Informs of Typo in NRC Stating That Util Pressure /Temp Limits for Plant RCS Valid Through 22 Efpys. Correct Period of Time Should Have Read 12 Efpys. Marked-up Ltr Encl.W/O Encl
ML20012C462
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/13/1990
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
GL-88-11, TAC-71842, NUDOCS 9003210362
Download: ML20012C462 (3)


Text

m March 13, 1990 Docket No. 50 298 t

Mr. George A. Trevers, Division Manager. Nuclear Support Nebraska Public Power District Post Office Box 499 Columbus, Nebraska C0001 0499

Dear Mr. Trevers:

J

SUBJECT:

REVIEW OP HEERASKA PubLIC POWER DISTRICT'S RESPONSE TO GENERIC LETTER EE.11 (TAC NO. 71842) t Due to a typographical error, the staff's letter dated February 23, 1990, stated that Nebraska Public Power District's pressure / temperature limits for the Cooper Nuclear Station reactor coolant system are valid through "22 effective full power years". The correct period of tirne should have read "12 effecthe full power years *.

A suarked.up copy of the letter is cnclosed.

9 Sincerely,

/s/

Paul W. O'Connor, Project Manager Project Directorate IV Division of Reactor Projects. III, IV, V and Special Projects 1

Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBilTION w/o enclosure Docket Tite"3 NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 F. Hebdon P. Noonan P. O'Connor OGC.Rockvillt E. Jordan MS MNBB 3701 A. DcAgazio C. Y. Cherg J. Tsao ACRS(10)MSP.315 PD4 Plant File

~ ~ ~ ~

~~~

~

tbr/TKT

'PD~47h T

=

......L... :.. 4.,...... :......"..'... :.....".'.... :.........

UFt:Pb~47II

.....:... T...

NAME :PNoon

P0'Connor:bj:FHebdon DATE:03/$/90
03/d/90
03/j3/90

-~~~brF1tlW REIUWtbW Docuiiient Har.e: 7DDPUFUF/HEU 1m

[

9003210362 900313; g

PDR ADOCK 0500 P

1

',' /

'o UNITE 3 8TATES 8\\

F,'g NUCLEAR RECULATORY COMMISSION i. kg.,, c 3

e wAssiwatow, o, c. 20sss

.....P March 13,1990 Docket No. 50-298 Mr. George A. Trevors, Divisien l'.anager - Nuclear Support Nebresta Public Power District Post Office Box 499 Cclumbus,I;ebraska 68E01-0499 D(er Mr. Trevers:

SUBJECT:

REVIEW OF tlEBRASKA PUBLIC POWER DISTRICT'S RESPONSE TO CEt;ERIC LETTER 00-11 (TAC NO. 71642)

Lue to a typcErephical error, the staff's letter dated February 23, 1990, stated thet I:<braska Public Power District's pressure /tmperature limits for the Cecper liucleer Station reactor coolant system cre valid through "22 effective full power yeers". The correct period of titre shculd have read "12 effective full peker years *.

A rarked-uP ccpy of the letter is tnclosed.

Sincerely, Paul W. O'Connor, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, y and Special Projects Office of_Huclear Reactor Regulation Enclosurt:

As stated cc w/ enclosure:

See ncxt page 4

l l

a

Mr. George A. Trevors Nebraska Public Power District Cooper Nuclear Station t

cC' Mr. G. D. Watson, General Counsel Hebraska Public Power District P. O. Cox 499 Colustus, ?!ebraska 68001 Cooper Nuclear Station ATTN: tir. Guy R. Horn Divisier.

Manager of Nuclear Operations P. O. Box 98 Brownville, hebraska 08321 Dennis Grams, Director Hebraske Departtent of Environmental Ccr. trol P. O. Box 98922 Lincoln, Nebraska 68509-8922 Mr. Larry Boh1Len, Chairran lien.aha Ccunty Board of Comissioners tier.ab6 County Courthouse 1824 N Street Auburn,tiebraska (8305 Senior Posident Inspector U.S. Nuc1 car Regulatory Conaission P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlirston, Texas 76011 l'r. Harold Borchart Director Division of Radiological Health Department of Health 301 Centennial Hall, South P. O. Box 95007 Lincoln, tiebraska 68509-5007