMMISSION LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION APPROVED OMB NO. 31500104 EXPIRES: 4/30/92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENTBRANCH IP4)30). U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, OC 20555, ANDTO THE PAPERWORK REDUCTION PROJECT (3(504)104)/ OFFICE OF MANAGEMENTANO BUDGET, WASHINGTON, DC 20503.
FACILI'TYNAME (1)
DOCKET NUMBER (2)
LER NUMBER (6)
YEAR
)1+5 SEQUENTIAL )ay REVISION
)
NUMBER
'S>5 NUMBER PAGE (3)
D.
C.
Cook Plant Unit 2 TEXTlllmo/4 4OEco /4/EEEI)od, o44 odd/Oooo/NRC F/Nm 36649/ (17) 0 5
0 0
0 3
9 2
0 0
1 0 0
0 8
Conditions Prior.To Occurrence Unit one in mode one at 100X power.
Unit two in mode one at 100X power.
Descri tion of Event On 1-22-92 at 0630, the sample results of the unit 2 refueling water storage tank (RWST) (EIIS/BP-TK) drawn at 0620 identified that the boron concentration in the tank was 2,628 ppm.
With unit 2 in mode one, Technical Specification (TS) 3.1.2.8 (Borated Water Sources
- - Operating) and TS 3.5.5 (Refueling Water Storage Tank) require the RWST boron concentration to be between 2,400 and 2,600 ppm of boron.
With the boron sample of the RWST greater than the high specification limit, the Unit Supervisor (US) declared the RWST inoperable and entered the TS action statement associated with TS 3.1.2.8 and 3.5.5.
The TS action statement required that the RWST be restored to operable within one hour, or the unit to be in at least hot standby within six hours and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Additional samples were requested of the unit 2 RWST boron concentration.
A sample taken at 0658 determined a boron concentration of 2,644 ppm, a sample taken at 0728 determined a boron concentration of 2,641
- ppm, and a sample taken at 0729 determined a boron concentration of 2,624 ppm.
At 0743, the unit 2 primary water storage tank (PWST)
(EIIS/WD-TK), which has a boron concentration of (10 ppm, was aligned to blend to the unit 2 RWST.
By 0815, approximately 4,000 gallons of water were blended from the PWST to the RWST.
At 0822, confirmatory boron samples of the unit 2 RWST measured the boron concentration to be between 2,624 and 2,644 ppm of boron.
Following this initial attempt to reduce the tank boron concentration and with the boron concentration remaining greater than the specification, a shutdown of unit 2 was commenced from 100X power and an unusual event was declared.
At 0940, the unit 2 shutdown was terminated based on the receipt of a preliminary verbal agreement that a waiver of compliance would be considered.
At 1043, an additional 8,000 gallons of PWST water were added to the unit 2 RWST followed by recirculation via the containment spray (CTS) pump (EIIS/BE-P) and samples of the RWST.
NRC FcNNI 3Fb4 IY)4(9)
NAC FORM366A (689)
U.S. NUCLEAR AEGULATORYCOMMISSION LICENSEE EVENT REPORT ILERI TEXT CONTINUATION APPROVEO OMB NO. 3'1500104 EXPIRES; 4130)92 ESTIMATFO BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS. FORWARD COMMENTS REQAADINGBURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENTBRANCH <PB30), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555. ANDTO THE PAPERWORK REDUCTION PROJECT (31500104), OFFICE OF MANAGEMENTAND BUDGET,WASHINGTON,DC 20503.
FACILITYNAME (11 DOCKET NUMBER 12)
LEA NUMBER (6)
PAGE (3)
YEAR rioNI SEQUENTIAL NUM864 mm 4LYISION NUMSS4 D.
C.
