ML20009F907

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-041/03L-0,81-042/03L-0 & 81-043/03L-0
Date released: 01/23/2020 Download: ML20009F907


LER 81-043/03L-0:on 810602,sequencer Associated W/Diesel Generator Failed to Meet Time Requirement for Picking Up Step 2.Caused by Setpoint Drift.Agastat Timer Adjusted & Sequencer Returned to Svc
ML20009F919
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F919 (1)
LER 81-042/03L-0:on 810610,pump Supplying Containment Atmosphere Particulate & Gaseous Radioactivity Monitoring Sys Failed to Start.Caused by Filter Paper Not Advancing Due to Paper Drive Malfunction.Drive Mechanism Adjusted
ML20009F914
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F914 (1)
LER 81-041/03L-0:on 810606,diesel Generator Found Incapable of Automatically Starting Due to locked-in Low Lube Oil Pressure Alarm.Caused by Inadequate Procedural Guidance. Procedures Revised
ML20009F910
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F910 (2)
Forwards LERs 81-041/03L-0,81-042/03L-0 & 81-043/03L-0
ML20009F906
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F906 (1)