MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20216E6051999-09-0707 September 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20210H0631999-07-28028 July 1999 Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, by Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4131999-07-27027 July 1999 Application for Amend to License NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G8831999-07-26026 July 1999 Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5251999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4631999-07-26026 July 1999 Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumention & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20195F9121999-06-10010 June 1999 Application for Amend to License NPF-3,changing TS 3/4.6.4.4 Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20207E7861999-05-21021 May 1999 Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capability ML20205E4961999-03-19019 March 1999 Application for Amend to License NPF-3,requesting Withdrawal of Proposed New Action B to TS 3.6.5.2,previously Submitted in 981027 Application ML20204F1691999-03-0909 March 1999 Application for Amend to License NPF-3,adopting Changes in Frequency & Scope of Volumetric Exams Justified by W TR WCAP-14535A ML20196F3791998-11-30030 November 1998 Supplemental Application for Amend to License NPF-3, Proposing Changes to License Conditions 2.C(6) & 2.E by Transferring Operating Authority for DBNPS from Toed & Centerior Svc Co to Firstenergy Nuclear Operating Co ML20155E3181998-10-28028 October 1998 Application for Amend to License NPF-3,revising Various Sections of TS 6.0, Administrative Controls, Including Relocation of Contents of 6.11 to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E0701998-10-27027 October 1998 Application for Amend to License NPF-3,revising TSs 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation by Providing Potential Reduction in Spurious Trip Rate to Provide Cost Savings in Excess of $50,000 ML20155D7731998-10-27027 October 1998 Application for Amend to License NPF-3,relocating Existing TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8481998-10-27027 October 1998 Application for Amend to License NPF-3,revising Existing TS SRs 4.8.2.3.2.d,4.8.2.3.2.e,4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2811998-09-0808 September 1998 Application for Amend to License NPF-3,permitting Use of Framatome Cogema Fuels M5 Advanced Alloy Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2851998-09-0808 September 1998 Application for Amend to License NPF-3,revising TS Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20236G6461998-06-29029 June 1998 Application for Amend to License NPF-3,transferring Operating Authority for DBNPS from TE & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Marked Up License,Safety & Environ Assessments Included ML20236R2301998-06-29029 June 1998 Resubmitted Application for Amend to License NPF-3, Transferring Operating Authority for DBNPS from Teco & Centerior Svc Co to New Operating Company Called Firstenergy Nuclear Operating Co.Safety Assessment & EA Included ML20217P8671998-04-24024 April 1998 Application for Amend to License NPF-3,modifying Existing TS 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases by Relocating Tables of Response Time Limits from TS to Plant USAR Technical Requirements Manual ML20217P8251998-04-24024 April 1998 Application for Amend to License NPF-3,clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20203L0861998-02-26026 February 1998 Application for Amend to License NPF-3 to Revise TS 3/4.4.5 & TS 3/4.4.6.2,incorporating New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2511997-12-23023 December 1997 Application for Amend to License NPF-3.Amend Changes TS Definitions 1.12,TS 3/4.9.5 & New TS 3.0.6 ML20197J5861997-12-23023 December 1997 Application for Amend to License NPF-3,revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2801997-08-26026 August 1997 Application for Amend to License NPF-3,clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2831997-08-26026 August 1997 Application for Amend to License NPF-3,modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5931997-07-29029 July 1997 Suppl 950929 to Application for Amend to License NPF-3, Change TS 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating & Associated Bases 3/4.4.2 & 3/4.4.3 ML20141F1051997-06-24024 June 1997 Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138A3201997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Conversion to 24-month Fuel Cycle ML20138C3131997-04-18018 April 1997 Application for Amend to License NPF-3,requesting Rev to TS 3/4.7.6 to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20138M1251997-02-14014 February 1997 Application for Amend to License NPF-3,requesting Delay of Heat Removal Sys Valve Pit Surveillance Requirements ML20134D7461997-01-30030 