Proposed Tech Specs,Changing Tables 4.2.A,4.2.B,4.2.C & 4.2.D Re Logic Sys Functional Testing
ML20012C448
Person / Time
Site: Pilgrim
Issue date: 03/08/1990
From:
BOSTON EDISON CO.
To:
Shared Package
ML20012C447 List:
References
NUDOCS 9003210304
Download: ML20012C448 (12)


Text

. .

C '

e .

ATTACHMENT B PROPOSED CHANGE-TO LSFT INTERVALS REVISED TECHNICAL SPECIFICATION PAGES 60. 62, 63. 64, and 77 900314 90032103g(

DR ADO 0500g9

3 PNPS TABLE 4.2.A -

MINIMUM TEST AND CALIBRATION FRE00ENCY FOR PCIS -

Instrument Channel (5) Instrument Functional Test Calibration Frecuency Instrument Check

1) Reactor High Pressure (1) Once/3 months None
2) Reactor Low-Low Hater Level (1) (7) (7) Once/ day
3) Reactor High Hater Level (1) (7) (7) Once/ day
4) Main Steam High Temp. (1) Once/3 months None
5) Main Steam High Flow (1) (7) (7) Once/ day
6) Main Steam Low Pressure (1) (7) (7) Once/ day
7) Reactor Mater Cleanup High Flow ~ (1) Once/3 months Once/ day
8) Reactor Water Cleanup High Temp. (1) Once/3 months None Loaic System Functional Test (4) (6) Frecuency
1) Main Steam Line Isolation Vvs. Once/18 months Main Steam Line Drain Vvs.

Reactor Hater Sample Vvs.

2) RHR - Isolation Vv. Control Once/18 months Shutdown Cooling Vvs.

Head Spray Discharge to Radwaste

3) Reactor Water Cleanup Isolation Once/18 months
4) Drywell Isolation Vvs. Once/18 months TIP Withdrawal Atmospheric Control Vvs.

Sump Drain Valves

5) Standby Gas Treatment System Once/18 months Reactor Building Isolation Amendment No. 107 60

~

PNPS -

TABLE 4.2.B MINIMUM TEST AND CALIBRATION FRE00ENCY FOR CSCS Loaical System Functional Test (4) (6) Frecuency Remarks

1) Core Spray Subsystem Once/18 months
2) Low Press. Coolant Injection Subsystem Once/18 months
3) Containment Spray Subsystem Once/18 months
4) HPCI Subsystem Once/18 months
5) HPCI Subsystem Auto Isolation Once/18 months
6) ADS Subsystem Once/18 months
7) RCIC Subsystem Auto Isolation Once/18 months
8) Diesel Generator Initiation Once/18 months
9) Area Cooling for Safeguard System Once/18 months 62

PNPS TABLE 4.2.C '

MINIMUM TEST AND CALIBRATION FRE0VENCY FOR CONTROL R0D BLOCKS ACTUATION Instrument Channel Instrument Functional Calibration Instrument Check 1Rit APRM - Downscale (1) (3) Once/3 Months Once/ Day APRM - Upscale (1) (3) Once/3 Months Once/ Day APRM - Inoperative (1) (3) Not Applicable Once/ Day IRM - Upscale (2) (3) Startup or Control Shutdown (2)

IRM - Downscale (2) (3) Startup or Control Shutdown (2)

IRM - Inoperative (2) (3) Not Applicable (2)

RBM - Upscale (1) (3) Once/6 Months Once/ Day RbH - Downstale (1) (3) Once/6 Months Once/ Day RBM - Inoperative (1) (3) Not Applicable Once/ Day SRM - Upscale (2) (3) Startup or Control Shutdown (2)

SRM - Inoperative (2) (3) Not Applicable (2)

SRM - Detector Not in Startup Position (2) (3) Not Applicable (2)

SRM - Downscale (2) (3) Startup or Control Shutdown (2)

IRM - Detector Not in Startup Position (2) (3) Not Applicable (2)

Scram Discharge Instrument Volume Once/3 Months Refuel Not Applicable Water Level-High Scram Discharge Instrument Once/3 Months Not Applicable Not Applicable Volume-Scram Trip Bypassed Recirculation Flow Converter Not Applicable Once/ Cycle ,

Once/ Day Recirculation Flow Converter-Upscale Once/3 Months Once/3 Months Once/ Day Recirculation Flow Converter-Inoperative Once/3 Months Not Applicable Once/ Day Recirculation Flow Converter-Comparator Once/3 Months Once/3 Months Once/ Day Off Limits Recirculation Flow Process Instruments Not Applicable Once/ Cycle Once/ Day Locic System Functional Test (4) (6)

System Logic Check Once/18 Months Amendment No. 110 63

PNPS .

