Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident - Supplemental Information
ML19238A341
Person / Time
Site: Calvert Cliffs, Salem, Mcguire, Palo Verde, Harris, Saint Lucie, Point Beach, Grand Gulf, Byron, Arkansas Nuclear, Braidwood, Prairie Island, River Bend, Ginna, Vogtle, Waterford, Farley, Clinton, South Texas, Comanche Peak, McGuire, Crane  Constellation icon.png
Issue date: 10/11/2019
From: Robert Bernardo
Beyond-Design-Basis Management Branch
To:
Arizona Public Service Co, Duke Energy Carolinas, Duke Energy Progress, Entergy Operations, Exelon Generation Co, Florida Power & Light Co, Point Beach, Public Service Enterprise Group, South Texas, Southern Nuclear Operating Co, Vistra Operating Co. (VistraOpCo)
Bernardo R, NRR/DLP, 415-2621
References
Download: ML19238A341 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555-0001 October 11, 2019 The Licensees of Power Reactors on the Enclosed List

SUBJECT:

DOCUMENTATION OF THE COMPLETION OF REQUIRED ACTIONS TAKEN IN RESPONSE TO THE LESSONS LEARNED FROM THE FUKUSHIMA DAI-ICHI ACCIDENT-SUPPLEMENTAL INFORMATION The purpose of this letter is to clarify the documentation of the completion of required actions taken by licensees in response to the lessons-learned from the Fukushima Dai-ichi accident for the power reactors listed in Table 1. The clarification is being provided in response to Commission direction provided in the Affirmation Notice and Staff Requirements Memorandum (SRM) dated January 24, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19023A038), associated with SECY-16-0142, "Draft Final Rule-Mitigation of Beyond-Design-Basis Events [MBDBE) (RIN 3150-AJ49)," (ADAMS Accession No. ML16291A186).

BACKGROUND The letters to licensees listed in Table 1 were issued while the NRC was considering a new regulation (Section 50.155 of Title 10 of the Code of Federal Regulations (10 CFR), "Mitigation of Beyond-Design-Basis Events"). At that time, the staff had provided a draft final rule and supporting documentation to the Commission for approval in SECY-16-0142 (ADAMS Accession No. ML 16301AOOS). In the January 24, 2019, SRM (ADAMS Accession No. ML19023A038), the Commission approved the final MBDBE rule, with edits. The final rule approved by the Commission contains provisions that make generically applicable the requirements imposed by Orders EA-12-049 and EA-12-051 and supporting requirements for training and documentation of changes. However, the Commission directed that the final rule's language be revised to remove requirements that are addressed at the regulatory guidance level, and to remove the requirement to address seismic and flooding reevaluated hazards in the mitigation strategies. 1 The NRC staff made conforming changes to the final rule as directed by the Commission. The final rule was published in the Federal Register on August 9, 2019 (84 FR 39684).

The letters listed in Table 1 acknowledged and documented that the actions required by the NRC in response to three orders, as well as the information provided in response to the March 12, 2012, 50.54(f) letter, have been completed for the applicable site. Table 1 contains a complete listing of the completion letters that were issued prior to the Commission approval of 1 The Commission directed the staff to assess the reevaluated hazards on a plant-specific, case-by-case basis under the requirements of 10 CFR § 50.109, "Backfitting," and§ 52.98, "Finality of combined licenses; information requests." The process used by the staff is documented in two "binning" letters which can be found in ADAMS at Accession Nos. ML19140A307 and ML19067A247.

the MBDBE rule. In light of the changes to the final MBDBE rule, the NRC staff has taken action to review the previous conclusions made related to the 50.54(f) letter that could have been affected by the final MBDBE rule. Based on this review, the NRG has determined that the previous conclusions remain valid for the sites listed in Table 1 and further regulatory actions are not warranted. This letter discusses the actions taken by the NRG staff to confirm that additional regulatory is not warranted for the sites addressed by the Table 1 letters.

The staff is not determining whether the licensee complies with the final MBDBE rule. Oversight of compliance with the final MBDBE rule will be conducted through the reactor oversight process.

DISCUSSION The January 24, 2019, SRM directed the staff to use the 50.54(f) process to ensure that the NRC and its licensees will take the needed actions, if any, to ensure there is no undue risk to public health and safety due to the potential effects of the reevaluated hazards. The SRM also directed that the staff should continue these efforts, utilizing existing agency processes, to determine whether an operating power reactor license should be modified, suspended, or revoked in light of the reevaluated hazard. The staff's actions in response to the Commission's direction are documented in a seismic binning letter and a flooding binning letter (ADAMS Accession Nos. ML19140A307 and ML19067A247, respectively). The binning letters address the treatment of reevaluated seismic and flooding information.

