ML20023B077

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-10 Re Emergency Radiological Surveys Onsite & EPIP-25 Re Nearsite Emergency Operations Facility (Neof).Revised Index Encl
ML20023B077
Person / Time
Site: Oyster Creek
Issue date: 11/29/1982
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20023B076 List:
References
NUDOCS 8212210555
Download: ML20023B077 (4)


Text

- _ - _.

e f

s GPU Nuclear P.O. Box 388 L Al Q

gg7 Forked River. New Jersey 08731 609-693-6000 Wnter's Direct Dial Number:

November 29, 1982 Mr. Ronald C. Haynes, Administrator Region I U.S. Nuclear Regulatory Com:nission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Haynes:

SUject: Oyster Creek Nuclear Generating Station Docket No. 50-219 Emergency Plan Implementing Procedures Enclosed are three copies of the Oyster Creek Emergency Plan Implementing Procedures (EPIP's) which have recently been revised.

This submittal is being made pursuant to Appendix E to 10 CFR 50 which requires that any changes to our implementing procedures be submitted within 30 days of such changes.

Very truly yours, W &-

W Peter B. Fiearer Vice President and Director Oyster Creek

.PBF: CMC:lse Enclosure s cc: Director (10 copies)

O gcf Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 n

y 8212210555 821213 PDR ADOCK 05000219 F

PDR GPU Nuclear is a part of the General Pubhc Utdities System

e.

11/11/82 Page 1 of 3 i

EMERCENCY PLAN IMPLEMENTING / ADMINISTRATIVE PROCEDURES I!rDEX PACE DATE 1

11/11/82 2

11/11/82 3

11/24/91 z

D.

,, 5 pm -,

....... 3

s n ', > i l ~.,,. :

2.is.

a.E d E..'.~..'

.,s'i*4O

) 'i\\@ Q[

Up YO Dato

--y.7

.r.

-e

.a

... o...

t o

11/11/82 Page 2 of 3

  • 2*,,,...l,.s.'..,..-
  • .., I :.. o..EPIP: AND.EPAP TITLE LISTING....

9

.i EMERGENCY ^ PLAN IMPLEMENTING PROCEDURES LAST LAST PROCEDURE #

TITLE REV. NO.

REV. DATE EPIP -

01 Classification of Emergency Conditions 3

7/20/82 EPIP -

02 Unusual Event 3

7/20/82 EPIP

  • 03 Alert 3

7/21/82 EPIP -

04 Site Emergency 3

7/21/82 EPIP -

05 General Emergency 3

7/21/82

.EPIP -

06 Not Issued EPIP -

07 Peesonnel Injury 1

2/23/82 EPIP -

08 Fire 1

2/10/82 EPIP -

09 Of fsite Dose. Assessment 1

2/23/82 EPIP -

10 Emergency Radiolcgical Survey - Onsite 1

9/23/82 EPIP -

11 Emergency Radiological Survey - Offsite 1

3/04/82 EPIP -

12 Personnel Accountability 2

1/27/82 EPIP -

13 Site Evacuation and Personnel Accountability After Site f

Evacuation 1

2/17/82 EPIP -

14 Damage Control 1

3/04/82 EPIP -

15 Toxic / Flammable Gas Release 1

2/10/82 EPIP -

16 Radioactive Liquid Release 0

2/23/81 EPIP -

17 Activation of the Parsippany Technical Functions Center 0

2/26/82 EP IP -

18 Activation of the Remote Assembly Area 0

2/23/81 EPIP -

19 Emergency Dosimetry 1

2/17/82 EPIP -

20 Tornado /Righ Winds Delete 2/19/82 EPIP -

21 Personnel Decontamination 1

2/19/82 EPIP -

22 Search and Rescue operations 0

2/2.4/81 EPIP -

23 Thyroid Blocking i

2/19/82 EPIP -

24 Emergency Respiratory Equipment 0

2/19/92 EPIP -

25 Activation of the Nearsite Emergency Operations Facility 1

9/23/82 EPIP -

26 Activation of the Technical Support Center 0 2/24/81 EPIP -

27 Activation of the Operations Support Center 0 2/24/81 EPIP -

28 Activation of the Farsite Emergency Operations Facility 0

2/24/81 EPIP -

29 Recovery Operations 1

3/04/82 EPIP -

30 Post Accident In-Plant Radiation Measurement O

9/23/82 A

-es.a w

. e m--

.:s 11/24/81 Page 3 of 3

..,g,,,,.,

,,,.y

,.7.,

J.:...

.p. :..

...7,:.,'.

g,.

..., j.:

..,,p

.. p,

. EMERGENCY PLAN IMPLEMENTING PROCEDURES LAST' LAST REV. NO.

REV. DATE PROCMURE #

TITLE ADMINISTRATIVE PROCEDURES EPAP -

01 Emergency Plan Implementing Delete Procedure Format EPAP -

02 Not Issued EPAP -

03 Not Issued EPAP -

04' Noe Issued 0

2/27/81 EPAP -

05 Bnergency Equipment Inventory 0

2/24/81 EPAP -

06 Energency Preparedness Training 0

2/24/81 EPAP -

07 Radiological Survey Team Training 0

2/24/81 EPAP.

08 Fire Brigade Training 0

2/24/81 EPAP -

09 Of fiste Fire Department Training 0

2/24/81 EPAP -

10 First Aid Training 0

2/24/81 EPAP -

11 Of fsite Medical Personnel Training -

EPAP -

12 Not Issued EPAP -

13 Energency Plan Implementing Procedure /

Administrative Procedure Conument, 0

2/24/81 Feedback and Evaluation Procedure EPAP -

14 Energency Plan Implementing Procedure /

Administrative Procedure Review /

0 2/24/81 Bevision Procedure EPAP -

15 Bnergency Response Mobilization (Proposal)

EPAP -

16 Maintaining Energency Preparedness 0

2/24/81

\\

i l

y - - -

,-,--y,

=.-4ey, ew + Tt PF****T*

--em-