TABLE 4.2.0 '

MINIMUM TEST AND CALIBRATION FRE00ENCY FOR RADIATION MONITORING SYSTEMS Instrument Channels Instrument Functional Calibration Instrument Check (2) 191t

1) Refuel Area Exhaust Monitors - Upscale (1) Once/3 months Once/ day
2) Refuel Area Exhaust Monitors - Downscale (1) Once/3 months Once/ day Loaic System Functional Tesi (4) (6) Frecuency
1) Reactor Building Isolation Once/18 months
2) Standby Gas Treatment System Actuation Once/18 months Amendment No. 89 64

4.2 BASES (Cont'd)

The automatic pressure relief instrumentation can be considered to be a 1 out of 2 logic system and the discussion above applies also.

The instrumentation which is required for the recirculation pump trip and alternate rod insertion systems incorporate analog transmitters.

The transmitter calibration frequency is once per refueling outage, which is consistent with both the equipment capabilities and the requirements for similar equipment used at Pilgrim. The Trip Unit Calibration and Instrument Functional Test is specified at monthly, which is the same frequency specified for other similar protective devices. An instrument check is specified at once per day; this is considered to be an appropriate frequency, commensurate with the design applications and the fact that the recirculation pump trip and alternate rod insertion systems are backups to existing protective instrumentation.

A logic system functional test interval of 18 months was selected to minimize the frequency of safety system inoperability due to testing and to minimize the potential for inadvertent safety system trips and their attendant transients. Based on industry experience and BWR Standard Technical Specifications, an 18 month testing interval provides adequate assurance of operability for this equipment.

1 Amendment No. 42, 127 77

.j a

ATTACHMENT C 1 i

PROPOSED CHANGE TO LSFT INTERVALS  !

1 i

i

' MARKED-UP TECHNICAL SPECIFICATION l PAGES 60, 62. 63, 64, and 77 1

_+

l 1

-[ ,

.I I f

[

4 i

f i

i i

-i h

l k t

t

.s

.I h

p
i. :I t

l-

.. g PNPS TABLE 4.2.A MINIMUM TEST AND CALIBRATION FREQUENCY FOR PCIS Instrument funclip_n31 Test Calibratipn Frequency Instrupent_ Check IR$trume_nt_ Channel _151 Once/3 months None l

1) Reactor High Pressure (1) Once/ day (1) (7) (7)
2) Reactor Low-Low Hater Level (7) Once/ day

'3) Reactor High Water Level (1) (7)

Once/3 months None

4) Main Steam High Temp. (1)

(1) (7) (7) Once/ day

5) Main Steam High Flow (7) Once/ day
6) Main Steem Low Pressure (1) (7)

(1) Once/3 months Once/ day

7) Reactor Water Cleanup High Flow Once/3 months None
8) Reactor Hater Cleanup High Temp. (1) fr_equfncy LO91 C_ System Fullc_tional Tes_t (4) (6) _ ,m Once/6 monthsa;
1) Main Steam Line Isolation Vvs. __/

Main Steam Line Drain Vvs.

Reactor Hater Sample Vvs. reew Once/6 months"i

2) RHR - Isoiation Vv.. Control v-Shutdown Cooling Vvs.

Head Spray Discharge to Radwaste _ _.g

.3) Reactor Water Cleanup Isolation Once/6 months)I Once/6 months";'

4) Drywell Isolation Vvs. y TIP Withdrawal.

Atmospheric Control Vvs. _

Sump Drain Valves .

Standby Gas Treatment System Once/6monthsb .

5)- j Reactor Building Isolation 60 Revision 110' i

r o , , ,

, s - ,

TNPS .

TABIE Is.2.B .

