Proposed Tech Specs,Changing Tables 4.2.A,4.2.B,4.2.C & 4.2.D Re Logic Sys Functional TestingML20012C448 |
Person / Time |
---|
Site: |
Pilgrim |
---|
Issue date: |
03/08/1990 |
---|
From: |
BOSTON EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20012C447 |
List: |
---|
References |
---|
NUDOCS 9003210304 |
Download: ML20012C448 (12) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20072T0521994-09-0606 September 1994 Proposed Tech Specs Modification to Append a of Operating License DPR-35 Re Maintenance of Filled Discharge Pipe ML20072S0501994-09-0606 September 1994 Proposed Tech Specs Re Instrumentation That Initiates Primary Containment Isolation & Initiates or Controls Core & Containment Systems ML20072S0081994-09-0606 September 1994 Proposed Tech Specs Re Primary Containment,Oxygen Concentration & Vacuum Relief ML20072S0861994-09-0606 September 1994 Proposed Tech Specs Re Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20069M3311994-06-0909 June 1994 Proposed Tech Specs,Increasing Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys,Including Section 4.5.H, Maint of Filled Discharged Pipe ML20067B7111994-02-0909 February 1994 Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion BECO-93-156, Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3)1993-12-10010 December 1993 Proposed Tech Specs Requesting Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059A9361993-10-19019 October 1993 Proposed Tech Specs for Removal of Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint1993-10-19019 October 1993 Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint ML20046D0441993-08-0909 August 1993 Proposed Tech Specs,Proposing 24 Month Fuel Cycle ML20044G1331993-05-20020 May 1993 Proposed Tech Specs Reducing MSIV Low Turbine Inlet Pressure Setpoint from Greater than or Equal to 880 Lb Psig to Greater than or Equal to 810 Psig & Reducing Min Pressure in Definition of Run Mode from 880 Psig to 785 Psig BECO-93-016, Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively1993-02-11011 February 1993 Proposed TS 3.5.C,D & E Re k-infinity Factor,Spent Fuel Pool Storage Capacity & Max Loads Allowed to Travel Over Fuel Assemblies,Respectively 1999-06-16
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20196D0241999-06-16016 June 1999 Proposed Tech Specs Re Reactivity Control Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8161999-05-11011 May 1999 Proposed Tech Specs Re HPCI & RCIC Surveillance Testing ML20206H9771999-05-0505 May 1999 Proposed Tech Specs Modifying Licensing Basis for EDG on- Site Diesel Fuel Storage Requirements & Corresponding TSs ML20205A1451999-03-23023 March 1999 Core Shroud Insp Plan ML20207F1171999-03-0303 March 1999 Proposed Tech Specs Page 3/4.6-13 Re Reactor Vessel Matl Surveillance Program Withdrawal Schedule ML20151S3851998-08-31031 August 1998 Long-Term Program:Semi-Annual Rept ML20237E0851998-08-24024 August 1998 Proposed Tech Specs Pages Supporting Proposed TS Amend Related to EDG AOT ML20236X7191998-07-31031 July 1998 Proposed Tech Specs Page 3/4.9-5 Re Suppl to EDG for Allowed Outage Time ML20249C7101998-06-26026 June 1998 Proposed Tech Specs Correcting Typos & Updating Bases ML20249B3231998-06-15015 June 1998 Revised Complete Set of TS Pages Re Relocation of Radioactive Effluent TS & Radiological Environ Monitoring Program to ODCM ML20217F9341998-03-26026 March 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20217H2791998-03-25025 March 1998 Proposed Tech Specs 3.6.A.1 & 4.6.A.1,pertaining to Primary Sys Boundary,Thermal & Pressurizations Limitations & Surveillance Requirements & Basis 3/4.6.A ML20203D4981998-02-20020 February 1998 Proposed Tech Specs Pages,Incorporating Ultimate Heat Sink Temperature of 75 F Into TS 3/4.5.B & Bases,As Required by Amend 173 ML20217K5691997-10-24024 October 1997 Proposed Tech Specs Page Adding Footnote Declaring One Containment Isolation valve,30-CK-432,operate for Limited Period Despite Not Being within IST Interval for Reverse Flow Testing ML20211N6871997-09-16016 September 1997 Rev 9 to Procedure 8.I.1.1, Inservice Pump & Valve Testing Program ML20211G2381997-09-15015 September 1997 Rev 8 to PNPS-ODCM, Pilgrim Nuclear Power Station Odcm ML20211G2311997-09-12012 September 1997 Proposed Tech Specs Re Radiological Environ Monitoring Program Moved to ODCM ML20216C0631997-08-29029 August 1997 Semi-Annual Long Term Program Schedule