January 16, 2020 Summary of Public Meeting with Southern Nuclear Operating Company
ML20017A074
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/27/2020
From: Jennivine Rankin
NRC/NRR/VPOB
To: Victor Hall
Office of Nuclear Reactor Regulation
Rankin J, NRR/VPO
References
Download: ML20017A074 (9)


Text

January 27, 2020 MEMORANDUM TO: Victor E. Hall, Chief Vogtle Project Office Office of Nuclear Reactor Regulation FROM: Jennivine Rankin, Project Manager /RA/

Vogtle Project Office Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON JANUARY 16, 2020 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on January 16, 2020. The purpose of the meeting was to discuss SNCs submittal of the Vogtle Electric Generating Plant (VEGP) Unit 3 and 4 plant-specific emergency action levels (EALs) and the license amendment request (LAR) regarding reconciliation of environmental conditions inputs to civil structural design licensing basis.

The meeting notice can be found in Agencywide Documents Access and Management System (ADAMS) Accession No. ML19322C790. The meeting notice is also posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The other documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:

  • Submittal of Plant-Specific Emergency ML19284C114 Action Levels in Accordance with License Condition 2.D(12)(d)
  • LAR-19-019: Reconciliation of ML19347C046 Environmental Conditions Inputs to Civil Structural Design Licensing Basis

V. Hall Summary of Meeting:

Technical Discussion of Submittal of Plant-Specific Emergency Action Levels in Accordance with License Condition 2.D(12)(d)

On January 16, 2020, staff from the NRC conducted a public meeting with representatives from SNC to discuss the submittal of the VEGP EAL Scheme. The VEGP COL License Condition 2.D.(12)(d) states, No later than 180 days before initial fuel load, SNC shall submit to the Director of NRO, or designee, in writing, a fully developed set of plant-specific emergency action levels (EALs) for Vogtle Unit 3 [and Unit 4] in accordance with the criteria defined in Amendment No. 77 [76 for Unit 4]. The EALs shall have been discussed and agreed upon with State and local officials. The license condition is in place in part, to confirm specific actions, found in within Enclosure 8 of SNCs January 31, 2017 (ADAMS Accession No. ML17031A445), submittal, were completed in accordance with the criteria defined in Amendment Nos. 77 and 76. The specific items are referred to as LC1 through LC8 below. In a letter dated October 11, 2019, SNC submitted an EAL scheme in response to the license condition (ADAMS Accession No. ML19284C118).

Since the October 11, 2019, submittal is not a licensing action, NRCs review was cursory to obtain an assessment of whether specific actions found in Attachment 5 within Enclosure 8 of SNCs January 31, 2017, submittal were addressed in accordance with the criteria defined in Amendment Nos. 77 and 76. The NRC staff identified that the EAL scheme does contain changes made by SNC under 10 CFR 50.54(q)(3) without prior NRC approval, which have not yet been inspected. The NRC may elect to review these changes made under 50.54(q)(3) against the previous NRC-approved EAL scheme as an inspection action in the future to determine whether the changes made by SNC in its October 11, 2019, submittal constituted a reduction in effectiveness by significantly altering the EAL scheme criteria defined in Amendment Nos. 77 and 76.

The NRC staff noted the following potential questions if the inspection was conducted today:

  • The note contained in Section 1.1 of SNCs October 11, 2019 submittal states the EAL radiation monitor setpoint calculations document SV0-GSEP-N0C-90000 is Approved Pending due to future potential design change updates as Vogtle 3&4 is being constructed. The NRC staff would need to review the final calculations to confirm completion of LC2-LC8.
  • For LC3, SNC did not provide the calculation for the effluent radiation monitor threshold values in RA1. Also, SNC removed an instrument used in the approved EAL scheme (VFS-RY-103).
  • For LC6, SNC did not provide the calculation for the containment radiation monitor supporting the fuel clad loss threshold value in Fission Product Barrier Criteria Fuel Clad-Loss 3.A. In addition, SNC changed the engineering units from R/hr to rad/hr.

These are separately defined terms in 10 CFR Part 20, and depending on the type of radiation, and the associated energy level, the numbers can be quite different. The NRC staff noted SNC did this in other areas of its package and appears to assume a 1:1 ratio, which depending of the type of radiation, may not be true.

V. Hall

  • Documentation (available for inspection) that EALs, including changes made under 50.54(q) as part of the license condition submittal, have been discussed and agreed upon with State and local officials.

NRC staff notes that based on an estimated fuel load date of November 23, 2020, the 180 day milestone for completion of COL License Condition 2.D.(12)(d) would be May 26, 2020, which provides time to facilitate any additional changes SNC might elect to make prior to 180 days before initial fuel load.

At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Technical Discussion of LAR-19-019: Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing Basis On January 16, 2020, staff from the NRC conducted a public meeting with representatives from SNC to discuss LAR-19-019. The discussion is summarized below:

  • The NRC staff noted that in Enclosure 2 of the LAR, the final column in UFSAR Table 3H.5-9 (Sheet 1 of 3 and 2b of 3) includes required/provided ratio values of 1.0 and 0.99 respectively; however, the footnote states that a 2 percent value that may be added to the design limit as an allowance for minor variances. The NRC staff notes that this would increase the ratios above 1.0. SNC agreed that a revision to the tables would be needed. In addition, the NRC staff noted a typographical error regarding the spelling of the acronym for spent fuel pool (SFP).
  • The NRC staff noted that the LAR describes temperature changes that will be evaluated for several structures at VEGP Units 3 and 4; however, the LAR does not address the impact of those temperature changes on the capability of pumps or valves to perform their design functions. SNC clarified that there are not any changes to the design specifications for pumps, valves, or piping at VEGP Units 3 and 4 as a result of the LAR.
  • SNC intends to submit a supplement to the LAR to clarify both issues.

