ML20010A935

From kanterella
Jump to navigation Jump to search
Model Tech Spec 3/4.8.2 Re Onsite Power Distribution Sys, Electric Power Monitoring for Reactor Protection Sys
ML20010A935
Person / Time
Site: Oyster Creek
Issue date: 08/03/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20010A934 List:
References
NUDOCS 8108130140
Download: ML20010A935 (1)


Text

O ELECTRICAL. POWER SYSTEMSL 3/4.8'.2 ONSITE POWER DISTRIBUTION SYSTEMS ELECTRIC POWER MONITORING FOR REACTOR PROTECTION SYSTEM LIMITING CONDITION FOR OPERATION 3.8.2.7 The power monitoring system for the in service-RPS MG set or Alternate Source shall be.0PERABLE.

APPLIC.ASILITY:

CONDITIONS 1 and 2.

ACTION:

With the power monitoring system for the in service RPS MG set or Alternate Source inoperable, restore the inoperable power monitoring system to OPERABLE status within 30 minutes or remove the RPS MG set or Alternate Source associated with the inoperable power monitoring system from service.

One channel of a power monitoring system may be inoperable, as necessary for test or maintenance, not to exceed 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> / month.

SURVEILLANCE REQUIREMENTS 4.8.2.7 The above specified RPS power monitoring system instrumentation shall be determined OPERABLE:

At least once per six months by performing a CHANNEL FUNCTIONAL TEST; a.

and b.

At least once per operating cycle by demonstrating-the OPERABILITY' of over-voltage, under-voltcge and under-frequency protective instrumentation by performance of a CHANNEL CALIBRATION including simulated automatic actuation of the protective relays, tripping logic and output circuit breakers and verifying the following setpoints.

1.

Over-voltage f

VAC, 2.

Under-voltage >

VAC, and 1

3.

Under-frequency >.

Hz.

8108130:140 810903 i PDR AD(>CK 05CMDo219 ip PDR Enclosure-(2)

PN