ML20210K4381997-08-0808 August 1997 Revised TS Pages 3/4.5-7,B3/4.5-6 & B3/4/.5-7 Requiring Verification That SBO-DG Is Operable Prior to Voluntarily Entering LCO ML20196J0041997-07-22022 July 1997 Proposed Revised TS Bases for Section 3.5.F,correcting Volume of Water Available in Refuel Cavity & Dryer/Separator Pool When Flooded to Elevation 114 Ft & Revising Torus Water Volume to Reflect Volume Above Min Pump NPSH ML20210K3551997-07-0101 July 1997 Rev 16 to Procedure 7.8.1, Water Quality Limits ML20136J5501997-03-0707 March 1997 Proposed Tech Specs Rev for Section 3.10, Core Alterations Allowing Removal of Suspect Fuel Bundles Out of Planned Sequence ML20134C9671997-01-24024 January 1997 Proposed Tech Specs 2.0 Re Safety Limits ML20133A6511996-12-23023 December 1996 Proposed Revised Tech Specs 1.0 Re definitions,3.4 Re Standby Liquid Control sys,3.5 Re Core & Containment Cooling systems,3.7 Re Containment Systems & 3.9 Re Auxiliary Electrical Sys ML20132E5491996-12-10010 December 1996 Proposed Tech Specs Table 3.2.C.1 Re Instrumentation That Initiates Rod Blocks,Table 3.2.C.2 Re Control Rod Block Instrumentation Setpoints & Table 4.2.C Re Minimum Test & Calibr Frequency for Control Rod Blocks Actuation ML20135C1461996-11-26026 November 1996 Proposed Tech Specs,Modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consisten W/Lco 3/4.7.A.2.a.4 ML20134K4361996-11-0707 November 1996 Proposed Tech Specs Re Installation of BWROG Enhanced Option 1A ML20117K6551996-09-0505 September 1996 Proposed Tech Specs,Providing Revised TS Pages 3/4.5-7 & 3/4.5-6 ML20116M1561996-08-12012 August 1996 Proposed Tech Specs to Plant TS Section 6.0,Administrative Controls & Sections 6.5.B.10.C & 6.14 of Util Quality Assurance Manual ML20117K6611996-07-17017 July 1996 Rev 15 to PNPS Procedure 1.2.2 Administrative OPS Requirements ML20108C0581996-05-0101 May 1996 Proposed Tech Specs Re Core Alteration to LCO & Surveillance Conditions Associated W/Secondary Containment ML20111B4201996-05-0101 May 1996 Proposed Tech Specs,Reflecting Implementation of 10CFR50 App J,Option B ML20111C2761996-05-0101 May 1996 Proposed Tech Specs 3.1.1 Re Reactor Protection Sys (Scram) instrumentation,3.2.C.1 Re Instrumentation That Initiates Rod Blocks & 3/4.4 Re Standby Liquid Control ML20108C1071996-05-0101 May 1996 Proposed Tech Specs,Relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Boston Edison QA Manual ML20108A6561996-04-25025 April 1996 Proposed Tech Specs Re Part of Overall Effort to Improve Outage Performance at Plant ML20095E0771995-12-0808 December 1995 Proposed Tech Specs Bases Page B2-2,including GE11 GEXL Correlation Axial Power Profile & R-factor Ranges & Correcting Error in GE11 GEXL Correlation Mass Flux Range in GE Design ref,NEDE-31152-P, GE Fuel Bundle Designs ML20100J2521995-11-22022 November 1995 Rev 7 to Pilgrim Nuclear Power Station Odcm ML20092B5861995-09-0101 September 1995 Rev 0 to Third Ten-Yr Interval ISI Plan for Pilgrim Nuclear Power Station ML20092C4331995-09-0101 September 1995 Startup Test Rept for Pilgrim Nuclear Power Station Cycle 11 ML20092A4421995-08-31031 August 1995 Corrected Tech Spec Page Re Reactor High Pressure Trip Setting ML20086K2661995-07-14014 July 1995 Proposed Tech Specs Re Section 2.1,Bases:Safety Limits; Section 3.3.C,scram Insertion Times & Section 4.11.C, Minimum Critical Power Ratio to Reflect Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078R6221995-02-15015 February 1995 Proposed Tech Specs Substituting for Pages Contained in Proposed TS Amends Submitted Prior to 950130 Authorization ML20078N4861995-02-0909 February 1995 Proposed Tech Specs,Increasing Reactor High Water Level Isolation Trip Level Setting ML20077Q1181995-01-13013 January 1995 Owner'S Specification for Reactor Shroud Repair ML20077M6921995-01-0909 January 1995 Proposed Reformatted Tech Specs & Bases ML20077A8991994-11-22022 November 1994 Proposed Tech Specs Re Suppression Chamber Water Level ML20077B1861994-11-22022 November 1994 Proposed Tech Specs 3.5.F,4.5.F.1 & 3.9.B.1 & 2 Re EDG Allowed out-of-svc Time ML20078K7961994-11-22022 November 1994 Proposed Tech Specs Re Changes to MSIV Leakage Requirement ML20078K8151994-11-22022 November 1994 Proposed TS Pages 3/4.2-20 & 3/4.2-35 Re Tables 3.2.C-1 & 4.2.C ML20078N8421994-11-18018 November 1994 Rev 32 to Procedure 8.7.3, Secondary Containment Leak Rate Test 1999-06-16
[Table view] |
Text
. .