At the conclusion of the presentation, there was an opportunity for the public to provide comments and ask questions. There were no comments or questions from the public.

Docket Nos.: 52-025 52-026

Enclosure:

As stated cc w/encls: See next page

ML20017A074 *via e-mail NRC-001 OFFICE PM: NRR/VPO LA: NRR/VPO PM: NRR/VPO BC: NRR/VPO NAME JRankin* (c) RButler* CSantos* VHall*

DATE 1/17/2020 1/17/2020 1/21/2020 1/24/2020 OFFICE PM: NRR/VPO NAME JRankin (s)

DATE 1/27/2020 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Thursday, January 16, 2020 Teleconference 9:00 a.m. - 12:00 p.m.

PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.

OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1

PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, January 16, 2020 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.

List of Attendees Name Organization Representing the Nuclear Regulatory Commission Jennivine Rankin Olivier Lareynie Jukka Kallionpaa NRR/VPO Don Habib Chandu Patel Clay Johnson Don Johnson Joe Anderson NSIR Dan Barss*

Kathy Brock*

Jody Martin OGC Eugene Guthrie* RII Tom Scarbrough Bryce Lehman NRR/DEX Pravin Patel Representing Industry Kelli Roberts*

Shannon Ramey*

John Hall*

Ted Amundson*

Jonathan Hartman*

Ricky Collings*

Amy Chamberlain*

Nick Kellenberger* Southern Nuclear Operating Company Eddie Grant*

Adam Quarles*

Jason Weathersby*

John Varnadore*

Yasmeem Arafeh*

Stephanie Agee*

Mark Humphrey*

Si Wu*

Zach Harper*

Michael Patterson* Westinghouse Electric Company Jessica Phillips*

Edward Drake*

Public Participants Gregory Richardson* Engineering Planning and Management

  • = participated via teleconference Enclosure 2

Vogtle Mailing List (Revised 11/12/2019) cc:

Resident Manager Resident Inspector Oglethorpe Power Corporation Vogtle Plant Units 3 & 4 Alvin W. Vogtle Nuclear Plant 8805 River Road 7821 River Road Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Barty Simonton Office of the Attorney General Team Leader 40 Capitol Square, SW Environmental Radiation Program Atlanta, GA 30334 Air Protection Branch Environmental Protection Division Southern Nuclear Operating Company 4244 International Parkway, Suite 120 Document Control Coordinator Atlanta, GA 30354-3906 3535 Colonnade Parkway Birmingham, AL 35243 Brian H. Whitley Regulatory Affairs Director Anne F. Appleby Southern Nuclear Operating Company Olgethorpe Power Corporation 3535 Colonnade Parkway, BIN N-226-EC 2100 East Exchange Place Birmingham, AL 35243 Tucker, GA 30084 Mr. Michael Yox County Commissioner Site Regulatory Affairs Director Office of the County Commissioner Vogtle Units 3 & 4 Burke County Commission 7825 River Road, Building 302 (ESB)

Waynesboro, GA 30830 Bin 6031 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3

Vogtle Mailing List Email aagibson@southernco.com (Amanda Gibson) acchambe@southernco.com (Amy Chamberlian) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)

Bill.Jacobs@gdsassociates.com (Bill Jacobs) corletmm@westinghouse.com (Michael M. Corletti) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dlfulton@southernco.com (Dale Fulton) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David)

G2NDRMDC@southernco.com (SNC Document Control)

George.Taylor@opc.com (George Taylor) harperzs@westinghouse.com (Zachary S. Harper) james1.beard@ge.com (James Beard)

JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)

John.Bozga@nrc.gov (John Bozga)

Joseph_Hegner@dom.com (Joseph Hegner) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)

KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)

Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)

MKWASHIN@southernco.com (MKWashington) mphumphr@southernco.com (Mark Humphrey)

MSF@nei.org (Marvin Fertel) nirsnet@nirs.org (Michael Mariotte)

Nuclaw@mindspring.com (Robert Temple)

Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) ppsena@southernco.com (Peter Sena,III) r.joshi15@comcast.net (Ravi Joshi) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak)

Page 2 of 3

Vogtle Mailing List sblanton@balch.com (Stanford Blanton)

Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) sjones@psc.state.ga.us (Shemetha Jones) skauffman@mpr.com (Storm Kauffman) slieghty@southernco.com (Steve Leighty) sroetger@psc.state.ga.us (Steve Roetger) syagee@southernco.com (Stephanie Agee)

TomClements329@cs.com (Tom Clements)

Vanessa.quinn@dhs.gov (Vanessa Quinn) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)

William.Birge@hq.doe.gov (William Birge)

X2edgran@southernco.com (Eddie R. Grant) x2gabeck@southernco.com (Gary Becker)

X2hagge@southern.com (Neil Haggerty)

X2wwill@southernco.com (Daniel Williamson)

Page 3 of 3