ML20008E173
| ML20008E173 | |
| Person / Time | |
|---|---|
| Site: | Surry, Crane |
| Issue date: | 09/25/1980 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Arnold R METROPOLITAN EDISON CO. |
| Shared Package | |
| ML20008E174 | List: |
| References | |
| NUDOCS 8010240303 | |
| Download: ML20008E173 (2) | |
See also: IR 05000289/1980003
Text
YW
,
,
4,
UNITED STATES
k
NUCLEAR REGULATORY COMMISSION
.,
REGION 8
ti,
g
431 PARK AVENUE
5 SEP 1
af
KING OF PRUSSIA. PENNSYLVANI A 1940.
.....
,
Docket Nos. 50-289
i
50-320
'
Metropolitan Edison Company
ATTN: Mr. R. C. Arnold
Senior Vice President
100 Interpace Parkway
Parsippany, New Jersey 07054
Gentlemen:
Subject:
Combined Inspection Nos. 50-289/80-03 and 50-320/30-03
This refers to your letter dated August 28, 1980, In response to our letter
dated July 31, 1980.
Thank you for informing us of the corrective and preventive actions documented
,
in your letter with regard to the items of noncompliance contained in the Notice
'
of Violation enclosed with our letter of July 31, 1980.
These actions will be
examined during a subsequent inspection of your licensed program.
With regard to Item 3, contained in the above Notice of Violation, your response
to this item notes the corrective action taken by you to prevent a recurrence of
the situation which resulted in the item of noncompliance and contains a request
that this item be withdrawn for the reasons stated in the enclosure to your letter.
After careful consideration of your response to Item 3, we have concluded that
this item of noncompliance was found to be as stated in the Notice of Violation
and your request that this item be withdrawn is being denied for the reasons
explained in the attachment to this letter.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of your control and account-
ing procedures for safeguarding special nuclear materials and your facility
security procedures are exempt from disclosure; therefore, the attachment to this
letter and the enclosure to your letter, dated August 28, 1980, will not be
placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning the above, we will be placed to discuss
them with you.
Sincerely,
i
(.
~-
fafterG. Martin, Chief
tSifeguards Branch
Attachment: As Stated
8010240
3 0,3
__
.
.
Metropolitan Edison Company
2
2 5 SEP 1980
cc w/o attachment:
J. G. Herbein, Vice President-Nuclear Operations
R. J. Toole, Manager, Unit 1
W. E. Potts, Manager, Radiological Controls, Unit 1
J. J. Colitz, Manager, Plant Engineering, Unit 1
G. K. Hovey, Director, Unit 2
J. J. Barton, Manager Site Operations, Unit 2
J. W. Brasher, Manager, Radiological Controls, Unit 2
B. Elam, Manager, Plant Engineering, Unit 2
L. W. Harding, Supervisor of Licensing
R. F. Wilson, Director - Technical Functions
E. G. Wallace, Licensing Manager
I. R. Finfrock, Jr.
l
R. W. Conrad
J. B. Lieberman, Esquire
.
'
G. F. Trowbridge, Esquire
Ms. Mary V. Scuthard, Chairperson, Citizens for a Safe Environment (Without Enclosure)
I
1
--
-e
_ _ _
.
-- ,
.
,
-
-
-