05000311/LER-1981-039-03, /03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled

From kanterella
(Redirected from ML20009G139)
Jump to navigation Jump to search
/03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled
ML20009G139
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/07/1981
From: Espey J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009G131 List:
References
LER-81-039-03L, LER-81-39-3L, NUDOCS 8108030365
Download: ML20009G139 (3)


LER-1981-039, /03L-0:on 810608,determined post-accident Monitoring Instrumentation Had Not Been Completed Since 810422.Caused by Personnel Failure to Enter New Procedure Info Notification Sys.Personnel Counseled
Event date:
Report date:
3111981039R03 - NRC Website

text

. - -

  • (7 77) #

LICENSEE EVENT REPORT 4

CONTROL BLOCK: l l

l l

l l lh (PLEASE PRINT CR TYPE ALL REQUIRED INFO *,MATION) 1 6

% lN l J l S l G lS l 2 l@lb ol ol -l Ol 0l 0l 0l 0l -l 0l 0l@ 4 ! 1l 1l 1l 1l@l l

l@

7 8 9 LICENSEE CODE 18 LICENSE NwMBER 26 26 tlCENSE TYPE JO 67 CAT 68 CON'T I

E

,"juRC dl 015l Ol Ol O! 3l ll ihl 016l ol R! Rl @l 0l7 l 0l 7 l 8ll ]@

7 8

80 81 DOCK ET NUMSER 88 89 EVENT DATE 74 76 REPORT DATE 80 EVENT DESCRIPTION AND PROSABL'E CONSEQUENCES 01o gl On June 8, 1981, it was determined that Technical Specification Surveillance 4.3.3.7j o

l Post Accident Monitoring Instrumentation has not been.ampleted since April 22, 1981p

@l The surveillance is required to be performed every 31 days.

This occurrence l

10 l 5 l l constituted operation in a degraded mode in accordance with Technical l

1 gl Specification 6.9.1.9.b.

g ITTTI I I

l 10181 l

__80

,l 7

8 9 SYSTEM

CAUSE

CAUSE 4.'.W 8 VALVE I

CODE CODE SUSCODE COMPONENT CODE

.'sugCODE SUliCODE ITTTl l Il D l@ {Ajh [B jh l Z l Z l Z l Z l Z l Z lh {@ W h 7

8 9

to 11_

12_

13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER RO EVENT YE A R REPORT NO.

CODE TYPE NO.

h RE gRT l8l1 l b

l0 l3 l 9 l y

l0 l3 l

{

g

{0]

,,,, 21 22 23 24 26 27 28 29 30 31 32 l

N AC ON PLANT ME HOURS S8 i FOR 8.

SU Li MANUFACTURER l

lH l@lZ lg Wg y@

l0l0l0l0l W g y g l Z l g lZ l Zl Zl Zlg 33 34 Jb 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 l

,i ;o; j The personnel responsible for ensuring surveillance requirements are met, failed to l

3 ;, g g enter a new procedure into the notification system. The personnel responsible for l l ensuring surveillances are ompleted were counseled on the importance of entering gl new or revised requirements into the notification system.

Surveillance 4.3.3.7 l

gl was completed satisfactorily, immediately upon notification.

l 7

8 9 80 SA

% POWER OTHER STATUS dis RY DISCOVERY DESCRIPTION l

g y@ l0 l 0] 0l@l N/A l

lAl@l Operation Observation l

ACTIVITY CO TENT RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE l 1 l 6 l W @D OF RELEASEj@l NA l

l NA l

7 8 9 10 1

44 46 80 PERSONNEL EXPOSURES NUMBER OESCRIPTION l d 0l Ol h [TYPEjhl l

1 7

_Z NA PERSONNE L INJURIES NUM8ER

DESCRIPTION

l d O! 0lh!

1 H NA 7

8 9 11 12 80 LOSS OF OR DAMAGE TO F ActLITY h TYPE

DESCRIPTION

v l

hl 1 9 NA 7

8 9 to 80 ISSUE DE CRIPTION IlOJ Lii.181 I

IIIIIIIIIIIII:

NA 8 9 to 68 69 80 3 8108030365 910707 PHON E:

PDR ADOCK 05000311 S

PDR L - -. -