ML20009C782

From kanterella
Jump to navigation Jump to search

Amend 40 to License DPR-72,revising Tech Specs to Clarify Term Operable as Applied to Safety Sys & Emergency Power & to Make Shutdown Times Consistent W/Sts
ML20009C782
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/10/1981
From: Stolz J
Office of Nuclear Reactor Regulation
To:
City of Alachua, FL, City of Bushnell, FL, City of Gainesville, FL, City of Kissimmee, FL, City of Leesburg, FL, City of New Smyrna Beach, FL, City of New Smyrna Beach, FL, Utilities Commission, City of Ocala, FL, City of Orlando, FL, City of Tallahassee, FL, Florida Power Corp, Orlando Utilities Commission, Sebring Utilities Commission, Seminole Electric Cooperative
Shared Package
ML20009C783 List:
References
TAC 43037, DPR-72-A-040 NUDOCS 8107210499
Download: ML20009C782 (7)


Text

.

  • ~

'sl ULTED STATES

\\

NUCLEAR REGULATORY COMMISSION f

g WA SHINGTON, D. C. 20558 3

+

9, FLOR!JA POWER CORPORATION CITY 0F ALACHUA CITY OF BUSHNELL CITY OF GAINESVILLE_

CITY OF XISSIMMEE CITY OF LEESBURG CITY OF~ NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES COMMISSION SEMIN0LE ELECTRIC COOPERATIVE, INC.

CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT AMEN 0 MENT TO FACILITY OPERATING LICENSE Amentiment No. 40 License No. DPR-72 1.

The Nuclear Regulatory Commission (the Comission) has 'found that:

A.

The application for amendment by Florida Power Corporation, et al (the licensees) dated May 21, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulaticns of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of.

i l

the Comission's regulations and all applicable requirements have been satisfied.

8107210499 810710 PDR ADOCK 05000302 p

PDR

2.

Accordingly. -the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:

(2). Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.40, are hereby incorporated in the license.

Florida Power Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR R GULATORY COMMISSION Jo n' F. Stolz, Chiefl Op rating Reactors franch #4 vision of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: July 10,1981 4

2 e

a I

e

ATTACHMENT TO LICENSE AMENDMENT NO. do FACILITY OPERATING LICENSE NO. DPR-72 DOCKET NO. 50-302 Replace the following pages of the Appendix "A". Technical Specifications-with the enclosed pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.. The corresponding overleaf pages are also provided to maintain document.

completeness.

Pages 3/40-1 3/4 0-2 3/4 0-3 (new page)

B 3/4 0-1 B 3/4 0-2, B 3/4 0-3 B 3/4 0-4 (new page) e..

n, 4

3/4 LIMITINC CONDITIONS FOR OPERATION' AND' SURVEILLANCE REQUIREMENTS 3/4.0 APPLICABILITY LIMITING' CONDITION FOR OPERATION 3.0.1 Limiting Conditions for Operation and ACTION requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for each specification.

3.0.2 Adherence to the requirements of the Limitino Condition for Oper-ation and/or associated ACTION within the specified time interval shall constitute compliance with the specification. In the event the Limiting Condition for Operation is mstored prior to expiration of the specified time interval, completion of. the ACTION statement is not mquired.

5.0.3 When a Lhiting Condition for Operation is not met, except' as provided l

in the associateu ACTION requirements, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> action shall be initiated to place the unit in a MODE in which the h ecification does not apply to placing it, as appifcable, in:

1.

At least HOT STAN05Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 2.

At lea.it HOT SHUTOOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and 3.

At least COLD SHUTOOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Where corrective measures are completed that permit operation under the ACTION requirements, the ACTION may be taken in accordance with the specified time limits as measured-from the time of failure to meet the Limiting Condition for i'

Operation.

Exceptions to these requirements are stated in the individual Specifications.

t 3.0.4 Entry into an OPERATIONAL MODF cP utner specified applicability condition shall not be made unless the conditions of the Limiting Con-I dition for Operation are met withcut m11ance on provisions contained in the ACTION statements unless otherwise excepted. This provision shall not p. event passage through OPERATIONAL MODES as required to comply with ACTION statements.

i 3.0.5 When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its appitcable Limiting Condition for Operation, provided:

(1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant system (s),

sybsystem(s), train (s), component (s) and device (s) are OPERABLE, or likewise satisfy the requirements of this specification.

Unless both conditions (1)'

and (2) are satisfied, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> action shall be initiated to place the unit in a MODE in which the applicable Limiting Condition for Operation does not apply by placing it as applicable in:

1.

At least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, i

2.

At least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and

[

3.

At least COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

This Specification is not applicable in MODES 5 or 6.

1 CRYSTAL RIVER - UNIT 3 3/4 0-1 Amendment No. 40 4

e

,,.-,..--,.- ~ n -,--

-,,,..-,,.,.w..r,

.wa.,

,-,m

.-,-v,.~-.