January 1997 Application for Amend to License NPF-3,revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0561997-01-20020 January 1997 Application for Amend to License NPF-3,involving TS 3/4.5.3 Re ECCS Subsystems ML20132C7771996-12-13013 December 1996 Application for Amend to License NPF-3,authorizing Transfers of Control ML20132B6871996-12-11011 December 1996 Application for Amend to License NPF-3,revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle ML20134F1851996-10-28028 October 1996 Application for Amend to License NPF-3,requesting Revisions to 3/4.8.1.1,3/4.8.1.2,3/4.8.2.3,3/4.8.2.4 & 3/4.8 Re Electrical Power Systems ML20117P5301996-09-17017 September 1996 Application for Amend to License NPF-3,supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8441996-09-12012 September 1996 Application for Amend to License NPF-3,revising Reactivity Control Systems & Emergency Core Cooling Systems ML20117M1971996-09-0404 September 1996 Application for Amend to License NPF-3,App A,Modifying TS 6.2.3 by Removing Specific Overtime Limits & Working H from TS Consistent W/Nrc Recent Determination,On Generic Basis, That Limits Need Not Be Specified ML20116K2601996-08-0707 August 1996 Application for Amend to License NPF-3,changing Tech Specs 1.0, Definitions, Bases 3/4.0, Applicability & 3/4.6.2.1, Containment Sys - Depressurization & Cooling Sys - Containment Spray Sys ML20117K1871996-05-28028 May 1996 Application for Amend to License NPF-3,revising TS 3/4.3.1.1 RPS Instrumentation & TS 3/4.3.2.2 - Anticipatory RTS Instrumentation to Increase Trip Device Test Interval ML20107L3541996-04-18018 April 1996 Application for Amend to License NPF-3,requesting NRC Review & Approval to Use Alternate Electrical Lineup.Station Blackout DG as Standby Emergency Power Source to Supply Loads Normally Supplied by EDG 1,while Being Reworked ML20101M1601996-03-29029 March 1996 Application for Amend to License NPF-3,App A,Re Surveillance Requirements for Charcoal Filter Lab Testing to Revise Testing Methodology Used to Determine Operability of Charcoal Filters in ESF Air Handling Units ML20101C6911996-03-0606 March 1996 Application for Amend to License NPF-3,revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI 1-2 Pump Until 10th Refueling Outage, Scheduled to Begin 960408 ML20100E0051996-02-0505 February 1996 LAR 93-0003 to License NPF-3,revising Table 3.3-3 of TS 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation to More Accurately Reflect Design & Actuation Logic of Plant Sequencers & Undervoltage Relays ML20095F5861995-12-12012 December 1995 Application for Amend to License NPF-3,revising TSs Re Containment Sys ML20098C5131995-10-0202 October 1995 Application for Amend to License NPF-3,revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C1071995-09-29029 September 1995 Application for Amend to License NPF-3,modifying TS 3.4.3 & Associated Bases for Pressurizer Code Safety Valve Lift Setpoint Tolerances ML20098C3931995-09-29029 September 1995 Application for Amend to License NPF-3,revising Tech Spec 3/4.1.2.8, Reactivity Control Sys - Borated Water Sources - Shutdown, Tech Spec 3/4.1.2.9, Reactivity Control Sys - Operating & TS 3/4.5.1, ECCS - Core Flooding Tanks 1999-09-07
[Table view] |
Text
-.
t'
(
TOLEDO f
%s EDISON .
a c.ava nam cm. ;
t DONAL(J C. SAELTON LS4 We Pres &nt -Nuter i .,
b I"* NS*3*
Docket Number 50-346 License Number NPF-3 Serial Number 1760 February 5, 1990 e
United States Nuclear Regulatory Commission -l Document-Control Desk Vashington, D. C. 20555
Subject:
Revision to Technical Specification Bases to Reflect Cycle 7 Core Reload (TAC Number H75850) i Gentlemen:
The attached provides-changes to the Davis-Besse Nuclear Power Station .
(DBNPS), Unit Number 1, Operating License, Appendix A Technical Specification Bases which vill result from the core reload for Cycle 7 during the sixth refueling outage. The Bases sections affected^are Section 2.1.1 and 2.1.2, Reactor Core; 2~.2.1, Reactor Protection System Instrumentation Setpoints; 3/4.2, Power Distribution Limits:-3/4.2.5, DNB Parameters; and 3/4.4.1,
-Reactor Coolant' Loops.
4 The changes to the Bases sections cited above reflect analyses' contained in a BAV-2096, November 1989, " Davis-Besse Nuclear Power Station Unit 1, Cycle 7 -
1 Reload Report" (Attachment 3). . Specifically, the changes to the Bases
-incorporate the BVC Critical Heat Flux correlation, in addition to the B&V ,
correlation previously referenced, for Departure from Nucleate Boiling Ratio limit determination and the deletion of the references to Batch 1 fuel which no longer. resides in the core. Other changes presented in the Reload Report vill be incorporated in the-Core Operating Limits Report. Utilization of the L LCore Operating Limits Report has been approved by the Nuclear Regulatory Commission in License Amendment Number 144, dated January 11, 1990. .