Cook Nuclear Plant Unit 2 TEXT BYmoro olmeo lo rorrufrod, oro oddrrr)rool rrRC Form 36543l ()7) 0 5
0 0
0 3
9 2
0 0
1 OF 0
8 Descri tion of Event (Continued)
At 1200, the unusual event was terminated on the receipt of.the temporary waiver of compliance provided that the following conditions were met:
The Plant must set bounds on the unit 2 RWST boron concentration.
high boron concentration was set at 2,700 ppm and the low boron concentration was set at 2,400 ppm.
With the CTS pump aligned to recirculate the unit 2 RWST, no work was to be performed on the other train of CTS.
Procedures should be in place to return the CTS pump aligned to recirculate the RWST to service during accident conditions.
The waiver of compliance would be granted for up to six days, or until the unit 2 RWST boron concentration is returned to within the specifications, and no further mixing is required.
Any anomalies in Plant conditions associated with the RWST boron would be promptly communicated to the NRC (Nuclear Regulatory Commission)
Resident Inspector.
The Plant responded immediately to the elevated boron concentration by a process of dilution, recirculation, and increased sampling.
The dilutions were based on independently verified bounding calculations to ensure that the limits for low boron concentration were not violated.
In addition, actions were taken to add the dilution volume in steps to permit recirculation of the RWST during dilution.
By 1046 on 1-22-92, a sufficient amount of water (approximately 12,000 gallons) had been blended from the PWST and recirculation had been started, utilizing the west CTS pump, to ensure that the RWST boron concentration was within the TS limits.
By 1200, initial samples taken at the west CTS pump discharge indicated a boron concentration of approximately 2,560 ppm in the RWST.
Following the dilution, recirculation, and confirmatory samples of the unit 2 RWST, the boron concentration leveled off at approximately 2,530 ppm.
Approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> later on 1-23-92, after the recirculation of the RWST was stopped, measurements of the RWST boron concentration leveled off at approximately 2,505 ppm.(64)9)
US. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT ILER)
TEXT CONTINUATION APPROVED OMB NO. 31500104 EXPIRES: 4/30/92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 500 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATETO THE RECORDS AND REPORTS MANAGEMENTBRANCH (P4)30), U.S. NUCLEAR REGULATORY COMMISSION. WASHINGTON, DC 20555, ANDTO THE PAPERWORK REDUCTION PROJECT (3)500104). OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON,DC 20503.
FACILITYNAME (1)
DOCKET NUMBER (2)
LER NUMBER (6)
IIAGE (3)
VEAA SEQUENTIAL NUMBER REVISION NUMBER D
C.
Cook Nuclear Plant Unit 2 TEXT IIImore secre Is reerr)red, rrse edde'ensl IVRC Form 3664'sl (17) 0 5
0 0
0 3
9 2
0 0
1 0 004 oF0 8
Descri tion of Event (Continued)
The following are the circumstances leading to the great:er-than-specification unit 2 RWST boron concentration on 1-22-92 at 0630:
On about 12-17-91, the unit 2 RWST boron concentration was identified to management as a parameter outside self-imposed administrative limits.
The self-imposed administrative limits were 2,450 to 2,550 ppm (TS limits are 2,400 to 2,600 ppm).
The boron concentration in the RWST was at 2,577 ppm.
On 1-3-92, the Operations and Chemistry Departments presented a plan of action for returning the unit 2 RWST to within the administrative guidelines.
This plan included a decision not to adjust the boron concentration during power operations and was approved by Plant management.
On 1-11-92, in accordance with normal operation procedures, the unit 2 RWST level was raised from 91.5X to 95.5X level.
A blend of borated water was used to ensure minimal impact on boron concentration.
This activity was accomplished to provide adequate volume in the unit 2 PWST to allow for storage and use of processed radioactive waste water.
At the conclusion of this water addition to the RWST, the tank was sampled and the sample results of the RWST boron concentration was within the TS limit at 2,587 ppm.
A check calculation made prior to commencing this activity indicated that the boron concentration would not exceed the TS limit.
On 1-20-92, a routine sample of the RWST for boron concentration identified the concentration at 2,607 ppm, which was above the TS limit of 2,600 ppm.
