05000302/LER-1981-040-03, /03L-0:on 810627,during Power Escalation Following Reactor Startup,Quadrant Power Tilt Exceeded Tech Spec Steady State Limit.Cause Attributed to Xenon Transient Following Earlier Reactor Trip & Plant Startup

From kanterella
(Redirected from ML20009F745)
Jump to navigation Jump to search
/03L-0:on 810627,during Power Escalation Following Reactor Startup,Quadrant Power Tilt Exceeded Tech Spec Steady State Limit.Cause Attributed to Xenon Transient Following Earlier Reactor Trip & Plant Startup
ML20009F745
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/20/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009F742 List:
References
LER-81-040-03L, LER-81-40-3L, NUDOCS 8107310494
Download: ML20009F745 (2)


LER-1981-040, /03L-0:on 810627,during Power Escalation Following Reactor Startup,Quadrant Power Tilt Exceeded Tech Spec Steady State Limit.Cause Attributed to Xenon Transient Following Earlier Reactor Trip & Plant Startup
Event date:
Report date:
3021981040R03 - NRC Website

text

-

(7 77)

LICENSEE EVENT REPORT e

CONTROL BLOCK: l l

l l

l l

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

'o l i ] l F l L l C ] R [ P l 3 lgl 0 l 0 l-l 0 l 0 l 0 l 0 l 0 l -l 0l0 lgl 4 l 1l l j 1l 1lgl l

lg 7

8 9 LICENSEE CODE 14 lb LICENSE NUMBER 23 26 UCENSE TYPE 40

$7 CAT $8 N 'T lolt]

3{,] l L l@L4 5101-Io I 3 I o 12 I@i 01 61 2l 7l si 11@lo i 7l 21 ol al 11@

I 8

60 61 DOCnET NUMBER 68 69 EVENT DATE 74 75 CEPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h lo l2l IAt 1600 during power escalation af ter Reactor startup. it was determined that the quadrartt l o l a 1 l Power tilt exceeded the steady state limit of T.S. 3.2.4 for the time period 1600 to 161(3

[ o l4 l (rhere was no ef fect upon the health or safety of the general public. This was the fourth I ioIslitime the quadrant power tilt exceeded the steady state limit,and this is the fifth event]

[6ls; jreported under this Specification.

l 1017] I l

l0isl l J

80 7

8 9 C DE CODE SUSC E COVPONENT CODE S aC D'E SU E

1o191 I Rl C l@ W@ lZ lh l Zl Zl Zl ZI Zl Zlh l Zlh J h 7

8 9

10 11 12 13 18 19 20 SE QU E NTI AL OCCURAENCE REPORT REVISION LE R RO EVENT YE AR REPORT NO.

CODE TYPE N O.

O agg 18 I Il I-I I 014l 0l l/l l0l3l lL l

[,-l l0 l s

_l' JJ 23 24 n

27 28 29 JU 31 32 A EN A TC ON PLA T ETH HOURS S 8 iTT FOR 1 B

SUPP LI E MAN FACTURER

!Zl@lZl@ J@

lZ l@

l0l0l0l0l [Y_J @

LN j@

l2l@

l Z i 9 l 9 l 9 l@

l JJ 34 33 30 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 11 IoI[ThU cause of this event is attributed to a Xenon transient followine a Reactor trin 1

l earlier in the day and the transient caused by plant startup. No corrective action l

i i

was required; the event was self correcting.

l

,,,,j l

l i l 31 I l

11 6 41 l 80 7

8 9 ST S

% POV.E R OTHEa STATUS SCOV RY DISCOVERY 0ESCRiPTION NA l

l A l@l Operator observation l

R W@ l 0l 3l 0]@l ACTivt TY CONTENT RELE ASED OF RELE ASE AYOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA l

l1 l6l

@ l Zl@l 7

8 9 10 11 44 4b 80 PERSONNEL E XPOSLRES NUM8ER TYPE DE SCRIP TION NA l

l0l0l0l@ g @l 1 7 PERSONNE L iN;u'n'iES NUV EP

DESCRIPTION

NA l

l3 l 3 l {0 l l 0 lg 80 7

8 3 11 12 LOSS OF OR DAMAGE To FACallTY Q TYPE CESCRIPTION v

NA l

ITl Lz J@l

"ElSCR,PT,0N @ j$O58!Pd58282

""c "S' l2 N L381 PDR l

lllllllllllII3 68 69 80

  • 7 8 9 10 904/795-6486 o

gg PH ON E :

NAVE OF PREPARER (cre ormaruvn c:itppi Pimtf5Y UF02NMION SHEET)

e

/

SUPPLEMENTARY INFORMATION Report No.:

50-302/81-040/03L-0 Facility:

Crystal River Unit 3 Report Date:

July 20,1981 Occurrence Date:

June 27, 1981 Identification of Occurrence:

The quadrant power tilt exceeded the steady state limit contrary to Technical Specification 3.2.4 Conditions Prior to Oce:.rrence:

Mode 1 power operation (30%)

Description of Occurrence:

At 1600 during power escallation, after Reactor startup, it was determined that the quadrant power tilt exceeded the steady state limit. The event was self correcting and the quadrant power tilt was within the steady state limit at 1616.

Designation of Apparent Cause:

The cause of this event is attri6uted te a Xenon transient following a Reactor trip earlier in the day,snd the transient caused by plant startup.

Analysis of Occurrence:

There was no tifect upon the health or safety of the general public.

Corrective Action

j No corrective action was required to restore the quadrant power tilt to within the steadv state limit.

l l

Failure Data:

This was the fourth time the quadrant power tilt exceeded the steady l

state limit and this is the fifth event reported under this Specifica-tien.

i l

l

/rc l