In addition, an administrative correction is being made to Bases Section ,
2.2.1, " Reactor Protection System Instrumentation Setpoints - RC Pressure Lov,
)4 High, and Pressure Temperature," to reflect the Reactor Coolant System (RCS) -
high pressure. trip setpoint of 2355 psig to be consistent with the Amendment Number 128 (Log; Number 2795,' dated December 28, 1988) authorized increase in ,
the RCS high pressure trip setpoint from 2300 psig. As the safety evaluation l
contained in Serial Number 1464 (dated February 1, 1988) and the Safety Evaluation Report accompanying the License Amendment provided the basis and
. justification for this-change, a further evaluation for this correction is not included herein.
/
THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 gl i,
9002220743 900205
- PDR' ADDCK 05000346 9 ,
. P. PNU_. 3 _ ,
Dockst Nu;ber 50-346 License Number NPF ,
Serial Number 1760
. Page 2- i Attachment 1 provides the Technical Assessment of the Reload Report and [
supporting Bases changes. Attachment 2 provides the marked-up Technical Specification Bases pages which incorporate the changes cited above and in the s
- Reload Report.
It is requested that these changes be issued by May 1, 1990 to facilitate startup following the sixth refueling outage. i If you have any questions or comments, please contact Mr. R. V. Schrauder, Manager - Nuclear Licensing at (419) 249-2366.
Very truly yours, I
]3 ,
i RMC/ssg Attachments cc P. M. Byron, DB-1 NRC Senior Resident Inspector A'. B. Davis, Regional Administrator, NRC Region III T. V. Vanibach, DB-1 NRC Senior Project Manager .
State of Ohio
i r
l 1
'l l
I l
l l
l
Dockst Numb 2r 50-346 Lic2nsa Numb 2r NPF Serial Number 1760 Attachment 1-Page'l Technical Assessment DESCRIPTION OF PROPOSED ACTIVITIES Based on a 10CFR50.59 review of the cycle 7 core reload report, this submittal proposes revisions to Technical Specification (TS) Bases Sections 2.1.1 and 2.1.2, Reactor Core; 2.2.1 Reactor Protection System Instrumentation Setpoints: 3/4.2, Power Distribution Limits; 3/4.2.5, DNB Parameterst and 3/4.4.1, Reactor Coolant Loops for the Cycle 7 core reload which includes the loading of new fuel assemblies (FAs) and burnable poison rod assemblies (BPRAs) and the shuffling of FAs to facilitate nuclear power generation presented in BAV-2096, November 1989, " Davis-Besse Nuclear Power Station Unit 1, Cycle 7 Reload Report" (Attachment 2). The reference cycle for this reload report is Cycle 6. The design and methodology for the Cycle 7 analysis include other changes such as the use of the Mark-B8A FA, the use of anti-straddle lover end fittings, reduced fuel rod pre-pressure and the use of the BVC Critical Heat Flux (CHF) correlation.
SYSTEMS AFFECTED Reactor Core SAFETY FUNCTION OF THE SYSTEMS AFFECTED The safety function of the Reload Report and the affected Core Operating Limits Report (COLR) is to ensure operation of the core within safety limits.
The function of the core is to generate power for a specified duration. The impact on safety is the assurance of the arrangement of the core such that safety limits-are not violated.
EFFECTS ON SAFETY The referenced cycle for the nuclear and thermal hydraulic design of Cycle 7 is Cycle 6. The Cycle 7. physics parameters are based on a 387 effective full power day (EFPD) Cycle 6 length including Axial Power Shaping Rod (APSR) withdrawal and coastdown. Safety analyses for Cycle 7 are valid for a Cycle 6-length of 402 EFPD. Core follow monitoring and analyses ensured that there have been no anomalies during Cycle 6 which would adversely affect fuel performance during Cycle 7 as designed. Consistent with previous cycles, cross-core shuffling of fuel assemblies is minimized in this cycle. The Cycle 7 design is characterized by only 12 FAs being cross-core shuffled so as to minimize any carryover effects from radial power differences accrued from previous cycles.
