05000280/LER-1981-057-03, /03L-0:on 810827,circuit Breaker for Motor Operated Valve Found Open.Caused by Accidental Bumping. Breaker Reclosed & Appropriate Valve Indication Ack

From kanterella
(Redirected from ML20010H727)
Jump to navigation Jump to search
/03L-0:on 810827,circuit Breaker for Motor Operated Valve Found Open.Caused by Accidental Bumping. Breaker Reclosed & Appropriate Valve Indication Ack
ML20010H727
Person / Time
Site: Surry  
Issue date: 09/22/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010H722 List:
References
LER-81-057-03L-02, LER-81-57-3L-2, NUDOCS 8109290218
Download: ML20010H727 (2)


LER-1981-057, /03L-0:on 810827,circuit Breaker for Motor Operated Valve Found Open.Caused by Accidental Bumping. Breaker Reclosed & Appropriate Valve Indication Ack
Event date:
Report date:
2801981057R03 - NRC Website

text

F p.:n.)

c. : uu:Lt An at :v; A sm : r.u. :r.::.

'_ICENSEE EVENT EES:7

.m

0A* EO. E. L.'

t*LE ASE *RIN* 05 TYPE ALL RE CLi4ED N E ort.iATION *

<Q i

v'At E

?

I: 2 i3' O C:

f O! 0' 01 C; O' -i O' 0 l@i 4 11 11 I l i l lQi I

!?

7 fi.:..u.

.i:ar.n w.=ees a

.ict Nu

.s u

  • i a: u"-

,";% !1 Q;; 0 ? 5!01010'218:1 @ 018'2 !? 18 11 lp 01 912 12 18 !1i@

~

i t.

6' 3C:KF NVVggs N

6) 3,Pg? CATI la 76 REPORTLATi E.

IvE : des:me-Or. Anr==otAc. Or*::!:cEN:II 9 v

[

Uith thE unit at 100*. steadv state power. a routine control board walkdowr re-ve:J ed the circuit creaker for MOV-2867E (BIT inlet) to be open. The breaker hac:

beer. verified closed six hours earlier. This event is contrary to T.S.-3.3.A.7 I

and reportable pe: T.S.-6.6.2.b.(2).

The redundant flow path was verified opere-1

];

ble: therefore, the health and safety of the public were not affected.

I 1I i

]1 l

Sw!?f y CA.'5 E

CAUSE

C DV P.

watvt COct COct SUE ODE COwPpNE NT CODE SUB0001 SUE ODE

]

!s IF l@ I A l@* lE l@ IC IK IT I Bl Rl Klh l A l@ lZ l@

g 10 1:

12 II 1t 2:

SE CL;E NTI AL C 0URRENCI R5eoRT R E V!SION gg asq3.} { VL N w( AS REPORT NQ.

CODE TYP!

N O, O "a s * = t !8 !1 I l-l

!0 15 17 I lel 10 13 I lL l l-l i 10 :

""5LF

=

b a

a

s 2,

x

.: 1o

,U L.n

...E:-

.c==

.-Ac~,e

~..o

..I 3...

uaNuse:Tuata

=co. ~,,e axfN A:*1 Ct.

CN Pi.Ar.i METNO:

MOURS SUBui TE:

7 0Ru nut.

$Us* Lira l X I@uHIg lZlg I Z j@

e a,

a a

a c

i 10 10 10 t l

l Ylg l Nlg lA lg l C [7 l7 10lg

.s CAUSE DESCAl* TION AND CORRECTIVE AO'710Ns,

c

]I The breaker is located in an area where entensive design chance was being undertaken. !

]I It is therefore likely that the breaker was accidentally bumped, thus causing it to _I

]

open. The breaker was reclosed and appropriate valve indication was acknowledged.

I

]l The number of construction personnel authorized access to the switchgear room has been!

]I reduced.

I a,

p a= LtTv wETWCD of sTATU$

%POWE8 CT* E R STATUS DISCOVf **

DIS UVERY DESCRePTION

] l E l@ l 11010 l@l N/A l

l B l@! Rout;ne Inspection

]

.9 1C 13 4.

ag

. d6 8

ACTiv1Tv CON TI N~

RELEastp 08 RELIMI Av0Vs T of ACTivlTY LCCATION of RELE A$E

] I Z l @ l Z l@l N/A l

l U/A l

u

,e v

u e

a:

  • 1R50NNEL E8 *05vpE3 m

NU?AEf 8 YP' CES:RIPTION QI i 101010 l@'Z l@!

l M/A I

s u

=

u 8 t R 5Ct.N E. AA;2 i E5 g

vuesE n

t::miri:NQj l 010 : 0 l@!

N/A I

e Cs Op Cav.G3 i s A*:p?w @d

.01:

7**E C E LO R e8 TION I Zl@!

N/A l

3 7'"Sts:..,:,.@

t at USE Ce 33i@i N/A I

Ii i il I!I 1 '!! l3 i Nl i0109290218 P10922 58 55 5: I

- PDR ADOCK 05000280

.I.

1,. Vi3 son

, ~...~

(804) 357-3184 c6 PDR

o ATTACHMEKI 1 SURRY POWER STATION. UNIT 2 DOCKET NO:

50-261 REPORT NO:

El-O',7 / 03L-0 EVENT PATE:

GE-27 -81 MOV-2867B BREAKER OPEN 1.

EVENT DESCRIPTION

With the unit at 100% power, a routine walkdown of the control board revealed the circuit breaker for MOV-2867B (Beron Injection Tank Inlet) to be oper..

These breakers had been verified closed 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> earlier while performing the control board indicating light walk-down. The redundan flow path was checked to ensure it was energized.

This event is contrary to T.S.3.3.A.7 and reportable in accordance with T.S.6.6. 2.b (2).

2.

PROBABLE CONSEQUENCES AND STATUS OF REDUNDANT EQUIPME'iT:

Upon receipt of a safety injection, signal, the BIT valves are automatically opened and the BIT contents are pumped into the RCS by the High Head Safety Injection Pumps. The redundant BIT flow path, MOV-2867A, was operable through-out this event; therefore, the health and safety of the public were not affected.

3.

CAUSE

The breaker is located in an area where extensive design change activity was unuerway.

It is likely that the breaker was accidentally bumped, causing it to open.

4.

IMMEDIATE CORRECTIVE ACTION

The breaker was closed and the valve responded properly.

5.

SUBSEQUENT CORRECTIVE ACTION:

None required.

6.

ACTIONS TAKEN TO PREVENT RECURRENCE:

The number of construction personnel authorized access to the switchgear room has been reduced.

7.

GENZPIC IMPLICATIONS:

None.