As a result of this sample, the unit 2 RWST was declared inoperable at 1245 and confirmatory samples were ordered.
By 1338, double confirmatory samples had been drawn to verify the boron concentration was in specification; the sample results were 2,589 and 2,595 ppm of boron.
In response to the unexpected elevated concentration, the Operations Superintendent directed that 2,000 gallons of primary water
(<10 ppm boron) be added to the unit 2
RWST and the tank recirculated.
To ensure adequate'ixing, the recirculation of the tank was started at 0429 via t:he CTS pump on 1-21-92 and completed at 0545 on 1-22-92.
At 0620 on 1-22-92, a sample was drawn and analyzed with the results reported to the unit 2 control room at 0630, which led to the above stat:ed sequence of events.
NRC FOAM366A (64(9)
U.S. NUCLEAR REGULATORYCOMMISSION LICENSEE EVENT REPORT ILER)
TEXT CONTINUATION APPROVED OMB NO. 31500104 EXPIRES: 4/30/92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUESTI 50.0 HRS. FOAWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPOATS MANAGEMENTBRANCH (P-530), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO IHE PAPERWORK REDUC'TION PROJECT (31504)(04). OFFICE OF MANAGEMENTAND BUDGET, WASH(NGTON, DC 20503.
FACILITYNAME (1)
DOCKET NUMBER (2)
YEAR LER NUMBER (6)
SEOUENZIAL NUMBER REVISION NUMBER PAGE (3)
D.
C.
Cook Nuclear Plant Unit 2 TEXT/llmore epece /4 ror)o/red, rrre eddlo'one/ HRC Forrrr 366AB/ ()7) 0 5
0 0
0 3
]
6 9
0 0
1 0
0 0
5 QF 0
Cause of Event
On 1-22-92, an Engineering evaluation was completed as part of the waiver of compliance request to TS 3.1.2.8 and 3.5.5.
As part of this preliminary
- review, an Engineer reviewed the unit 2 RWST,
- PWST, and middle boric acid storage tank (BAST) (EIIS/CB-TK) level changes and the initial boron concentrations of the tanks during the 1-11-92 blend to the Unit 2 RWST.
An upper bound was calculated for the maximum boron concentration, indicating it could have been as high as 2,611 ppm.
To reach this concentration, a blend
- - concentration of about 3,600 ppm would have been needed.
A sample taken during the blending indicated a boron concentration of 2,650 ppm.
The blend concentration was reduced following that sample result.
Considering this calculation, the Plant believes that the sample results on 1-20-92 of 2,607
- ppm, 2,589
- ppm, and 2,595 ppm were reasonable.
On 1-22-92, following the preliminary Engineering evaluation, the Plant believed that the 2,644 ppm boron concentration in the unit 2 RWST was most likely contributed to by the introduction of boric acid plated out on the RWST wall above the initial water level, and/or stratification cause by the increased level and/or temperature changes caused by subsequent recirculation.
Following the initial Engineering evaluation performed as part of the waiver of compliance request, further Engineering review concludes that the increased boron concentration in the unit 2 RWST was not significantly affected by plating out of boron on the RWST walls, but rather caused by the combined effects of, incomplete mixing in the RWST, less than precise blender control, and inadequate administrative control of RWST boron concentration.
Therefore, it is believed that the combination of these effects led to the unit 2 RWST boron concentration exceeding the TS limit during the blend to the tank on 1-11-92.
This conclusion is based on the following:
A calculation made prior to delivering the 12,000 gallons of PWST water to the RWST and mixing estimated that the resulting boron concentration would be higher than what 'was measured.
It was in this context in which the Plant referred to the "stratification" of boron in the RWST during the tele-conference on 1-22-92.
Following further review, the Plant could not identify any mechanism present in the RWST that would cause the separation of water into separate volumes of unequal boron concentration.