The design length of Cycle 7 is 415 EFPD. Cycle 7 reactivity vill be controlled by 60 new BPRAs (of the same physical design as used in Cycle 6) located in the fresh fuel, soluble boron and the same 53 full-length Ag-In-Cd control rod assemblies (CRAs) used in previous cycles. The Cycle.7 loading includes 60 new FAs (Batch 9) at 3.38 v/o U-235. This feed batch loading, characterized as Batch 9, is comprised of the Mark-B8A design. The difference between the Mark-B8A design and the Mark-BSA design currently in use are described belov.
j
Docket Nuzb;r 50-346 Lic:n22 Nu bar NFF-3 Serial Number 1760
' Attachment 1 Page 2 The Mark-B8A FA is an improved Mark-B5A FA.vith design features to permit easy reconstitution if defective fuel rods are experienced, allow for high burnup and to provide protection against debris fretting damage to the fuel rods. To permit easy reconstitution,.the upper end fitting (UEF) is designed to be removable in the spent fuel pool. The top spacer grid has been enhanced to provide extra stiffness and the top spacer skirt has been removed. To provide for high burnups, the lover end fitting (LEF) has been shortened by approximately 0.7 inches and the guide and instrument tubes lengthened by approximately 0.7 inches. The fuel rod was lengthened-by 0.4 inches. These ,
changes provide sufficient growth room for the fuel rod to preclude its {
contact with the UEF and LEF at high burnup. Also, for higher burnup capability, the cold worked guide tubes previously employed have been replaced with annealed guide tubes that grow at a slover rate as a function of burnup.
To prevent misalignment when inserting FAs into the core, anti-straddle bars have been added to the lover end fitting. These bars prevent the FA from
- being fully inserted unless it is in the proper position over the lover grid L assembly of the core support internals.
To protect against debris induced fretting failure of the fuel rod, the solid portion of the lover end plug was extended in length. Also, the lover spacer !
grid location was lowered so that the solid end plug extends through the lover j spacer grid. This change is intended to trap any debris capable of fuel rod 1 fretting below the bottom spacer grid. The solid lower end plug vill maintain l the rod's integrity since debris wear of the solid plug would not breach the j rod's pressure boundary. l 1
The solid end plug, however, results in a loss of plenum volume which would !
result in a higher fuel rod pressure with burnup and associated fission gas j release. Part of the gas volume reduction was offset by the 0.4 inch increase j in rod length. In addition, in order to obtain similar mechanical and thermal i performance, when compared with the Mark-B5A, the fill gas pressure (prepressure) was also reduced by approximately 100 psi. This initial i prepressurization has been verified by B&W, and independently by Toledo Edison, to not result in excessive clad creepdown and its resulting clad strain.
The Mark-B8A design incorporates zircaloy in place of inconel for the six intermediate spacer grids. This was done to improve uranium utilization as a result of zircaloy's smaller thermal neutron absorption cross section. The ;
zircaloy spacer grid design-vas approved by the NRC in 1984 and, as required by the NRC Safety Evaluation Report (SER) for the use of the zircaloy design (Rancho Seco Nuclear Generating Station - Evaluation of Mark BZ Fuel Assembly l Design, U. S. Nuclear Regulatory Commission, Washington, D. C., November 16, 1984), a combined seismic and Loss of Coolant Accident (LOCA) loads analysis has been completed (Attachment 4).
The Mark-B8A design has been or vill be used at the following plants: Oconee 2 Cycle ll which commenced in June 1989, Oconee 3 Cycle 12 which is scheduled i to start.in January 1990, and TMI-1 Cycle 7 vhich is scheduled to start in March 1990. ;
i I
L -m j
. = . _ . .
Docket Nunbar 50-346 Licensa Nunbar NPF-3 Serial Number 1760 Attachment l' Page 3 The analytical methods used to calculate the Cycle 7 core physics parameters are unchanged from Cycle 6. Toledo Edison has independently verified Cycle 7's fuel cycle and physics design.
For the thermal-hydraulic design of Cycle 7 there were no changes in the analytical methods. The introduction of the zircaloy grids, which have a higher pressure drop, was investigated for the possibility of a " transition core penalty". -The higher pressure drop has the effect of reducing the flow to the zircaloy grid assemblies' (Mark-B8A) fuel rods. The transition core was determined to be bounded by previous analysis which used a higher bypass flow assumption than exists in Cycle 7. A higher bypass flow also has the effect of reducing the flow to those assemblies' fuel rods. Thus, no penalty is required. Also, though not new methodology, the use of zircaloy grids requires the use of the BVC critical heat flux correlation instead of B&V-2.