,-,--,-m-w

,w-e-

APPLICABILITY SURVEILLANCE REQUIREMENTS (Continued)

Performance of the above inservice inspection and testing activities shall be in addition to other specified Surveillance Requirements. The provisions of %ecificiation 4.0.2 are not applicable to surveillance intervals associated with inservice inspection and testing activities required by Section XI of the above ASME Boiler and Pressure Vessel Code and applicable Addenda.

l CRYSTAL RIVER - UNIT 3 3/4 0-3 Amendment No. 40 y

w

-w

3 3/4.0 APPLICA8ILITY BASES The specifications of this section provide the general requirements applicable to each of the Limiting conditions for Operation and Surveil-lance Requirements within Section 3/4.

3.0.1 This specification defines the applicability of each specifi-cation in terms of defined OPERATIONAL MODES or other specified condi-tions and is provided to delineate specifically when each specification is applicable.

3.0.2 This specification defines those conditions necessary to con-stitute compliance with the terms of an individual Limiting Condition for Operation and associated ACTION requirement.

3.0.3 This specification delineates the measures to be taken for those

' circumstances not directly provided for in the ACTION statements and whose occurrence would violate the intent of a specification. For example, Specification 3.5.2 requires two independent ECCS Subsystems to be OPERABLE and provides explicit ACTION requirements if one ECCS Subsystem is inoperable.

Under the requirements of Specification 3.0.3, if both the required ECCS Subsystems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least HOT SHUTD0'.lN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. As a further example, Specification 3.6.2.1 requires two Containment Spray Systems to be OPERABLE and provides explicit ACTION requirements if one Spray System is inoperable. Under the requirements of Specification 3.0.3, if both the required Containment Spray Systems are inoperable, within one hour measures must be initiated to place the unit in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in COLD SHUTDOWN within the subsequent 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3.0.4 This specification provides that entry into an OPERATIONAL MODE or other specified applicability condition must be made with (a) the full complement of required systems, equipment or componer.ts OPERA-BLE and (b) all other parameters as specified in the Limiting Conditions for Operation being met without regard for allowable deviations and out of service provisions contained in the ACTION statements.

The intent of this provision is to insure that facility operation is not initiated with either required equipment or systems inoperable or other specified limits being exceeded.

CRYSTAL RIVER - UNIT 3 8 3/4 0-1 Amendment No. 40

APPLICABILITY BASES' subsystems, trains, components and devices supplied by the inoperable i

normal power sources, both of the offsite circuits, would also be inop-erable. This would diccate invoking the applicable ACTION statements for each of the applicable LCOs. However, the provisions of Specifica-tion 3.0.5 permit the time limits for continued operation to be consis--

tent with the ACTION statement for the inoperable normal power sources.

instead, provided the other specified conditions are satisfied.- In this case, this would mean that for one Zivision the emergency power source must be OPERABLE (as must be the components ' supplied by the emergency power source) and all redundant systems, subsystems, trains, components and devices in the other division must be OPERABLE, or likewise satisfy Specification 3.0.5 (i.e.,- be capable of performing their design func-tions and have an emergency power source OPERABLE). In other words, both emergency pcwer sourcer must be OPERABLE and all redundant systems, subsystems, trains, components and devices in both divisions must also be OPERABLE. If these conditions are not satisfied, shutdown is re-quired in accordance with this specification.

In MODES 5 or 6, Specification 3.0.5 is not applicable, and thus the in-dividual ACTION statements for each applicable Limiting Condition f;r Operation in these MODES must be adhered to.

4.0.1 This specification provides that surveillance activities necessary to insure the Limiting Conditions for Operation are ret and t

will be performed during the OPERATIONAL MODES or other conditions for which the Limiting Conditions for Operation are applicable. Provisions for additional surveillance activities to be performed without regard to the appifcable OPERATIONAL MODES or other conditions are provided in the individual Surveillance Requirements.

4.0.2 The provisions of this specification provide allowable tol-erances for performing surveillance activities beyond those specified in the nominal surveillance interval. These tolerances are necessary to provide operational flexibility because of scheduling and performance considerations.

The tolerance values, taken either individually or consecutively l

over 3 test intervals, are sufficiently restrictive to ensure that the reliability associated with the surveillance activity is not signift-cantly degraded beyond that obtained from the nominal specified interval.

4.0.3 The provisions of this specification set forth the criteria for determination of complinnce with the OPERABILITY requirements of the Limiting Conditions for Operation. Under this criter'ia, equipment, 4

systems or components are assumed to be OPERABLE if the associated sur-veillance activities have been satisfactorily performed within the CRYSTAL RIVER - UNIT 3 8 3/4 0-3 Amendment No. 40

---e w-,

-w,,r-mm.

-w,

,.r-

.nn,,,,w--n,-g, g

a w

-n

-w e----

s, w--

w---