05000280/LER-1981-049-03, /03L-0:on 810730,review of Test Program Revealed Sensitized Pipe Supplied by Containment Spray Pump 2-CS-P-1A Was Being Flushed for Less than Min Time Required.Caused by Inadvertent Change of Flush Time for Pump Piping

From kanterella
(Redirected from ML20010E824)
Jump to navigation Jump to search
/03L-0:on 810730,review of Test Program Revealed Sensitized Pipe Supplied by Containment Spray Pump 2-CS-P-1A Was Being Flushed for Less than Min Time Required.Caused by Inadvertent Change of Flush Time for Pump Piping
ML20010E824
Person / Time
Site: Surry  
Issue date: 08/24/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010E818 List:
References
LER-81-049-03L-02, LER-81-49-3L-2, NUDOCS 8109080296
Download: ML20010E824 (2)


LER-1981-049, /03L-0:on 810730,review of Test Program Revealed Sensitized Pipe Supplied by Containment Spray Pump 2-CS-P-1A Was Being Flushed for Less than Min Time Required.Caused by Inadvertent Change of Flush Time for Pump Piping
Event date:
Report date:
2801981049R03 - NRC Website

text

NEC DORM 366 U.S. NUCLEA;l REGuLAToRv COMMISSION l7 M1 LICENSEE EVENT REPORT coNTRoistocc I I

I I

I I

l@

mLEASE PRINT 02 TYPE ALL REQUIRED IN7oIMATioN) i E

!c itl IVI Al S1 Pi Sl 2l 01 01 -l 01 01 01 01 01 -l O! 0 l@ 4 11 1111 l 1 l@l I j@

& 6 uC1NSEE COpt 14 5

uC8NSE NUMSER 25 26 uCENSE Typt Jo 67 T.A7 &&

OON" 0 97 ; 3 l 0; 8) 1 ]@l01 8121418l1]@

+s g [L l@l 01 51 01 01 01 21 811 l@l 6

6C 61 GCCICET NUM9 Em 84 69 EVENT C'ATI 14 75 REPORT DATE SC EVE *C DESCRIPTICN AND '936ABLE CONSEOUENOES Oso

,c,,,j A station review of the adequacy of the Periodic Test program disclosed that the

, ; sensitized pipe f rom containment spray pump 2-CS-P-1 A'was being flushed for less than ;

lo e q 9 the minimum time required by Technical Specification 4.1.E, table 4.1-3B.

Periodic l

ieisI L est 17 1 called for a 15 minute flush instead of 20 minutes as required by T.S.

]

T rZ ! This is cont rary to T.S.4.1.E and reportable per T.S.6.6.2.b. (3).

Since the redundant 1 lei?l l piping was correctly flushed and all post-flush samples were satisfactory, the healthI g3,, ; ; and safety of the public were not affected.

1 80 7

8 9 sNb t

cE Sue DE CDMPONENT CODE SusCcDE loisl lS l Hl@ l D j@ l Z l@ l PlI lP IE IX lX l@ lC j@ Q @

7 8

9 10 11 12 13 18 19 20 EQUENTIAL Omm RENCE mEPomT mtytstoN LEmim EVENT YEA R MEPOMT NO.

CODE WPE NC.

@ *asao=ou"*5"

_li8 l1 l l_l [014l9l

]/l l0 l3 l lL l l-l l0 l T

a

=

2 2.

7

=

=

3a si n

N A QN P

N*

M MOUR. 22 s SMITT 80 8.

MAN sA mEm l G gj Z lg l5Z lg l5Zl@

l. 01 0l 0 l _j gg l N]g lA l@

l G l 2 l 5 17 l@

33 34 3

3 37 4C di 42 43 de 47 cAuSE DESORIPTION AND CORRECT 1Vf ACTIONS @

j

,3,o;;The incorrect flush time in PT-17.1 was due to a procedure change that was intended tol i,,3,; change the flush time on pump 2-CS-P-1B from 20 minutes to 15 minutes.

Inadvertent 1v.I l

phe flush times for both pumps were changed to 15 minutes. The periodic test was 1

,7,

,,,3, l corrected.

I I

lital1 so 2

A

% POWER CTMERsTATUS t

Em DISCOVERY DESCRIPTION io l W@ l1 1010 l@l N/A l

l A l@l Engineers Observation l

ii i:

o

.o

. j,,,,,

,ga,,,

N/A l

N/A ~ Location o, saA @

AMOUNT o, AcmrTv @ l uuAsie e, =suAs l

li 6sI l Zl@ l Zlg 7

8 9 to da 46 80 PERSONNEL EXPC5JREb NUMSER TYPt DESORt# TION jii,j l 0 l 0 } 0 l@l Z l@l N/A l

pensoNNEUNEdits tsemimoN@

N/A NvMsen l

[1 Ia l l 01010 l@l so 7

a9 is i:

LCSS 08 CM DAMAGE TQ FACILITv lt 19ll7 @l

~

N/A Tvet des:mirTio*

l sc a 9 to Pusue:Tv Ah NRC USE ONLY 1:!ofiNlhl I

IIIIIIIIII IIl tssure ers=imo* C N/A I

68 89 40 E 7

g 9 to (804) 357-3184 J. L. Wilson

. c s.

SAuge

..s.4,s.

8109080296 810824 PDR ADOCK 05000280 PDR S

y ATTACHMENT 1 SURRY POWER STATION. UNIT 2 DOCKET NO:

50-281 REPORT NO:

81-049/03L-0 EVENT DATE:

07-30-81 TITLE OF THE EVENT:

ERROR IN FLUSHING PT 1.

DESCRIPTION OF EVENT

A station review of the adequacy of the Feriodic Test program disclosed that the ' sensitized pipe supplied by containment spray pump 2-CS-P-1 A was being (flushed for less than the minimum time required by T.S. table 4.1-3B.

Periodic Test 17.1 called for a 15 minute flush, while the Technical Specification requi res a 20 minute flush. This incorrect procedure was used for the monthly flushes from Septmenber 1980 to July 1981. This event is contrary to T.S.4.1.E and reportable per T.S. 6.6.2.b.(3).

2.

PROBABLE CONSEQUENCES AND STATUS OF REDUNDANT SYSTEMS:

The flushing duration requirements of Table 4.1-3B ensure that a volume of water greater than that contained in the stagnant flow paths will be flushed in order to ensure that buildup of contaminants will not occur, thus reducing the potential for stress corrosion cracking.

In addition, the Technical Specifi-cation requires sampling of the flushed lines to demonstrate the effectiveness of the flushing in removing contaminants.

A review of the Periodic Test results for the months in which the short flushes werc performed has verified that the post-flush fluoride and chloride concentrations were within the acceptance criteria, indicating that the flushes were effective.

In addition, the redundant containment spray piping was flushed correctly.

Therefore, the cor.tainment spray system would still have performed its intended function following an accident, and the health and safety of the public were not affected.

3

CAUSE

The incorrect flush time was due to an inadvertent change to the Periodic Test flush time for pump 2-CS-P-1A piping. The change to the test procedure had on'y been intended to change the flush time for pump 2-CS-P-1B piping.

4.

IMMEDIATE CORRECTIVE ACTION

A request:,to change Periodic Test 17.1 was submitted.

5.

SUBSEQUENT CORRECTIVE ACTION:

The Periodic *.est was corrected.

6.

ACTION TAKEN TO PREVENT RECURRENCE:

The flushing Periodic Tests were reviewed to ensure that all other flush times were in accordance with the Technical Specifications.