05000311/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl

From kanterella
(Redirected from ML20009G130)
Jump to navigation Jump to search
Forwards LER 81-039/03L-0.Detailed Event Analysis Encl
ML20009G130
Person / Time
Site: Salem PSEG icon.png
Issue date: 07/07/1981
From: Uderitz R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20009G131 List:
References
NUDOCS 8108030357
Download: ML20009G130 (3)


LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981039R00 - NRC Website

text

.

2

=

g g

O PSIEG Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 July 7, 1981 i

4 Mr. Boyce H. Grier Director of USNRC Office of Inspection and Enforcement Region 1 4

631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-39/03L Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 81-39/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, J

U3eri General Manager -

Nuclear Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management gg1 Information and Program Control I

(3 copies)

//

~

8108030357 810707 PDR ADOCK 05000311 S

PDR The Energy People 95 2001 (350M) 4 80

Report Number:

81-39/03L i

Report Date:

July 7, 1981 Occurrence Date:

6-8-81 Facility:

Salem Generating Station, Unit 2 i

Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 i

IDENTIFICATION OF OCCURRENCE:

Missed Surveillance - Channel Check of Post Accident Monitoring Instrumentati c.. (SP (0) 4. 3. 3. 7)

CONDITIONS PRIOR TO OCCURRENCE:

Various Operational Modes DESCRIPTION OF OCCURRENCE:

During the review of surveillance procedures in preparation for mode change it was determined that the surveillance for Technical Specifi-cation 3.3.3.7 was overdue.

The surveillance is required to be performed every 31 days and was last perforced April 22, 1981.

Even though a large majority of the Post Accident Monitoring Instrumentation is channel checked every 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> during routine control console readings the surveillance of 3.3.3.7 was not completed in its entirety.

This occurrence constituted operation in a degraded mode in accordance with Technical Specification 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

l Personnel error.

A new surveillance procedure had been issued to meet the surveillance requirements of Technical Specification 3.3.3.7.

l Previously these requirements were met thought channel checks made when the control console reading were taken once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

When the procedure was issued personnel failed to enter it into the Inspec-tion Order System.

Therefore, when the surveillance became due no j

notification was made through the Inspection Order System to complete the surveillance.

l l

ANALYSIS OF OCCURRENCE:

Technical Specification 3.3.3.7.b requires that with the number of l

operable accident monitoring channels less than the minimum channels required, restore the inoperable channels to operable status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l l

! -~ _.

a LER 81-39/03L

~ J y 7, 1981

CORRECTIVE ACTION

When it was determined the surveillar.;e was overdue, the surveillance was completed immediately.

The surveillance procedure was entered into the Inspection Order System and the personnel responsible were counseled on the importance of ensuring new or revised surveillance requirements were entered into the Inspection Order System for tracking.

FAILURE DATA:

Not Applicable Prepared By J.

J.

Espey

/ h\\(

o v'd Manager d Salem Generating Station SORC Meeting No.