Forwards IE Insp Rept 50-206/81-24 on 810601-0701,notice of Violation & Notice of Deviation
ML20010B926
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/31/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20010B927 List:
References
NUDOCS 8108180485
Download: ML20010B926 (2)


See also: IR 05000206/1981024

Text

_-

~

-

-

_

,

%

y

s

%

j'

,

r

,

,.

ya31.BM

Docket No. 50-206

o3

ce

<

-

r

Southern California Edison Company

D

9

-

P. O. Box 800

2244 Walnut Grove Avenue

O Auc 1'71981 >

-

m y

Rosemead, California 91770

9, ,,m>wruim

s-

Attention:

Dr. L. T. Papay

4

/

Vice President, Advanced Engineering

to

to

Gentlemen:

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Mr. L. Miller of this office on

June 1 - July 1,1981, of arMyities authorized by NRC License No. DPR-13,

and to the discussion 6f our findings held by Pr. Miller with Mr. Curran

and other representatives of the Southern California Edison Company at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and obser-

vations by the inspectors.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201, of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.2.01 requires you to submit to this office within thirty (GO) days

of your receipt of this notice, a written statement or explanation in reply

including (1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further violat4ons;

and (3) the date when full compliance will be achieved. Consiferation may be

given to extending your response time for good cause shown.

i

During this inspection, it was also found that one of your activities appeared

to deviate from generally accepted industry standards, as set forth in the

Notice of Deviation enclosed herewith as Appendix B.

Please submit to this

office, within thirty (30) days of your receipt of this notice, a written

statement or explanation in reply including the cause of the deviation and

[

.

t

4

3

omes) ,RV:g

l

\\ '

I

suanaur) _ . M. .i l.l . . .

.J. .. L. . . .C. .r.e. .w. s.81081e0485 810731

"'

"

'

'" '

PDR ADOCK 03000206

. . . .

...

.

'

'

'

o^"> 7.

./.81

7./J.(//. 8.1.. . .

PDR

0

. . . ~

.

~.. .

.

..

..

.

..

. .

. ..... .. . . .. ... .. .. .

nac - eiosoisacuc2d

.. . . , ,, . ,, ,, ....

,, ,,, , ,,,

,,, ,,

_ OFFICIAL RECORn mov

- ----

, , , ,

-

_

Southern California Edison Company

-2-

JUL 311981

the steps you plan to take to assure timely implementation and completion of

corrective actions. Your written reply should include the date(s) hhen your

corrective action (s) were or will be completed.

In accordance with 10 CFR 2.790 of the Corsnission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any infomation that you believe

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit within

25 days from the date of this letter a written application to this office to

withhold such infomation.

If your receipt of this letter has been delayed such

that less than seven (7) days are available for your review, please notify this

office promptly so that a new due date may be established. Consistent with

section 2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

sought to be withhild, and which contains a full statement of the reasons on the

basis which it is claimed that the infomation should be withheld from public

disclosure. This section further requires the statemt nt to address with specifi-

city the considerations listed in 10 CFR 2.790(b)(4). The infomation sought to

be withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we ddonot hear from you in this regard within the specified

periods noted above, the report will be placed in the PuBlic Document Room.

Should you have any questions concerning this inspection, ce will be glad to

'

discuss them with you.

Sincerely,

Dozd sigra: tt

f. B. CitWs /

J. L. Crews, Chief

Reactor Operations Projects Branch

Enclosures:

1. Notice of Violation - Appendix A'

2. Notice of Deviation - Appendix B

3. IE Inspection Report

NO. 50-206/81-24

cc w/o dnclosure 3:

Sent to DMB for DCS processing

t'r. R. Dietch, Vice President

Nucleae Engineering & Operations, SCE