Forwards Safety Evaluation Accepting Util Second 10-yr Interval Insp Program Plan.Technical Evaluation Rept Also Encl
ML20006D668
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/11/1990
From: Capra R
Office of Nuclear Reactor Regulation
To: Creel G
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20006D669 List:
References
TAC-67094, TAC-67095, NUDOCS 9002140210
Download: ML20006D668 (4)


Text

t 3W,

m ['[

  • g UNITED STATES g/c m

f NUCLEAR REGULATORY COMMISSION g.a'y.*...y waswiwotoN. o. c. rosss l

J j

~

January 11, 1990 b

. Docket-Nos. 50-317 and 50-318 l

l l

Mr. G. C. Creel i

l Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant M0 Rtes. 2 & 4 P. O. Box 1535-Lusby, Maryland 20657

Dear Mr. Creel:

l

SUBJECT:

APPROVALOFSECONDTEN-YEARINSERVICEINSPECTIONPROGR PLAN FOR CALVERT CLIFFS UNITS 1 AND 2 i

(UNIT 1 TAC 67094; UNIT 2 TAC 67095)

July 22 and DecemberWe have completed our review of your submittals dated 1

29, 1988 June 29, (ISI) Program Plan for the second 10-year ISI interval at Calvert {

i Units 1 and 2.

i The NRC staff has determined that the ASME Code Section XI requirements i

are impractical to perform at-Calvert Cliffs Units 1 an i

granted are authorized by law and will not endanger life, property or the j

due consideration to the burden upon the licensee that p

requirements were imposed on the facility.

i E

relief, as provided in the second. ten-year ISI interval at Calvert-CliffsCo 1

i Units.1 and 2, comp y with the requirements of the Atomic Energy Act of 195

?

as amended (the Act, and the Commission has made appropriate-findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter 1.

of-the ASME Boiler and Pressure Vessel Code and the ap i

hereby granted.

relief are contained in the enclosed Safety Evaluation.A suninary of t Furthermore,.the NRC staff has found that the ISI Program Plan for the second

- ten-year ISI interval at Calvert Cliffs Units 1 and 2 and the ASME Code reliefs

~j of 10 CFR 50.55a, " Codes.and Standards " and with Units Specification 4.0.5 and therefore, are, acceptable.

4^

t However, as discussed in the enclosed Safety Evaluation the NRC staff has determined'that the second ten-year ISI Program Plan must be revised to include volumetric and surface examinations of a representative sampling of O

ruww.

a

y.

?

s w

gypj %^

y, 9

-Mr. G. C. Creel 2-January 11, 1990 V

Class 2 piping welds in the Containment Spray and Shutdown Cooling system.

It is requested that you submit this revision to the ISI Program Plan within 120 days of the-date of issuance of this letter. -This request for information affects fewer than 10 respondents; therefore, OMB clearance is not required under Public Law 76-511..

g l The second ten-year interval for Calvert Cliffs Units 1 and 2 began on' April 1, 1987 and expires on April 1, 1997.

-l Sincerely, i

original signed by l

Robert A. Capra, Director Project Directorate I.1 Division of Reactor Projects. I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Safety-Evaluation Report-

)

2.

Technical Evaluation Report j

EGG-MS.8403 cc w/ enclosures:

.See next-page DISTRIBUTION L<MM CVogan

-NRC & Local PDRs

-SMcNeil l

PDI.1'R/F OGC SVarga EJordan

.BBoger TMeek(4)

RCapra' ACRS(10)

JWiggins.

GPA/PA GJohnson CYCheng l

TMurley/JSniezek JPartlow

-OC/LFMB-l L

  • See previous concurrence DFC'..:: LA : PDI.1 g_.::..DGC
PM:PDI-l
D:PDI.1

.....g.....:.......;....:..... g MAME?:CVogan

SMcNiel:b1d :RCapra DATEJ:11/ /89
11/ /89
O'/to/D9 9D ill/24/89 0FFICIAL RECORD COPY

. Document Name: CC 2ND ISI 67094/67095

p+

(3etl, u

K#

h,

% g[. _ ?-

)).

-,c I r.! G.'C. Creel-

.2.-

[

M l ' ~'

"I 4

recommendation is not-required, it is suggested that you evaluate t s concern!

r iand document your resolutions. -

1 3

s

~

$Thesecondten-yearintervalforCalvertCliffsUhits1and2-gan.on April 1,

(

,L.987 and expires;:on April 1,~1997.

1

);,

l Ds gs j

y ji 7

i 9

y p

s_

i ff%

'T Robert A.

apra, Director 1

" : p' i*

C Project. rectorate I.1

-l Divisio of Reactor Projects'. I/II 1_,

gle, Office of Nuclear Reactor Regulation i

. 1

/

Enclosures:

'1

1. ' Safety Evaluation Report 2-Technical Evaluation Report

~ EGG-MS.8403 cc w/ enclosures:-

See next page

~

l

_j u

'V DISTRIBUTION

. Docket File CVogan NRC;& Local.PDRs:

SMcNeil PDI.1 R/F' OGC

'[

-SVarga:

-EJor n

'BBoger TMeeli (4)

RCapra-ACRS(10) j JWiggins' GPA/PA GJohnson-

,tYCheng-TMurley/JSniezek / JPartlow 10C/LFM9

/-

L g..

...d 3 t

f UFC LA:PDI 1

PM:PDI 1
D:PDI-l
OGC I" :

^:.....:...........:.......

(....:............:............:..........

P

[NAMEJ tCYoganL

SMcNM1
RCapra
}2.........:............:............:.........
.....
...........:...........:............: 4

.11/.]) /.89..

VD.AT.E..11/.p89...

11/.A. l./.89.... :.11. /.. /.89....

0FFICIAL RECORD COPY Document Name:-- CC 2ND ISI 67094/67095

'n i

, ' ' (h '-

y yl k.o s

II W

V

p Mr. G. C.. Creel Baltimore Gas & Electric Company Calvert' Cliffs Nuclear Power Plant Cc '

Mr. William T. Bowen, President Mr. Joseph H. Walter-Calvert County Board of Engineering Division Corri ssioners Public Service Comission of Maryland Prince Frederick, Maryland 20678 American Building 231 E. Baltimore Street Baltimore, Maryland 21202-3486

0. A. Brune. Esq.

General Counsel Baltimore Gas and Electric Company Ms. Kirsten A. Burger, Esq.

P. O. Box 147F Maryland People's Counsel Baltimore, Maryland.71?03 American Building, 9th Floor 231 E. Baltimore Street Mr. Jay E. Silberg, Esq.

Baltimore, Maryland 21202 Shaw,:Pittman, Potts and Trowbridge 2300 N Street, NW Ms. Patricia Birnie Washington, DC.?0037 Co-Director Maryland Safe Energy Coalition Mr. W. J. Lippold. General Supervisor P. O. Box 90?

Technical Services Engineering Columbia, Maryland M044 Calvert Cliffs Nuclear Power Plant MD Rts 2 3 4, P. O. Box 1535 Lusby, Maryland 20657 1,

. Resident Inspector' l

1 c/o U.S. Nuclear Regulatory Comissien P. O. Box.437 1

. Lusby, Maryland 20657 i,

Mr. Thomas Magette Administrator - Nuclear Evaluations Department of Natural Resources 580 Taylor Avenue:

l Tawes State Office Building PPER P3 l

. Annacolis, Maryland 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission l

-475 Allendale Road King of erussia, Pennsylvania 19406 1~

l

.