C '
e .
ATTACHMENT B PROPOSED CHANGE-TO LSFT INTERVALS REVISED TECHNICAL SPECIFICATION PAGES 60. 62, 63. 64, and 77 900314 90032103g(
DR ADO 0500g9
3 PNPS TABLE 4.2.A -
MINIMUM TEST AND CALIBRATION FRE00ENCY FOR PCIS -
Instrument Channel (5) Instrument Functional Test Calibration Frecuency Instrument Check
- 1) Reactor High Pressure (1) Once/3 months None
- 2) Reactor Low-Low Hater Level (1) (7) (7) Once/ day
- 3) Reactor High Hater Level (1) (7) (7) Once/ day
- 4) Main Steam High Temp. (1) Once/3 months None
- 5) Main Steam High Flow (1) (7) (7) Once/ day
- 6) Main Steam Low Pressure (1) (7) (7) Once/ day
- 7) Reactor Mater Cleanup High Flow ~ (1) Once/3 months Once/ day
- 8) Reactor Water Cleanup High Temp. (1) Once/3 months None Loaic System Functional Test (4) (6) Frecuency
- 1) Main Steam Line Isolation Vvs. Once/18 months Main Steam Line Drain Vvs.
Reactor Hater Sample Vvs.
- 2) RHR - Isolation Vv. Control Once/18 months Shutdown Cooling Vvs.
Head Spray Discharge to Radwaste
- 3) Reactor Water Cleanup Isolation Once/18 months
- 4) Drywell Isolation Vvs. Once/18 months TIP Withdrawal Atmospheric Control Vvs.
Sump Drain Valves
- 5) Standby Gas Treatment System Once/18 months Reactor Building Isolation Amendment No. 107 60
~
PNPS -
TABLE 4.2.B MINIMUM TEST AND CALIBRATION FRE00ENCY FOR CSCS Loaical System Functional Test (4) (6) Frecuency Remarks
- 1) Core Spray Subsystem Once/18 months
- 2) Low Press. Coolant Injection Subsystem Once/18 months
- 3) Containment Spray Subsystem Once/18 months
- 4) HPCI Subsystem Once/18 months
- 5) HPCI Subsystem Auto Isolation Once/18 months
- 6) ADS Subsystem Once/18 months
- 7) RCIC Subsystem Auto Isolation Once/18 months
- 8) Diesel Generator Initiation Once/18 months
- 9) Area Cooling for Safeguard System Once/18 months 62
PNPS TABLE 4.2.C '
MINIMUM TEST AND CALIBRATION FRE0VENCY FOR CONTROL R0D BLOCKS ACTUATION Instrument Channel Instrument Functional Calibration Instrument Check 1Rit APRM - Downscale (1) (3) Once/3 Months Once/ Day APRM - Upscale (1) (3) Once/3 Months Once/ Day APRM - Inoperative (1) (3) Not Applicable Once/ Day IRM - Upscale (2) (3) Startup or Control Shutdown (2)
IRM - Downscale (2) (3) Startup or Control Shutdown (2)
IRM - Inoperative (2) (3) Not Applicable (2)
RBM - Upscale (1) (3) Once/6 Months Once/ Day RbH - Downstale (1) (3) Once/6 Months Once/ Day RBM - Inoperative (1) (3) Not Applicable Once/ Day SRM - Upscale (2) (3) Startup or Control Shutdown (2)
SRM - Inoperative (2) (3) Not Applicable (2)
SRM - Detector Not in Startup Position (2) (3) Not Applicable (2)
SRM - Downscale (2) (3) Startup or Control Shutdown (2)
IRM - Detector Not in Startup Position (2) (3) Not Applicable (2)
Scram Discharge Instrument Volume Once/3 Months Refuel Not Applicable Water Level-High Scram Discharge Instrument Once/3 Months Not Applicable Not Applicable Volume-Scram Trip Bypassed Recirculation Flow Converter Not Applicable Once/ Cycle ,
Once/ Day Recirculation Flow Converter-Upscale Once/3 Months Once/3 Months Once/ Day Recirculation Flow Converter-Inoperative Once/3 Months Not Applicable Once/ Day Recirculation Flow Converter-Comparator Once/3 Months Once/3 Months Once/ Day Off Limits Recirculation Flow Process Instruments Not Applicable Once/ Cycle Once/ Day Locic System Functional Test (4) (6)
System Logic Check Once/18 Months Amendment No. 110 63
PNPS .
