ML20010E544

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-219/81-14 on 810701-0803 & Notice of Violation
ML20010E544
Person / Time
Site: Oyster Creek
Issue date: 08/21/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Phyllis Clark
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20010E545 List:
References
NUDOCS 8109040241
Download: ML20010E544 (2)


See also: IR 05000219/1981014

Text

- - _ . , .

_ ..-

- - -

_ _ - - - - _ _

- - _ .

_ . _ . . _ _

_ _ - - - - .

__

m

--

-

v

AUG 2 FINI

Docket No. 50-219

b

s

Jersey Central Power and Light Company

'/J

2 [AO #

  1. )

t

ATTil: Hr. Philip R. Clerk

G7

Vice President - Nuclear

'

GPU Nuclear

-

3

100 Interpace Parkway

g,

SEP 0 31981M

.

Parsippany,tiew Jersey

07054

p

,

'

Gentlemen:

O

&

Subject:

Inspection 50-219/81-14

N

as

i

This refers to the routine safety inspection conducted by Mr. J. Thomas of this

office on July 1 - August 3,1981 at the Oyster Creek Nuclear Generating Station.

Forked River, flew Jersey of activities authorized by NRC License No. DPR-16 and

to the discussions of our findings held by Mr. Thomas with Mr. J. Carroll and

other members of your staff periodically during, and at the conclusion of the

,

inspection.

'

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of non-

compliance brought to your attention in the enclosure to our letter dated May 29,

1981. We have no further questions regarding the steps you took to correct item

G.

Based on the results of this inspection, it appears that certain of your activi-

i

'

ties were not conducted in full compliance with liRC requirements as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

These items of noncom-

pliance have been categorized into the levels described in the Federal Register

llotice (45 FR 66754) dated October 7, 1980. You are required to respond to this

letter and in preparing your response, you should follow the instructions in

Appendix A.

In addition to the need for corrective action regarding these

specific itens of noncompliance, we are concerned about the implementation of

i

lc

your management control systems that permitted them to occur. Consequently, in

L

yourrreply, you should describe in particular, those actions taken or planned

to improve the effectiveness of your management control syster:s.

R DRPI

RI:DRPI

RI

PI

RI:DRP

}

+senman

,

Gr

X

Bru ner

l

omas/meo

ffli

$f

W

l l0

i

!

g% fog

0FFICIAL RECORD COPY

p

a

-

- - - -

-

-

-

"

)

. -- s

IE

Jersey Central Power and Light

2

Company

In accordance with 10 CFR 2.790 of the Consnission's regulations, a copy of this

i

letter and the enclosures will be placed in the NRC's Public Document Room.

!

If this report contains any information that you (or your contractors) believe

i

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you

'

(a) Notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

l

within 25 days frcin the date of this letter a written application to this office

,

'

to withhold such information. Consistent with section 2.790(b)(1), any such

application mJst be accompanied by an affidavit executed by the owner of the

informatien which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons on the basis which it is claimed

that the information should t'e withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4).

.a infonnation sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Documeht Room. The telephone notification

of your intent to request withhclding, or any request for an ertsnsion of the

10 day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Sincerely,

bl /&%'

ta/> ora.d

Eldon J. Brun//ner, Acting Director

Division of Resident and Project

Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Nunber 50-219/81-14

cc w/encis:

M. Laggart, Licensing Supervisor

J. Knubel, BWR Licensing Manager

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Jersey

+

i

NRC Resident Inspector

!

bec w/encls:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

I

!

~

j

f

.

..

-

.

0FFICIlL B Cl6%6LtMD