A review of the RWST boron concentration following the unit 2 Refueling Outage identified that the RWST boron concentration was approximately at, or just below, the u'pper administrative limit of 2,550 ppm.(64) 9)
U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT ILER)
TEXT CONTINUATION APPROVED OMB NO. 3)504)IP4 EXPIRES: 4(30(92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 508) HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENTBRANCH (F430), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO THE PAPERWORK REDUCTION PROJECT (3(504)104), OFFICE OF MANAGEMENTANDBUDGET;WASHINGTON,DC 20'503.
FACILITYNAME (1)
DOCKET NUMBER (2)
LER NUMBER (6)
YEAR yg'3 SEOUENTIAL PQ REVISION NUMBER
'.:< NUMBER PAGE (3)
D.
C.
Cook Nuclear Plant-Unit 2
TEXTplmort tpttt (t rtEIr)rtd, Irtt tddloboBI 1YRC Form 35543 I ((7) o 5
o o
o 3 l6 92 00 1
0 0
0 6oF 0 8
Cause
of, Event (Continued)
Considering that the boron concentration was near the upper administrative limit and that the blender used" to make up borated water for the RWST is coarsely controlled, these two factors together are believed to have contributed to the exceeding of the TS limit.
A sample was taken through the top of the RWST in an attempt to visually observe any indication of the presence of a ring of boric acid plated out on the walls of the tank.
During the sample the observation conditions were not ideal due to the high water level and temperature of the water in the tank, and therefore, a ring of boric acid could not be identified.
A discussion with Chemistry Department personnel noted that previous inspections of the RWST have not identified a ring of boric acid plated out on the tank walls.
In addition, a calculation was performed to determine the amount of boric acid coating that would be required to raise the concentration of the entire RWST 50 ppm.
The amount of water added on 1-11-92 would have raised the RWST level 14 inches.
A 50 ppm increase would require a band of boric acid 14 inches wide and more than 1 inch thick.
Considering that previous inspections of the RWST have not identified a ring of boric acid and the assumptions for the above calculation, it is believed that the presence of a band of boric acid of the above calculated magnitude was not present during the increase in the RWST level.
During the review of this event, the Plant did not 'discover an incorrect valve line-up which could have contributed to the increased boron concentration in the unit 2 RWST.
Anal sis of Event TS 3.1.2.8 (Borated Water Sources
- - Operating) and TS 3.5.5 (Refueling Water Storage Tank) require the RWST boron concentration to be between 2,400 and 24600 ppm of boron.
With the boron sample of the unit 2 RWST greater than the high TS limit, the TS action statement requires that the inoperable RWST be restored to operable status within one hour, or the unit to be in at least hot standby within six hours and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
With the boron concentration in the unit 2
RWST greater than the specification, this event is reportable per 10 CFR 50.73.(a).(2).(i).(B).
NRCFENN3444 )&Jul)
NRC FOAM366A (669)
U.S. NUCLEAR REGULATORY COMMISSION LICENSEE EVENT REPORT ILER)
TEXT CONTINUATION APPROVED OMB NO,3)504)104 EXP IR ES: 4/30/92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REOUESTI 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENTBRANCH (P-530), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON, DC 20555, AND TO 1ME PAPERWORK REDUCTION PROJECT 13)504)104). OFFICE OF MANAGEMENTAND BUDGET, WASHINGTON,DC 20503.
FACILITYNAME (1)
DOCKET NUMBER (2)
YEAR LER NUMBER (6) 1'? SEOUENTIAL
?9 (
NUMSEII y~v?'IEvrsrON
'os rrUMBEA PAGE (3)
D.
C.
Cook Nuclear Plant-Unit 2
o s
o o
o 3 l 6 2
TEXT /llmoro 4/?ooo /4 ror/rr/rod. Irro oddi)/)?rro/HRC Fonrr 36M3/ (17) 00 1
0 0
0.7 GF 0
8 Anal sis of Event (Continued)
The following is the analysis of this event as reported in the initial waiver of compliance request.