TABLE 4.2.0 '
MINIMUM TEST AND CALIBRATION FRE00ENCY FOR RADIATION MONITORING SYSTEMS Instrument Channels Instrument Functional Calibration Instrument Check (2) 191t
- 1) Refuel Area Exhaust Monitors - Upscale (1) Once/3 months Once/ day
- 2) Refuel Area Exhaust Monitors - Downscale (1) Once/3 months Once/ day Loaic System Functional Tesi (4) (6) Frecuency
- 1) Reactor Building Isolation Once/18 months
- 2) Standby Gas Treatment System Actuation Once/18 months Amendment No. 89 64
4.2 BASES (Cont'd)
The automatic pressure relief instrumentation can be considered to be a 1 out of 2 logic system and the discussion above applies also.
The instrumentation which is required for the recirculation pump trip and alternate rod insertion systems incorporate analog transmitters.
The transmitter calibration frequency is once per refueling outage, which is consistent with both the equipment capabilities and the requirements for similar equipment used at Pilgrim. The Trip Unit Calibration and Instrument Functional Test is specified at monthly, which is the same frequency specified for other similar protective devices. An instrument check is specified at once per day; this is considered to be an appropriate frequency, commensurate with the design applications and the fact that the recirculation pump trip and alternate rod insertion systems are backups to existing protective instrumentation.
A logic system functional test interval of 18 months was selected to minimize the frequency of safety system inoperability due to testing and to minimize the potential for inadvertent safety system trips and their attendant transients. Based on industry experience and BWR Standard Technical Specifications, an 18 month testing interval provides adequate assurance of operability for this equipment.
1 Amendment No. 42, 127 77
.j a
ATTACHMENT C 1 i
PROPOSED CHANGE TO LSFT INTERVALS !
1 i
i
' MARKED-UP TECHNICAL SPECIFICATION l PAGES 60, 62. 63, 64, and 77 1
_+
l 1
-[ ,
.I I f
[
4 i
f i
i i
-i h
l k t
t
.s
.I h
- p
- i. :I t
l-
.. g PNPS TABLE 4.2.A MINIMUM TEST AND CALIBRATION FREQUENCY FOR PCIS Instrument funclip_n31 Test Calibratipn Frequency Instrupent_ Check IR$trume_nt_ Channel _151 Once/3 months None l
- 1) Reactor High Pressure (1) Once/ day (1) (7) (7)
- 2) Reactor Low-Low Hater Level (7) Once/ day
'3) Reactor High Water Level (1) (7)
Once/3 months None
- 4) Main Steam High Temp. (1)
(1) (7) (7) Once/ day
- 5) Main Steam High Flow (7) Once/ day
- 6) Main Steem Low Pressure (1) (7)
(1) Once/3 months Once/ day
- 7) Reactor Water Cleanup High Flow Once/3 months None
- 8) Reactor Hater Cleanup High Temp. (1) fr_equfncy LO91 C_ System Fullc_tional Tes_t (4) (6) _ ,m Once/6 monthsa;
- 1) Main Steam Line Isolation Vvs. __/
Main Steam Line Drain Vvs.
Reactor Hater Sample Vvs. reew Once/6 months"i
- 2) RHR - Isoiation Vv.. Control v-Shutdown Cooling Vvs.
Head Spray Discharge to Radwaste _ _.g
.3) Reactor Water Cleanup Isolation Once/6 months)I Once/6 months";'
- 4) Drywell Isolation Vvs. y TIP Withdrawal.
Atmospheric Control Vvs. _
Sump Drain Valves .
Standby Gas Treatment System Once/6monthsb .
5)- j Reactor Building Isolation 60 Revision 110' i
r o , , ,
, s - ,
TNPS .
