Text
__
-~
l 4
~.
3 August 3, 1981 DISTRIBUTION:
Docket No. 50-219 RFell LS05-81-08-010 NRC PDR JVanVliet LPDR Gray File TERA SScott Mr. I.R. Finfrock, Jr.
- 5 RF D
Vice President - Jersey Central Glainas Power and Light Company DCrutchfield 6[ k Oyster Creek Nuclear Generating JLombardo
- k Station HSmith O
Post Office Box 388 OELD Forked River, flew Jersey 08731 OI&E (3) 6 M
G
/
Dear !!r. Finfrock:
4, 4
SUBJECT:
REACTOR PROTECTION SYSTEM (RPS) POWER IRIITORING SYSTEll' DESIGN MODIFICATION, MULTIPLANT ACTION NO. C-ll By letter dated December 4,1980, you advised us that you are planning to use an approved General Electric design for the subject modification and would not, therefore, be submitting design information per our request 24,1980. Since the evaluation of these design modifications of September is being conducted on a plant-specific basis, an appropriate submittal is required for Oyster Creek. to this letter identifies the Enclosure design information needed by the staff to complete its review.
2 consists of mode' Technical Specifications.
We request that you provide within 60 days of your receipt of this letter your schedule for submission of the specified design information.
This request for information was approved by OMB u. der clearance number 3150-0011 which expires September 30, 1981. Comnents on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Ey.ecutive Office Building, Washington, D. C.
20503.
Submittal of your proposed Technical Specifications, to which you have previcusly comitted, should be in the form of a request for approval of a license amendment accompanied by an appropr'. to fee.
Thank you for your cooperation.
Orisi s'isn'dDT '
kD Oh0009 Dmis M. WOM f
I DO Dennis H. Crutchfield, Chief P
PDR Operating Reactors Branch #$
Division of Licensing J
i i
i I
Mr. I. R. Fi nfrock, J r. August 3, 1981 cc w/ enclosures:.
G. F. Trowbridge,. Esquire Gene Fisher
.Shaw, Pittman, Potts and Trowbridge Bureau Chief 1800 M Street, N. W.
Bureau of Radiation Protection Washington, D. C.
20036 380 Scotts Road Trenton, New Jersey 08628
- J. B. Lieberman, Esquire Berlack, Israels & Lieberman Comissioner 26 Broadway New Jersey Department of Energy New York, New York 10004 101 Comerce Street Newark, New Jersey 07102 Natural Resources Defense Council 91715th Street, N. W.
Licensing Superv.isor Washington, D. C.
20006 Oyster Creek Nuclear Generating Station J. Knubel P. O. Box 388 BWR Licensing Manager Forked River, New Jersey 08731 Jersey Central Power & Light Cogany Madison Avenue at Punch Bowl Road Resident Inspector Morristown, New Jersey 07960 c/o V. S. NRC P. O. Box 445 Joseph W. Ferraro, Jr., Esquire Forked River, New Jersey
- 08731 Deputy Attorney General.
State of New Jersey.
Department of Law and Public Safety 1100 Raymond Boulevard Newark, New Jersey 07012 Ocean County Library -
Brick Township Branch 401 Chambers Bridge Road Brick Town, New Jersey 08723 Mayor
' Lacey Township P. O. Box 475 Forked River, New Jersey 08731 Comissioner Department of Public Utilities State of New Jersey 101 Comerce Street Newark, dew Jersey 07102
'J. S. Environmental Protection Agency Region II Off!ce ATTN: EIS COORDINATOR 26 Federal Plaza New York, New York 10007
~,
s
-i : % -
j
~
Enclosura 1
^
w REQUEST FOR ADDITIONAL INFORMATION 7.
0YSTER CREEK NUCLEAR-GENERATING STATION RPS POWER' SUPPLY DESIGN MODIFICATIONS
.s 1The following RPS Power Supply design modification information should be submitted for. po t-imple.nentation review:
i 4
1.
Detailed' drawings of the p'roposed design modification of the
. monitoring scheme for the-RPS power supplies-(MGs and alter-nate source). The drawings should include component ratings,1 and schematic and wiring diagrams.
Detailed relay ~information may be submitted in the form of the manufacturer's Technical Bulletin.
2.
A current revision of-the electrical one-line diagram of the on-site distribution system and a schematic / elementary diagram that includes the RPS power distribution buses.
3.
Justification that proposed time delays, if any, will not result in damage to RPS system components or affect the per-formance of required safety function.c.
4.
Justification that tha design modifications and components will meet the requirements of GDC 2 and GDC 21 of 10 CFR Part 50, Appendix A.
5.
Proposed Technical Specifications per the attached model.