-, . ._,

0 DUKE POWER COMPANY Powen 13ctLuiso ace SocTu Cucacu STurer. CiuMLOTTE. N. C. ana42 w w 4 m o. ma a m c a. . n. March 5, 1981 n e p.cs oto, c . c .-% c u t . a s c. es o .o- r > -m v- , 78. ~; .

Mr. James P. O'Reilly, Director p U. S. Nuclear Regulatory Commission h

'Q\

Region II 101 Marietta Street, Suite 3100 e 2./

M j'

Atlanta, Georgia 30303 4 4A/,gOg 11 Re: McGuire Nuclear Station Unit 1 N Docket No. 50-369  % -

Dear Mr. O'Reilly:

Please find attached Reportable Occurrence Report R0-369/81-12. This report concerns surveillance of isolation valve NV-250. This incident was considered to'be of no significance with respect to the health and safety of the public.

.This report was inadvertently categorized as a 30-day report whereas it should have been a 14-day report. . Consequently, this report is being submitted eight days late.

.Very.truly yours, ,

w f! gis Zs- l

  • William O. Parker, Jr. *

/g RWO:ses Attachnent ec: Director Mr. Bill Lavallee Office of Management and Program Analysis Nuclear Safety Analysis Center U. S. Nuclear Regulatory Commission P. O. Box 10412 Washington, D. ' C. 20555 Palo Alto, California- 94303 I

00

-S e /

S 81os3 conc ,

~

MCGUIRE NUCIL\R STATION INCIDENT REPORT Report Number: R0-369/81-12 Report Date: February 20, 1931 Occurrence Date: February 5, 19Si Facility: McGuire L* nit 1, Cornelius, North Carolina Identification of Occurrence: Isolation Valve NV-250 was not Verified Closed Administratively Every 72 Haurs Following Completion of Initial Fuel Loading Conditions Prior to Occurrence: Initial Fuel Loading, Mode 6 Description of Occurrence:

On February 11, 1981, isolation valve NV-250 was found not to have been verified closed under administrative control as required by Technical Specification 4.9.1.3.

Apparent Cause of Occurrence:

Daily Surveillance Items did not contain a sign-off step to verify that NV-250 was closed.

Analysis of Occurrence:

Initial Fuel Loading test procedure required that NY-250 be verified closed administratively per Technical Specification 4.9.1.3. NV-250 was last verified locked closed per the above TP at 1825 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.944125e-4 months <br /> on February 2, 19S1. The status of NV-250 was not checked again until 1955 hours0.0226 days <br />0.543 hours <br />0.00323 weeks <br />7.438775e-4 months <br /> on February 11, 1981, and was found to be locked closed with the White Equipment Danger Tag attached. Operations misinterpreted Technical Specification 4.9.1.3 to mean that NV-250 should be verified closed only when initial fuel loading was in progress. This was not the case, and thus was reportable.

Since NV-250 was locked closed when it was checked on February 11, 1981 it can be assumed that it had been closed since FrTruary 2, 1981. However, even if NV-250 had been open, there were other valves downstream of NV-250 which were locked closed or normally closed which would have prevented a boron dilutien of the Reactor Coolant System. Thus, the incident did not affect safe plant operation and_the health and safety of the public were not affected.

Corrective Action: