05000336/LER-1981-008-01, /01T-0:on 810213,determined Spring Can Type Hanger Installed Improperly,Resulting in Overstressed Socket Welded Joint.Caused by Incorrect Design.Hanger Removed & Pipe Isolated & Depressurized.Design to Be Corrected

From kanterella
(Redirected from ML20008E925)
Jump to navigation Jump to search
/01T-0:on 810213,determined Spring Can Type Hanger Installed Improperly,Resulting in Overstressed Socket Welded Joint.Caused by Incorrect Design.Hanger Removed & Pipe Isolated & Depressurized.Design to Be Corrected
ML20008E925
Person / Time
Site: Millstone 
Issue date: 02/27/1981
From: Resetar J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20008E919 List:
References
LER-81-008-01T, LER-81-8-1T, NUDOCS 8103100510
Download: ML20008E925 (1)


LER-1981-008, /01T-0:on 810213,determined Spring Can Type Hanger Installed Improperly,Resulting in Overstressed Socket Welded Joint.Caused by Incorrect Design.Hanger Removed & Pipe Isolated & Depressurized.Design to Be Corrected
Event date:
Report date:
3361981008R01 - NRC Website

text

(7-771 LICENSEE EVENT REPORT

.e

) CONTROL PLOCK: l l

l l

l l

lh (PLEASC PRINT OR TYPE At.L REQUIRED INFORMATIONI 1

6 lo l1 ] l C l T l M l N l Sl 2 l@l0 l O l'-l 0 l 0 l 0 l 0 l 0 l-10 10 l@l 4 l 1 l 1 l 1 l 1 j@l l

l si car de @

7 8 9 LitiNSE E CO:;E 14 15 LICE *.sh % veEM 25 26 LiCLNst ivPE Ja CON'T lolil

$$ /$ l L J@l 015 10 10 10 13 13 I 6 l@l 01211 h la h }@l 01212 l 71811 l@

7 8

00 C1 DOCKETNUVSER GJ

.63 EVENT OATE 74,

75 REPOOT CATE SJ EVENT DESCRIPTION Af;O PRCB ABLE CONSEQUENCES h I

l o 12 ] l Duri.ng routine power operation, an as-built hanger review of the reactor vessel

, o,3 j ; head vent piping system determined that a spring can type hanger was installed I

incorrectly. The improper installation resulted in overstressing a socket welded i

, joint.

Failure at the joint would have resulted in a non-isolable RCS l

I lo is i i l

lo 171 I I o ta 11 No Similiar LER'S.

I 83 C DE CO E SLCCO E CovPONENT CODE

! 3: O' E 5

0 8 l 0 l 9]

lC l A l@ l Bl@ [ A l@ l Sl Ul P l 0 lR lT l@ l Al@ lZ l@

7 8

9 10 11 12 13 18 19 20 SE QUE N TI AL OCCURRENCE HETORT REVISION LE RiHQ E% ENT YE AR REPOR T NO.

COOS TYPE NO.

@ Ngj,3 I811I l-l 10 10 18 l l_/_]

10 11 i LT_]

l-1 Laj a

,,,,, 21 22 23 24 26 27, 28 29 JJ 31 32 T K ACTCt ON PLANT T

HOURS S8 iT F O R '.

B.

5 PLIE VA F CTURER IX l@lF l@

lAl@

1]@

l O l0 l 1 I a l l N l@

lY l@

LLj@

lXl919l9lh 33 34 05 36 31 43 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIO*e5 IiIoIi The installation was the result of an incorrect desian.

The stressas l

l1 1i1 I were reduced to less than allowable by removing the hancer and isolating I

then depressurizing the affected piping. Until a new design is comDiete. the head I

{,,,, ;

vent piping and specifically the overstressed joint will remain as is.

Additional I

hangers have been verified as correct.

I 7

8 9 STA

% PCAER OTHER STATUS SO RY CISCOVERY CESCRIPTION l

Ii I 5 l l E l@ l 1 l 0 l 0 l@l NA l

[fj@l As-Ruiu nrwing him ACitvlTV CC TENT OF af tE ASE AUCUNT OF ACTIVITY LCCATION CF RELE ASE li jcl lRE LkASE Dl @ l Z jgl NA l

l NA l

80 7

8 9 10 11 44 45 PERSONNE L EXPOOVHES NUve E st TYPE CEste4lF r10N '

I l i l 7 ] l 010 10 l@l Z l@l NA PER$CNNE L INJLRiES NUvaER D E SCR IP flCN I

li in l l0 l0 l 0l@l NA 80 7

8 9 11 12 LCSS CF CR C AV ACE TO F ACILITY TT*E LESCRIPTION I

l T l 91 I z l@l NA IC 7

8 9 to NRC UsE ONLY Pule LICIT Y I 2 I o l lY+ En@lOESCRIPTION j

Press-release on 021381 to "The Day" New London. Ct.

- 1 IIlIIIIIIIIII,I c

68 69 BJ. ;

I 8 9 30 A

Resetar, Jr.

203-447-1791 L

!810 31 o

  • 50-Jonn P.