The upper limit for the RWST boron concentration is based on the calculation of post-LOCA (loss of coolant accident) sump pH and boron concentration.
The key assumptions in this calculation are that the RWST boron concentrations equal to 2,600 ppm and the reactor coolant system (RCS) boron concentration is equal to 2,400 ppm.
By taking credit for current operating conditions (i.e.,
near end of cycle, low boron concentration),
an Engineering evaluation has determined that adequate margin exists in the design basis calculation to permit RWST boron concentration to run as high as 2,872 ppm.
Based on this calculation, the Plant implemented a temporary upper limit of 2,700 ppm for RWST boron concentration as part of the waiver of compliance.
The above Engineering calculation was performed by American Electric Power Service Corporation (AEPSC)
~
An RCS boron concentration of 700 ppm was used to conservatively reflect current core conditions (130 ppm at lOOX power) in place of the 2,400 ppm RCS concentration assumed in the design basis calculation.
The calculation concentration shows that as long as the RCS boron concentration remains below 700 ppm, the boron concentration in the RWST may be up to 2,700 ppm without impacting the results of the original analysis'lso considered during the above analysis was the effect of the RWST boron concentration at 2,700 ppm on the hot leg recirculation switchover time and containment spray pH.
Based on the above Engineering calculation, it was concluded that the validity of the hot leg recirculation switchover time is ensured by the same reasoning.
In addition, the containment spray pH will be within its design basis during injection using the RWST with 2,700 ppm boron.
Considering the effects of the RWST boron concentration at 2,700 ppm on reactivity control, a boron concentration greater than the 2,600 ppm limit is conservative.
Based on the final review of this event, the above analysis of the RWST boron concentration greater than the specifications is still considered to be valid.
Therefore, the RWST boron concentration greater than the specification requirements is not considered to have created a significant safety concern or a significant hazard to the health and safety of the general public.(64)9)
U.S. NUCLEAR REGULATORYCOMMISSION LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION APPROVED OMB NO. 3)500104 EXPIRES: 4/30/92 ESTIMATED BURDEN PER
RESPONSE
TO COMPLY WTH THIS INFORMATION COLLECTION REQUEST: 50.0 HRS. FORWARD COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REPORTS MANAGEMENTBRANCH (P4)30), U.S. NUCLEAR REGULATORY COMMISSION, WASHINGTON. DC 20555. ANDTO 1HE PAPERWORK REDUCTION PROJECT (3)500)04), OFFICE OF MANAGEMENTAND BUDGET, WASHINGTON,DC 20503.
FACILITYNAME (1I DOCKET NUMBER (2)
LER NUMBER (6)
YEAR +A SEQUENTIAL ">K REVISION
~i.d NUMBfR
- wed NUMefR PAGE (3)
D.
C.
Cook Nuclear Plant-Unit 2
p s
p p
p 3
1 6
TEXTlllmare 4/rece /4 /erlrr/red. Iree eddl(r'orre/l/l)C Farm 366AS / ()7) 92 001 0
0 0
8 QF 0 8
Cor ective Action When the unit 2 RWST sample identified that the boron concentration was greater than the specification, confirmatory samples were drawn which confirmed the out-of-specification boron concentration and a reactor shutdown was commenced.
In addition, a process for dilution, recirculation, and increased sampling was begun until the unit 2 RWST boron concentration was restored to within the Technical Specification requirements.
The lessons learned from this event were forwarded by the Operations Department Superintendent by a letter to the Operations Management personnel to be discussed with their assigned personnel.
This letter stressed the need for conservative decision making and the responsibility of management personnel to clearly communicate Plant objectives and priorities to the appropriate control room personnel.
Operations Department procedures are scheduled to be revised before the third quarter to provide directions for the mixing of the RWST following additions to the tank, to restrict additions to the RWST that are outside the administrative boron concentration limits placed on RWST boron concentration, and to require planned additions to RWST volume.
Failure Com onent Identification None
Previous Similar Events
None identified.