ML20009B796

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-219/81-11 on 810501-31 & Notice of Violation
ML20009B796
Person / Time
Site: Oyster Creek
Issue date: 07/01/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
Shared Package
ML20009B797 List:
References
NUDOCS 8107170177
Download: ML20009B796 (2)


See also: IR 05000219/1981011

Text

b

[$ CtC

a

L

o

o

UNITED STATES

g

m (g

NUCLEAR REGULATORY COMMISSION

g

3

,fj

REGION 1

-

O,

V

'g

631 PARK AVENUE

% '.V

,&

KING OF PRUSSIA, PENNSYLVANIA 19406

+ ...

Docket No. 50-219

JUL 1 1981

a

)

s

g kcPp p <?

Jersey Central Power and Light Company

Ny'

ATTN: Mr. Ivan R. Finfrock, Jr.

6-

El 1 61981 m -

-

Vice President

'-

Oyster Creek Nuclear Generating Station

u4 ==

S

-

"

'

Forked River, New Jersey 08731

B

" " * "

9

Gentlemen:

b

a)

Subject:

Inspection 50-219/81-11

This refers to the routine safety inspection conducted by Mr. J. Thomas of

this office on May 1-31, 1981 at the Oyster Creek Nuclear Generating Station,

Forked River, New Jersey of activities authorized by NRC License No. DPR-16

and to the discussions of our findings held by Mr. Thomas with Mr. J. Carroll

and other members of your staff periodically during, and at the conclusion

of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by

the inspector.

Our inspector also verified the steps you have taken to correct the item of

nonccmpliance brought to your attention in the enclosure to our letter dated

May 5, 1981. We have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full ccmpliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of non-

compliance has been categorized into the levels described in the Federal Register

Notice (45 FR 66754) dated October 7,1980. You are required to respond to

this letter and in preparing your response, you should follow the instructions

in Appendix A.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this

letter and the enclosures will be placed in the NRC's Public Document Room.

i

-

If this report contains any infomation that you (or your contractors) believe

to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you

(a) notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

l

f

f *: '

6

l

l

8107170177 810701

l

PDR ADOCK 05000219

O

'

PDR

,

.

.

.

.

Jersey Central Power and Light

2

Company

5 1g

within 25 days from the date of this letter a written application to this

office to withhold such infomation.

Consistentwithsection2.790(b)(1),any

such application must be accompanied by an affidavit executed by the owner of

the infomation which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons on the basis which it is claimed

that the infomation should be withheld from public dirclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b) (4)'. The infomation sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If we

do not hear from you in this regard within the specified periods noted above,

the report will be placed in the Public Document Room. The telephone notiGration

of your intent to request withholding, or any request for an extension of the in

day period which you believe necessary, should be made to the Supervisor, Files,

Mail and Records, USNRC Region I, at (215) 337-5223.

Sincerely,

.

.

Mr

R. R. K imig, C

f

Project Branch #2, Division of

Resident and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-219/81-11

cc w/encls:

M. Laggart, Licensing Supervisor

.

J. Knubel, BWR Licensing Manager

. --

. _ _ . _ .-_

, _ _ _ _ . .

..

.

..

.

. .

j