This correlation was previously approved by the NRC vith the 1984 incorporation of the zircaloy spacer grid design (BAV-10143P-A, "BVC
' Correlation of Critical Heat Flux," April 1985).
All accidents analyzed in Chapter 15 of the Updated Safety Analysis Report (USAR) have been reexamined with respect to Cycle 7 parameters to ensure that the thermal performance during the hypothetical transients has not been degraded. The hot full power moderator and Doppler coefficients remain negative such that Cycle 7 is bounded for the main steam line break or any other over-cooling transient. The radiological dose consequences of the USAR Chapter 15 accidents have been evaluated using conservative radionuclide source terms that bound the cycle specific source term for Cycle 7 and future reload cycles. The results of the dose evaluations show that the offsite radiological doses for each accident are below the respective acceptance criteria values in the-current NRC Standard Review Plan (SRP), NUREG-0800.
The use of the NRC SRP acceptance criteria was accepted by the NRC in the NRC SER for. Cycle 6 (Log Number 2719 dated October 3, 1988). The bounding values for the allovable LOCA maximum linear heat rates (LHRs) have been reanalyzed for Cycle 7. The reanalysis was submitted to the NRC by letter Serial Number 1720 dated October 16, 1989.
Cycle 7 is the first cycle to use the Core Operating Limits Report (COLR).
Currently, the COLR does not include Section 2 of the TS, i.e., the safety limits. There are no changes to the safety limits for Cycle 7. The COLR figures for rod index and. axial power imbalance and the table for quadrant power tilt vill be updated to reflect the Cycle 7 values. The slight differences from the Cycle 6 TS values are to account for small changes in power peaking and control rod worths.
This reload also requires several TS Base: changes. Except for one change to delete a reference to batch 1, since no reinserted FAs are used in Cycle 7, all Bases changes are to include the use of the BUC critical heat flux correlation. As stated above, the BVC correlation is to be used for the Batch 9 fuel due to the zircaloy spacer grids.
The planned startup physics test program is unchanged in scope from Cycle 6.
l
i um u Docket Nunbar 50-346 H Liesnsa Nu:bar NPF-3 Serial Number 1760 Attachment 1
-Page 4 UNREVIEVED SAFETY OUESTION EVALUATION The proposed action vould not increase the probability of occurrence of an accident previously evaluated in the USAR because the probability of any accident which is presently. analyzed in the Davis-Besse USAR is independent of the core loading pattern and is also independent of the other modifications discussed above. (10CFR50.59(a)(2)(1))
The proposed action would not increase the consequence of an accident beyond the present' acceptance criteria previously evaluated in the USAR. All accidents have been reviewed to ensure that they are bounded by the existing analysis. The results of the USAR dose evaluations performed showed that the offsite radiological doses for each accident in the USAR vere below the respective acceptance criteria values in the current NRC Standard Review Plan, NUREG-0800, as accepted by the NRC in the Cycle 6 SER (Log Number 2719 dated October 3, 1988). (10CFR50.59(a)(2)(i))
The proposed action would not increase the probability of occurrence of a malfunction of equipment important to safety because the probability of a malfunction of equipment is independent of the core loading pattern and is also independent of the other modifications discussed above.
(10CFR50.59(a)(2)(i))
The proposed action would not increase the consequence of a malfunction of equipment important to safety beyond the present acceptance criteria because the results of the USAR dose evaluations performed shoved that the offsite radiological doses for each accident in the USAR vere below the respective acceptance criteria values in the current NRC Standard Review Plan, NUREG-0800, as-accepted by the NRC in the Cycle 6 SER (Log Nuaber 2719 dated October 3, 1988). (10CFR50.59(a)(2)(ii))
The proposed action would not create a possibility for an accident of a different type than any evaluated previously in the USAR because there have been no hardware changes or design modifications which would create the possibility for an accident of a different type than previously evaluated.
(10CFR50.59(a)(2)(ii))
The proposed action would not create a possibility for a malfunction of equipment of a different type than any evaluated previously in the USAR because there have been no hardware changes or design modifications which would create the possibility for a malfunction of equipment of a different type than previously evaluated. (10CFR50.59(a)(2)(li))
The proposed action would not reduce the margin of safety as defined in the basis for the Technical Specifications because, where required, the COLR vill be changed to ensure the margin of safety. (10CFR50.59(a)(2)(lii))
CONCLUSION Pursuant to the above, it is concluded that the changes proposed as described in the Reload Report do not involve an unreviewed safety question.