ML20008E176
| ML20008E176 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/31/1980 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML20008E174 | List: |
| References | |
| NUDOCS 8010240315 | |
| Download: ML20008E176 (2) | |
See also: IR 05000289/1980003
Text
UNITED STATES
c
4
pg
'
NUCLEAR REGULATORY COMMisslON
-
U
REGION I
E'
f
631 PARK AVENUE
niNo oF PRUS$t A, PENNSYLVANI A 19406
.
4
,
u...
Docket Nos. 50-289
'50-320
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold
Senior Vice President
100 Interpace Parkway
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Combined Investigation Report Nos. 50-289/80-03 and 50-320/80-03
This refers to the investigation conducted by Mr. R. E. Shepherd of this office
from February 1 through March 27, 1980 at Three Mile Island Nuclear Station
Units 1 and 2, Middletown, Pennsylvania of activities authorized by NRC License
Nos. DPR-50 and DPR-73 and to the discussions of our findings held by Mr. Shepherd
with Mr. P. G. Christman and other members of your staff at the conclusion of
the investigation.
Areas examined ooring this investigation are described in the Office of Inspectioil
and Enforcement Investigation Report which is enclosed with this letter.
Based on the results of this investigation it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
These items
of noncompliance have been categorized into the levels as described in our
correspondence to you dated December 31, 1974.
This notice is sent to you
pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requirr.s you to
submit to this office, within twenty (20) days of your receipt of this notice, a
written statement or explanatio.n in reply including:
(1) corrective steps which
have been taken by you and the results achieved; (2) corrective steps which will
be taken to avoid further items of noncompliance; and (3) the date when full
compliance will be achieved.
-
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials and your
facility security procedures are exempt from disclosure; therefore, the enclosures
to this letter, and your response to this letter will not be placed in the
Public Document Room and will receive limited distribution.
l
8010240
{
_,
.
_._
..
._
_
.
.
Metropolitan Edison Company
2
3 1 JUL 1980
.
Should you have any questions concerning this investigation, we will be pleased
to discuss them with you.
Sincerely,
E
W
Walter G. Martin, Chief
Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790 Information)
2.
Office of Inspection and Enforcement Combined Investigation Report
Numbers 50-289/80-03 and 50-320/80-03 (Contains 2.790 Information)
i
cc w/ report cover sheet only:
J. G. Herbein, Vice President-Nuclear Operations
J
R. J. Toole, Manager, Unit 1
'
G. K. Hovey, Director, Unit 2
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Barton, Manager Site Operations, Unit 2
J. J. Colitz, Manager, Plant Engineering, Unit 1
B. Elam, Manager, Plant Engineering, Unit 2
L. W. Harding, Supervisor of Licensing (with copy of enclosures)
R. F. Wilson, Director - Technical Functions
J. W. Brasher,tunager, Radiological Controls, Unit 2
E. G. Wallace, Licensing Manager
i
I. R. Finfrock, Jr.
'
R. W. Conrad
J. B. Lieberman, Esquire
i
G. F. Trowbridge, Esquire
Ms. Mary V. Southard, Chairperson, Citizens for a Safe Environment
)
i
1
l
.
l
l
l
_