In the final binning letters for both seismic and flooding hazard reevaluations, the sites listed in Table 1 were binned as Category 1 sites, confirming that no additional information or regulatory actions are needed2

  • Category 1 includes sites where no additional information is needed. This category includes sites that have all the seismic or flood hazard mechanisms bounded by the current design basis, or sites where the licensee has previously demonstrated that existing seismic capacity or effective flood protection will address the unbounded reevaluated hazards.

Staffing and communications are considered supporting elements for the overarching requirement to develop, implement, and maintain the mitigation strategies for beyond-design-basis external events, which contributes to the protection of public health and safety. The NRC has concluded that a separate requirement in the MBDBE rule for the staffing and communications elements would not constitute a substantial increase in the overall protection of the public health and safety or the common defense and security, and that these elements are appropriately maintained in regulatory guidance. The information provided in response to Enclosure 5 of the 50.54(f) letter and the conclusions reached by the NRC in the staff assessments remain valid. The NRC performed onsite inspections using Temporary Instruction 2515/191, "Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans" to verify that the emergency communications and staffing plans at these sites have been implemented as described by the licensee in their submittals. No additional regulatory actions are needed.

2 The flooding binning letter discusses additional clarifying information for Comanche Peak Nuclear Power Plant, Units 1 and 2 (letter dated July 23, 2019 (ADAMS Accession No. ML19206A073)) and Point Beach Nuclear Plant, Units 1 and 2 (completed modifications that ensure effective flood protection for the local intense precipitation flood hazard mechanism without reliance on FLEX) that support this conclusion.

CONCLUSION Based on the conclusions documented in the letters listed in Table 1, as supplemented by the seismic and flooding binning letters and the discussion above, the NRG staff continues to conclude that the licensees for the sites listed in Table 1 have implemented the NRG-mandated safety enhancements resulting from the Fukushima Dai-ichi accident through implementation of Orders EA-12-049, EA-12-051, and responses to the 50.54(1) letter. No further regulatory decisionmaking is required for those sites listed in Table 1 related to the Fukushima lessons learned.

If you have any questions, please contact me at 301-415-2621 or by e-mail at Robert.Bernardo@nrc.gov.

Enclosure:

List of Licensees cc w/encl: Distribution via list serv Sincerely,

~£,~~Manager Beyond-Design-Basis Management Branch Division of Licensing Projects Office of Nuclear Reactor Regulation

. 4.

Table 1 Listing of Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai*ichi Accident ADAMS Site Date Accession No.

Arkansas Nuclear One, Units 1 and 2 Julv 11, 2018 ML18163A418 Braidwood Station, Units 1 and 2 Mav 1, 2018 ML180938538 Bvron Station, Units 1 and 2 Mav 1, 2018 ML18094A754 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 March 28, 2018 ML18071A197 Clinton Power Station, Unit No. 1 June 28, 2017 ML17054C552 Comanche Peak Nuclear Power Plant, Units 1 and August 8, 2018 ML18207A272 23 Grand Gulf Nuclear Station, Unit 1 Auaust 8, 2018 ML18200A179 Josenh M. Farlev Nuclear Plant, Units 1 and 2 Seotember 20, 2018 ML18249A109 McGuire Nuclear Station, Units 1 and 2 Julv 11, 2018 ML18163A396 Palo Verde Nuclear Generating Station, Units 1, 2, December 21, 2017 ML17335A119 and 3 Point Beach Nuclear Plant, Units 1 and 24 Auaust 8, 2018 ML18200A181 Prairie Island Nuclear Generating Plant, Units 1 December 21, 2017 ML173038162 and 2 R. E. Ginna Nuclear Power Plant March 26. 2018 ML180438160 River Bend Station, Unit 1 Seotember 15, 2017 ML17237C041 Salem Nuclear Generatinn Station, Units 1 and 2 Januarv 25, 2018 ML17335A118 Shearon Harris Nuclear Power Plant, Unit 1 March 28, 2018 ML18071A196 South Texas Proiect, Units 1 and 2 Mav 25, 2018 ML18120A373 St. Lucie Plant Units 1 and 2 March 26, 2018 ML180438161 Three Mile Island Nuclear Station, Unit 1 Mav 25, 2018 ML18120A351 Voatle Electric Generatinn Plant, Units 1 and 2 Seotember 20, 2018 ML18249A112 Waterford Steam Electric Station, Unit 3 Auaust 8, 2018 ML18207A274 3 The flooding binning letter (ADAMS Accession No. ML19067A247) discusses additional clarifying information provided by the licensee for Comanche Peak Nuclear Power Plant, Units 1 and 2 in a letter dated July 23, 2019 (ADAMS Accession No. ML19206A073).

4 The flooding binning letter (ADAMS Accession No. ML19067A247) discusses additional clarifying information concerning Point Beach Nuclear Plant, Units 1 and 2 (completed modifications that ensure effective flood protection for the local intense precipitation flood hazard mechanism without reliance on FLEX).

LIST OF APPLICABLE POWER REACTOR LICENSEES Arkansas Nuclear One, Units 1 and 2 Entergy Operations, Inc.

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 ANO Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

N-TSB-58 1448 S.R. 333 Russellville, AR 72802 Braidwood Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear Braidwood Station 4300 Winfield Road Warrenville, IL 60555 Byron Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear Byron Station 4300 Winfield Road Warrenville, IL 60555 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Clinton Power Station, Unit No. 1 Exelon Generation Company, LLC Docket No. 50-461 License No. NPF-62 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

Exelon Nuclear Clinton Power Station 4300 Winfield Road Warrenville, IL 60555 Comanche Peak Nuclear Power Plant, Units land 2 Vistra Operations Company, LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Ken J. Peters Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Comanche Peak Nuclear Power Plant Vistra Operations Company, LLC 6322 N FM 56 P.O. Box 1002 Glen Rose, TX 76043 Enclosure

Grand Gulf Nuclear Station, Unit 1 Entergy Operations, Inc.

Docket No. 50-416 License No. NPF-29 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 Joseph M. Farley Nuclear Plant, Units 1 and i

Southern Nuclear Operating Company, Inc.

Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway Birmingham, AL 35243 McGuire Nuclear Station, Units 1 and 2 Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Tom Ray Site Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529, and STN 50-530 License Nos. NPF-41, NPF-51, and NPF-74 Mr. Robert S. Bement Executive Vice President Nuclear/

Chief Nuclear Officer Arizona Public Service Company Palo Verde Nuclear Generating Station P.O. Box 52034 MS 7602 Phoenix, AZ 85072-2034 Point Beach Nuclear Plant, Units 1 and 2 NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Point Beach, LLC Mail Stop: NT3/JW 15430 Endeavor Drive Jupiter, FL 33478 Prairie Island Nuclear Generating Plant, Units 1 and 2 Northern States Power Company -

Minnesota Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Mr. Scott Sharp Site Vice President Northern States Power Company -

Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089 R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC Exelon Generation Company, LLC Docket No. 50-244 License No. DPR-18 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

River Bend Station, Unit 1 Entergy Operations, Inc.

Docket No. 50-458 License No. NPF-47 Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 St. Francisville, LA 70775 Salem Nuclear Generating Station, Units 1 and 2 PSEG Nuclear, LLC Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75 Mr. Peter P. Sena, Ill President and Chief Nuclear Officer PSEG Nuclear LLC - N09 Salem Nuclear Generating Station P.O. Box236 Hancocks Bridge, NJ 08038 Shearon Harris Nuclear Power Plant, Unit 1 Duke Energy Progress, LLC Docket No. 50-400 License No. NPF-63 Ms. Tanya Hamilton, Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.

M/C HNP01 New Hill, NC 27562-0165 South Texas Project, Units 1 and 2 STP Nuclear Operating Company Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Mr. G. T. Powell President and CEO STP Nuclear Operating Company South Texas Project P.O. Box289 Wadsworth, TX 77483 St. Lucie Plant, Units 1 and 2 Florida Power and Light Company Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Mr. Mano Nazar President, Nuclear Division and Chief Nuclear Officer Nuclear Division Florida Power & Light Company Mail Stop EX/JB 700 Universe Blvd.

Juno Beach, FL 33408 Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC Docket No. 50-289 License No. DPR-50 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Vogtle Electric Generating Plant, Units 1 and 2 Southern Nuclear Operating Company, Inc.

Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.

3535 Colonnade Parkway Birmingham. AL 35243 Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.

Docket No. 50-382 License No. NPF-38 Site Vice President Entergy Operations, Inc.

Waterford Steam Electric Station 17265 River Road Killona, LA 70057-3093

ML19238A341 OFFICE NRR/DLP/PBMB/PM NRR/DLP/PBMB/LA NRR/DLP/PBMB/BC{A)

NAME RBernardo Slent BTitus DATE 8/23/19 8126/19 8/30/19 OFFICE NRR/DLP/PBMB/PM NAME RBemardo DATE 10/11/19