TABIE Is.2.B .
MININUM TEST AND CALIDRATION F If4UENCY FUR CSCS -
Logic System Fitnetional Test (Is) (6) Trev ency Emarks
- 1) Core Spray Subsysten e/6 month
- 2) Ier Press. Coolant Injection Subsystem Once/6 months
= -
3,4 Containment Spray subsystem Once/6 months Is) H MI Subsystem
- Once/6sonths
- 5) HNI Subsystem Auto Isolation f M ~ i nee /6 ,
- 6) AD3 Subsystem f Once/6anonths '
- 7) RCIC Subsystem Auto Isolation Once/6sentheb) j .
- 8) Diesel Generator Initiation Once/6monthsh~ l
- 9) Area Cooling for Safeguard System nee /6 months ;
/
e
k J '
/
' ~
PNPS TABLE 4.2.C MINIMUM TEST AND_CA_LIBRATION FRUJJENCY__FOR_ CONTROL _ ROD _ BLOCKS _ ACTUATION Instr _ument_ Channel Insfrument Funcflonal Calibration Instr _Ument_Chett
_ Test APRM - Downscale (1) (3) Once/3 Months Once/ Day (1) (3) Once/3 Months Once/ Day APRM - Upscale APRM - Inoperative (1) (3) Not Applicable Once/Da'y IRM - Upscale (2) (3) Startup or Control Shutdown (2)
IRM - Downscale (2) (3) Startup or Control Shutdown (2)
IRM - Inoperative (2) (3) Not Applicable (2)
RBM - Upscale (1) (3) Once/6 Months Once/ Day RBM - Downscale (1) (3) Once/6 Months Once/ Day RBM - Inoperative (1) (3) Not Applicable Once/ Day SRM - Upscale (2) (3) Startup or Control Shutdown (2)
SRM - Inoperative (2) (3) Not Applicable (2)
SRM - Detector Not in Startup Position (2) (3) Not Applicable (2)
SRM - Downstale (2) (3) Startup or Control Shutdown (2)
IRM - Detector Not in Startup Position (2) (3) Not Applicable (2)
Scram Discharge Instrament Volume Once/3 Months Refuel Not Applicable Water Level-High Scram Discharge Instrument Once/3 Months Not Applicable Not Appilcable Volume-Scram Trip Bypassed Recirc:llation Flow Coaverter Not Applicable Once/ Cycle Once/ Day Recirculation Flow Converter-Upscalc Once/3 Months Once/3 Months Once/ Day Recirculation Flow Converter-Inoperative Once/3 Months Not Appilcable Once/ Day Recirculation flow Converter-Comparator Once/3 Months Once/3 Months Once/ Day Off Limits Recirculation Flow Process Instruments Not Applicable Once/ Cycle Once/ Day LoSI C_Syltem_Eunctional Teit_(4) (6) %
System logic Check Once/6 Months /
Revision 113 63 1
PNPS
- TABLE 4.2.0 MINIMUM TEST AND CAL 78 RATION FREQUENCY FOR RADIATION MONITORING SYSTEMS Instrument Channcis Instrument Functional Calibration Instru. - Check (2)
---.-.me_.nt -
I) Refuel. Area Exhaust Monitors - Upscale (1) Once/3 months .Once/ day
- 2) Refuel Area Exhaust Monitors - Downscale (1) Once/3 months Once/ day t_ogic_ System Functional Test (4) (6) Frequency I) Reactor Building Isolation- Once/6 months
'2) Standby Gas Treatment System Actuation Once/6 months f
. Amendme'nt No'. - 89' 64
F , . . , ,
'm i
4.2 MSES (Cont'd) !
p The automatic pressure relief instrumentation can be considered to be a l 1 out of 2 logic system and the discussion above applies also. j The instrumentation which is required for the recirculation pump trip l '
and alternate rod insertion systems incorporate analog transmitters. j The transmitter calibration frequency is once per refueling outage, l which is consistent with both the equipment capabilities and the ~'
i requirements for similar equipment used at Pilgrim. The Trip Unit Calibration and Instrument functional Test is specified at monthly, !
which is the same frequency specified for.other similar protettive devices. An instrument check -is specified at once per day; this is considered to be an appropriate frequency, commensurate with the design l 1911 cations and the fact that the recirculation pump trip and alternate !
insertion systems are backups to existing protective instrumentation. >
,m ,-m y " N . / % , / ~ % /" % ,r ,_ '
() .
's
- . , :L
/
f
, / .
[
f t
.i
?
Revision 124 i Amendment hc. 42, 121 77
+ - . - -n, , .