MININUM TEST AND CALIDRATION F If4UENCY FUR CSCS -

Logic System Fitnetional Test (Is) (6) Trev ency Emarks

1) Core Spray Subsysten e/6 month
2) Ier Press. Coolant Injection Subsystem Once/6 months

= -

3,4 Containment Spray subsystem Once/6 months Is) H MI Subsystem

- Once/6sonths

5) HNI Subsystem Auto Isolation f M ~ i nee /6 ,
6) AD3 Subsystem f Once/6anonths '
7) RCIC Subsystem Auto Isolation Once/6sentheb) j .

- 8) Diesel Generator Initiation Once/6monthsh~ l

9) Area Cooling for Safeguard System nee /6 months ;

/

e

    • H b

k J '

/

' ~

PNPS TABLE 4.2.C MINIMUM TEST AND_CA_LIBRATION FRUJJENCY__FOR_ CONTROL _ ROD _ BLOCKS _ ACTUATION Instr _ument_ Channel Insfrument Funcflonal Calibration Instr _Ument_Chett

_ Test APRM - Downscale (1) (3) Once/3 Months Once/ Day (1) (3) Once/3 Months Once/ Day APRM - Upscale APRM - Inoperative (1) (3) Not Applicable Once/Da'y IRM - Upscale (2) (3) Startup or Control Shutdown (2)

IRM - Downscale (2) (3) Startup or Control Shutdown (2)

IRM - Inoperative (2) (3) Not Applicable (2)

RBM - Upscale (1) (3) Once/6 Months Once/ Day RBM - Downscale (1) (3) Once/6 Months Once/ Day RBM - Inoperative (1) (3) Not Applicable Once/ Day SRM - Upscale (2) (3) Startup or Control Shutdown (2)

SRM - Inoperative (2) (3) Not Applicable (2)

SRM - Detector Not in Startup Position (2) (3) Not Applicable (2)

SRM - Downstale (2) (3) Startup or Control Shutdown (2)

IRM - Detector Not in Startup Position (2) (3) Not Applicable (2)

Scram Discharge Instrament Volume Once/3 Months Refuel Not Applicable Water Level-High Scram Discharge Instrument Once/3 Months Not Applicable Not Appilcable Volume-Scram Trip Bypassed Recirc:llation Flow Coaverter Not Applicable Once/ Cycle Once/ Day Recirculation Flow Converter-Upscalc Once/3 Months Once/3 Months Once/ Day Recirculation Flow Converter-Inoperative Once/3 Months Not Appilcable Once/ Day Recirculation flow Converter-Comparator Once/3 Months Once/3 Months Once/ Day Off Limits Recirculation Flow Process Instruments Not Applicable Once/ Cycle Once/ Day LoSI C_Syltem_Eunctional Teit_(4) (6)  %

System logic Check Once/6 Months /

Revision 113 63 1

PNPS

  • TABLE 4.2.0 MINIMUM TEST AND CAL 78 RATION FREQUENCY FOR RADIATION MONITORING SYSTEMS Instrument Channcis Instrument Functional Calibration Instru. - Check (2)

---.-.me_.nt -

I) Refuel. Area Exhaust Monitors - Upscale (1) Once/3 months .Once/ day

2) Refuel Area Exhaust Monitors - Downscale (1) Once/3 months Once/ day t_ogic_ System Functional Test (4) (6) Frequency I) Reactor Building Isolation- Once/6 months

'2) Standby Gas Treatment System Actuation Once/6 months f

. Amendme'nt No'. - 89' 64

F , . . , ,

'm i

4.2 MSES (Cont'd)  !

p The automatic pressure relief instrumentation can be considered to be a l 1 out of 2 logic system and the discussion above applies also. j The instrumentation which is required for the recirculation pump trip l '

and alternate rod insertion systems incorporate analog transmitters. j The transmitter calibration frequency is once per refueling outage, l which is consistent with both the equipment capabilities and the ~'

i requirements for similar equipment used at Pilgrim. The Trip Unit Calibration and Instrument functional Test is specified at monthly,  !

which is the same frequency specified for.other similar protettive devices. An instrument check -is specified at once per day; this is considered to be an appropriate frequency, commensurate with the design l 1911 cations and the fact that the recirculation pump trip and alternate  !

insertion systems are backups to existing protective instrumentation. >

,m ,-m y " N . / % , / ~ % /" % ,r ,_ '

() .

's

- . , :L

/

f

, / .

[

f t

.i

?

Revision 124 i Amendment hc. 42, 121 77